{"builtFrom":{"niaWorkbook":"data_sources/2026-11-10--with geolocation_bettergov-house-bill-2027-nia-projects.xlsx","nimpFiles":2,"rimpFiles":287,"rdcFiles":34,"powFiles":140,"planDocumentsParsed":125},"fgis":{"source":"NIA Farmland Geographic Information System · canal network shapefiles","crs":"EPSG:32651 (WGS 84 / UTM zone 51N)","shapefiles":259,"features":38285,"canalLengthKm":28545.2,"regions":{"CAR":4,"MARIIS":9,"Region I":27,"Region II":19,"Region III":14,"Region IV-A":39,"Region IV-B":12,"Region IX":6,"Region V":16,"Region VI":14,"Region VII":4,"Region VIII":21,"Region X":12,"Region XI":9,"Region XII":18,"Region XIII":12,"UPRIIS":22},"usableShapefiles":258},"fgisFingerprint":[["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/CAR/Abra/abra_canal.shp",77860,1794470329654271756],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/CAR/Hapid/hapid_canal.shp",68900,1794470329661609553],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/CAR/Lower Chico/lowerchico_canal.shp",637768,1794470329671459118],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/CAR/West Apayao Abulug/westapayao_canal.shp",296640,1794470329683834699],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Balikatan DD div 1/balikatandiv1_canal.shp",641536,1794470329693862306],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Balikatan DD div 2/balikatandiv2_canal.shp",122184,1794470329699757594],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 1/magatdiv1.shp",546396,1794470329707826772],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 2/magatdiv2_canal.shp",150228,1794470329713691102],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 3/magatdiv3_canal.shp",703296,1794470329723031246],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 3 pump/magatdiv3_canal.shp",126252,1794470329728063654],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 3 pump 3/magatdiv3pump3_canal.shp",91428,1794470329734895491],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 4/magatdiv4_canal.shp",122484,1794470329741449491],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Siffu/siffu_canal.shp",249608,1794470329747052986],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Agno/agno_canal.shp",180792,1794470329754514076],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Ambayoan/ambayoan_canal.shp",156572,1794470329761311412],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Amburayan/amburayan_canal.shp",76964,1794470329766295861],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Banaoang PIS/banaoang_canal.shp",32676,1794470329769402049],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Bolo/bolo_canal.shp",75496,1794470329774425873],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Bonga Pump 1/bongapump1_canal.shp",4452,1794470329776066842],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Bonga Pump 2/bongapump2_canal.shp",11384,1794470329778704943],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Bonga Pump 3/bongapump3_canal.shp",2208,1794470329782293466],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Cura/cura_canal.shp",103156,1794470329786578827],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Dingras/dingras_canal.shp",10444,1794470329788203171],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Dipalo/dipalo_canal.shp",143448,1794470329793055203],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Dumuloc/dumuloc_canal.shp",21476,1794470329796147765],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Gaco/gaco_canal.shp",28740,1794470329799644288],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Labugaon/labugaon_canal.shp",30380,1794470329803494605],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Laog Vintar/loaogvintar_canal.shp",53044,1794470329806856960],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Lower Agno/loweragno_canal.shp",107384,1794470329811463907],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Masalip/masalip_canal.shp",37084,1794470329816506231],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/NMC/nmc_canal.shp",44032,1794470329822269519],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Nueva Era/nuevaera_canal.shp",68216,1794470329826516797],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Papa/papa_canal.shp",16564,1794470329829622150],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/San Fabian/sanfabian_canal.shp",34040,1794470329833047923],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Sinocalan/sinocalan_canal.shp",38348,1794470329836875698],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Solsona/solsona_canal.shp",17404,1794470329840218553],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Sta Lucia Candon/staluciacandon_canal.shp",24812,1794470329842069190],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Sta. Maria Burgos/stamariaburgos_canal.shp",67260,1794470329847003555],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Sulvec/sulvec_canal.shp",28284,1794470329850741955],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Suyo Tagudin/suyotagudin_canal.shp",8988,1794470329854561730],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Addalam/addalam_canal.shp",327760,1794470329862179405],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Baggao/baggao_canal.shp",57596,1794470329867250771],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Banurbur Creek/banurburcreek_canal.shp",40780,1794470329874796029],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Baua/baua_canal.shp",195596,1794470329880160480],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Chico River PIS/chicoriverpis_canal.shp",60180,1794470329884756427],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Colonol INIS/colonol_canal.shp",81556,1794470329888536577],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Dabubu/dabubu_canal.shp",21788,1794470329892113725],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Dibuluan/dibuluan_canal.shp",125508,1794470329895384122],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Dummun/dummun_canal.shp",89892,1794470329897636803],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/East Apayao Abulug/eastapayaoabulug_canal.shp",148500,1794470329899814900],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Iguig Alcala Amulung/iguigalcala_canal.shp",112,1794470329901031450],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Lower Chico/lowerchico_canal.shp",117828,1794470329904561098],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Mallig/mallig_canal.shp",241548,1794470329908856501],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Nassiping/nassiping_canal.shp",34536,1794470329913522990],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Nueva Vizcaya Bagabag/nuevavizcayabagabag_canal.shp",31732,1794470329917986686],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Pasa SRIS/pasa_canal.shp",105172,1794470329920888497],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Pinacauan/pinacuan_canal.shp",22644,1794470329923673306],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Solona/solona_canal.shp",40776,1794470329928002418],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Visitacion/visitacion_canal.shp",164476,1794470329933659080],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Zinundungan/zinundungan_canal.shp",103900,1794470329936913476],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/AMRIS Pampanga/amrispampanga_canal.shp",452264,1794470329944062606],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/AMRIS bulacan/amrisbulacan_canal.shp",858424,1794470329953180833],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/AMRO/amro_canal.shp",14540,1794470329956579480],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Bucao/bucao_canal.shp",70924,1794470329962435851],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/CAM RIS/camris_canal.shp",159484,1794470329967548676],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Colo/colo_canal.shp",85032,1794470329973518924],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Disalit/disalit_canal.shp",11900,1794470329975182685],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Gumain/gumain_canal.shp",10572,1794470329977909036],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Layak Balsik/layakbalsik_canal.shp",20940,1794470329982871901],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/NB RIS/nb_canal.shp",95664,1794470329988653564],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Pampanga Delta/pdris_canal.shp",60292,1794470329992074795],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Tarlac Ground Water IS/tgwis_canal.shp",135636,1794470329998819589],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Tasmo RIS/tasmo_canal.shp",99948,1794470330003325118],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/porac/porac_canal.shp",156024,1794470330008353318],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Agos/agos_canal.shp",47284,1794470330012913389],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Balanac/balanac_canal.shp",36068,1794470330018964346],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Balayungan div 1/balayungandiv1_canal.shp",71460,1794470330023211165],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Balayungan div 2/balayungandiv2_canal.shp",196220,1794470330029479914],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Baluctot/baluctot_canal.shp",30348,1794470330032998229],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Butas/butas_canal.shp",25764,1794470330034861949],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Butas Lawang bato/butaslawangbato_canal.shp",9064,1794470330036533252],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Butas Marcelo/butasmarcelo_canal.shp",37832,1794470330040770446],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Butas Palanas/butaspalanas_canal.shp",13236,1794470330042334248],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Cabuyao East/cabuyaoeast_canal.shp",12828,1794470330044002009],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Culong Culong/culong_canal.shp",45668,1794470330047841493],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Dambo/dambo_canal.shp",24780,1794470330050791095],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Diezmo/diezmo_canal.shp",24356,1794470330054253326],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Dumacaa/dumacaa_canal.shp",65388,1794470330059178192],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Embarcadero/embarcadero_canal.shp",4788,1794470330061764959],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Hanagdong/hanagdong_canal.shp",21568,1794470330066369155],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Kay akle/kayakle_canal.shp",34212,1794470330068142750],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Lagnas/lagnas_canal.shp",11668,1794470330069914428],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Lumban/lumban_canal.shp",3812,1794470330071892233],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Mabacan/mabacan_canal.shp",12340,1794470330073733578],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Mabacao/mabacao_canal.shp",3420,1794470330075004670],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Macabling/macabling_canal.shp",24940,1794470330076745348],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Makuling/makuling_canal.shp",18364,1794470330078428318],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Malaunod/malaunod_canal.shp",25412,1794470330080858500],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Matanda div 5/matanda5_canal.shp",152052,1794470330086988082],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Matanda div 6/matanda6_canal.shp",152052,1794470330092771911],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Mayor/mayor_canal.shp",35588,1794470330096995522],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Molino/molino_canal.shp",11780,1794470330099554039],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Palico/palico_canal.shp",30236,1794470330102507183],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Pasong Kastila/pasongkastila_canal.shp",22668,1794470330105265868],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Plucena Bayan/plucenabayan_canal.shp",11372,1794470330106798586],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Sahing/sahing_canal.shp",12448,1794470330109954232],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/San Agustine/sanagustine_canal.shp",26236,1794470330113240837],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/San Cristobal/sancristobal_canal.shp",43172,1794470330114830930],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/San Juan/sanjuan_canal.shp",22764,1794470330116232356],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Sta Cruz/stacruz_canal.shp",60012,1794470330119774837],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Sta Maria/stamaria_canal.shp",34300,1794470330123593571],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Tres Cruzes/trescruzes_canal.shp",26820,1794470330126018420],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Vargas/vargas_canal.shp",39100,1794470330129188149],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Amnay/amnay_canal.shp",16532,1794470330133239425],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Baco Bacayao/bacobocayao_canal.shp",32484,1794470330137331327],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Bansud/bansud_canal.shp",12788,1794470330138931213],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Batangbatang/batangbatang_canal.shp",73108,1794470330143357825],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Caguray/caguray_canal.shp",20388,1794470330145355880],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Cantingas/cantingas_canal.shp",6740,1794470330148533567],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Lumintao/lumintao_canal.shp",11116,1794470330151770922],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Magasawang Tubig/magasawangtubig_canal.shp",19228,1794470330156311118],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Malatgao/malatgao_canal.shp",20684,1794470330159390513],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Mongpong/mongpong_canal.shp",57040,1794470330164136627],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Pagbahan/pagbahan_canal.shp",152884,1794470330169588955],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Pula/pula_canal.shp",23620,1794470330174361278],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Dipolo/dipolo_canal.shp",19664,1794470330179567645],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Dipolog/dipolog_canal.shp",37860,1794470330185353308],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Ditay/ditay_canal.shp",6692,1794470330187988033],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Labangan/libangan_canal.shp",27388,1794470330193384985],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Salug/salug_canal.shp",78192,1794470330197117926],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Sibuguey Valley/sibuguey_canal.shp",22340,1794470330202547962],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Barit/barit_canal.shp",127880,1794470330207435660],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Cabilogan San Juan/cabilogansanjuan_canal.shp",123440,1794470330210550931],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Daet Talisay/daettalisay_canal.shp",58776,1794470330214786500],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Hibiga/hibiga_canal.shp",41164,1794470330219245737],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Libmaan Cabusao/libmaancabusao_canal.shp",168072,1794470330226844121],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Lower lalo/lowerlalo_canal.shp",94892,1794470330232302489],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Mahaba/mahaba_canal.shp",87644,1794470330236440016],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Matogdon/matogdon_canal.shp",32340,1794470330240187041],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Nasisi/nasisi_canal.shp",55972,1794470330245083156],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Ogsong/ogsong_canal.shp",34900,1794470330249404851],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Rida/rida_canal.shp",114884,1794470330254240716],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/San Francisco/sanfrancisco_canal.shp",23212,1794470330257350486],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/San Ramon/sanramon_canal.shp",20816,1794470330261288554],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/South Quinale/southquinale_canal.shp",44996,1794470330266024418],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Tigman Hinayan Inarihan/tigman_canal.shp",279268,1794470330272463794],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Upper lalo/upperlalo_canal.shp",54220,1794470330277598119],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Aganan/aganan_canal.shp",8532,1794470330281587145],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Aklan East/east_canal.shp",21040,1794470330285093918],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Aklan West/west_canal.shp",35724,1794470330289511821],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Bago/bago_canal.shp",59164,1794470330293896558],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Barotac Viejo/barotac_canal.shp",19604,1794470330297781834],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Jalaur Extension/jalaurextension_canal.shp",39752,1794470330301126397],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Jalaur Proper/jalaurproper_canal.shp",52952,1794470330305721136],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Mambusao/mambusao_canal.shp",16188,1794470330309346034],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Panakuyan/panakuyan_canal.shp",14212,1794470330312581639],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Pangiplan/pangiplan_canal.shp",13552,1794470330316678874],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Sibalom/sibalom_canal.shp",19656,1794470330320657817],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Sibalom San Jose/sibalomsanjose_canal.shp",48284,1794470330323834212],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Sta Barbara/stabarbara_canal.shp",10548,1794470330326798774],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Suage/suague_canal.shp",20988,1794470330328815870],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VII/Bayongan/bayongan_canal.shp",162588,1794470330334997744],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VII/Capayas/capayas_canal.shp",73848,1794470330339252521],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VII/Malinao/malinao_canal.shp",273820,1794470330346133483],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VII/Talibon/talibon_canal.shp",62692,1794470330350363553],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Balire North/balirenorth_canal.shp",2708,1794470330352791027],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Balire South/baliresouth_canal.shp",3172,1794470330354180119],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Bao/bao_canal.shp",29468,1794470330358353105],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Basey/basey_canal.shp",56668,1794470330360078241],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Binahaan north/binahaannorth_canal.shp",12496,1794470330363009010],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Binahaan south/binahaansouth_canal.shp",4000,1794470330364948064],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Bito/bito_canal.shp",20340,1794470330367976209],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Calbiga/calbiga_canal.shp",35636,1794470330370506976],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Catarman Bobon/catarmanbobon_canal.shp",33432,1794470330374706462],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Catubig/catubig_canal.shp",224652,1794470330378729196],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Daguitan/daguintan_canal.shp",94000,1794470330383992772],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Das ay/dasay_canal.shp",75908,1794470330389670226],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Gibuga/gibuga_canal.shp",12144,1794470330392787663],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Guinarona/guinarona_canal.shp",6976,1794470330394478674],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Hindang Hilongos/hindanghilongos_canal.shp",10112,1794470330396968107],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Ibawon/ibawon_canal.shp",2388,1794470330399073287],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Lower Binahaan/lowerbinahaan_canal.shp",5144,1794470330402190766],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Mainit/mainit_canal.shp",32412,1794470330405393662],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Marabong/marabong_canal.shp",4692,1794470330406748296],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Pongso/pongso_canal.shp",14940,1794470330408441974],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Tibak/tibak_canal.shp",29276,1794470330410900240],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Balingasag/balingasag_canal.shp",102808,1794470330416839487],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Bubunawan/bubunawan_canal.shp",7316,1794470330421567226],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Malaig/malaig_canal.shp",101096,1794470330426297382],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Manupali/manupali_canal.shp",308968,1794470330432805841],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Maranding/maranding_canal.shp",361896,1794470330439076882],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Masiu/masiu_canal.shp",59868,1794470330443444577],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Muleta/muleta_canal.shp",407012,1794470330448760945],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Pulangui/pulangui_canal.shp",1041512,1794470330458282924],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Roxas Kuya/roxaskuya_canal.shp",5268,1794470330461162443],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Rugnan/rugnan_canal.shp",144304,1794470330466628145],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Talakag/talakag_canal.shp",7972,1794470330469581081],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Tangub/tangub_canal.shp",9212,1794470330471951805],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Batutu/batutu_canal.shp",30588,1794470330476413043],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Kipaliku/kipaliku_canal.shp",91152,1794470330481964787],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Lasang/lasang_canal.shp",129728,1794470330487531282],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Libuganon/libuganon_canal.shp",202848,1794470330491704643],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Libuganon Left/libuganonleft_canal.shp",41956,1794470330495494834],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Lupon/lupon_canal.shp",28972,1794470330499032857],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Mal/mal_canal.shp",29432,1794470330503056842],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Padada/padada_canal.shp",55636,1794470330506551406],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Saug/saug_canal.shp",188444,1794470330512376861],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Ala/ala_canal.shp",16404,1794470330516344887],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Alip/alip_canal.shp",7860,1794470330519301198],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Antong/antong_canal.shp",3948,1794470330521179752],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Banga/banga_canal.shp",23932,1794470330523545559],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Buayan/buayan_canal.shp",44732,1794470330526401661],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Kabacan/kabacan_canal.shp",76420,1794470330529547973],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Kabulnan/kabulnan_canal.shp",65028,1794470330533699125],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Lambayong/lambayong_canal.shp",111748,1794470330538311739],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Libungan/libungan_canal.shp",311892,1794470330544306320],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Malasila/malasila_canal.shp",49708,1794470330547588466],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Marbel 1/marbel1_canal.shp",20348,1794470330550817695],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Marbel 2/marbel2_canal.shp",85212,1794470330554743346],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Maridagao/maridagao_canal.shp",99004,1794470330559724420],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Mlang/mlang_canal.shp",22668,1794470330563620321],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Siluay/siluay_canal.shp",10872,1794470330565505875],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Sinawal/sinawal_canal.shp",8284,1794470330568176517],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Tacurong/tacurong_canal.shp",6204,1794470330570884743],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Talayan/talayan_canal.shp",5740,1794470330573984555],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Andanan Wawa/andananwawa_canal.shp",15620,1794470330576932366],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Baobo/baobo_canal.shp",3916,1794470330579657967],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Baoy/baoy_canal.shp",11116,1794470330583097073],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Cabadbaran Taguibo/cabadcaran_canal.shp",52352,1794470330587121016],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Cantilan/cantilan_canal.shp",20508,1794470330590643747],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Gibong/gibong_canal.shp",29124,1794470330595077860],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Lower Agusan River/larpis_canal.shp",42876,1794470330601323192],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/MAP IS/map_canal.shp",51552,1794470330605303426],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Simulao/simulao_canal.shp",15376,1794470330607268814],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Sta Josefa/stajosefa_canal.shp",9660,1794470330609908706],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Tago/tago_canal.shp",39732,1794470330614159651],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Umayam/umayam_canal.shp",27532,1794470330617627757],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Aliaga/aliaga_canal.shp",27152,1794470330622677623],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Along-along/alongalong_canal.shp",19640,1794470330626634066],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Aulo/aulo_canal.shp",11084,1794470330629711211],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Balbalugao/balbalugao_canal.shp",11828,1794470330633174234],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Lower Talavera/lowertalavera_canal.shp",12644,1794470330637502678],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Macanae/macanae_canal.shp",4908,1794470330641477413],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Marikit/marikit_canal.shp",6164,1794470330643437676],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Murcon Creek/murconcreek_canal.shp",32900,1794470330646962324],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/PRIS SDC/prissdc_canal.shp",118260,1794470330652623527],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/PRIS SDC Phase 2/prissdcp2_canal.shp",78712,1794470330655624964],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pamaldan Cinco Cinco/pamaldancinco_canal.shp",6084,1794470330658859985],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pampanga Bongabon/pambongabon_canal.shp",115352,1794470330669630805],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pampanga Bungabon Extension/pambongabonextension_canal.shp",62504,1794470330674803839],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pampanga River/pamriver_canal.shp",798964,1794470330684063774],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Penablanca RIS/penris_canal.shp",144612,1794470330689562310],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pinagquartelan/pinagquartelan_canal.shp",2812,1794470330691766616],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Platero/platero_canal.shp",7068,1794470330694722802],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Rizal Munic/rizalmunic_canal.shp",164700,1794470330701135761],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Talavera Upper/talaveraupper_canal.shp",35076,1794470330705228829],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Talavera lower/talaveralower_canal.shp",151172,1794470330712434085],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Upper Tabuating/uppertabuating_canal.shp",8444,1794470330715497688],["FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Vaca/vaca_canal.shp",12124,1794470330718020955]],"fgisSystems":[{"name":"Abra","region":"CAR","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/CAR/Abra/abra_canal.shp","featureCount":114,"lengthM":77734.7,"bounds":[241257.0678294559,1942426.0963897207,253777.13537430472,1949682.2914320447]},{"name":"Hapid","region":"CAR","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/CAR/Hapid/hapid_canal.shp","featureCount":70,"lengthM":95506.0,"bounds":[301888.08158096485,1841242.9965465623,317495.9169330647,1853659.2262255687]},{"name":"Lower Chico","region":"CAR","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/CAR/Lower Chico/lowerchico_canal.shp","featureCount":982,"lengthM":728911.2,"bounds":[328686.5485920886,1899715.6193308756,358476.5467664802,1945678.8498660463]},{"name":"West Apayao Abulug","region":"CAR","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/CAR/West Apayao Abulug/westapayao_canal.shp","featureCount":656,"lengthM":374627.8,"bounds":[326365.76972786325,2013929.977485508,334364.26284393115,2041420.7352654317]},{"name":"Balikatan DD div 1","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Balikatan DD div 1/balikatandiv1_canal.shp","featureCount":1420,"lengthM":703581.9,"bounds":[334457.6659355122,1826586.0964966079,351276.97226864233,1860333.0889910338]},{"name":"Balikatan DD div 2","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Balikatan DD div 2/balikatandiv2_canal.shp","featureCount":302,"lengthM":163620.4,"bounds":[339111.862637043,1851948.1022649857,345203.23028881755,1861568.2651353031]},{"name":"Magat div 1","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 1/magatdiv1.shp","featureCount":1162,"lengthM":822656.7,"bounds":[338620.40629464807,1841712.346046195,363876.6456658626,1859667.7974000666]},{"name":"Magat div 2","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 2/magatdiv2_canal.shp","featureCount":124,"lengthM":409329.0,"bounds":[340658.5760704781,1851557.8967172042,368748.718925786,1877110.45382805]},{"name":"Magat div 3","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 3/magatdiv3_canal.shp","featureCount":1321,"lengthM":650437.2,"bounds":[343541.9932423333,1865368.7370859494,371004.71461009886,1894755.3215967428]},{"name":"Magat div 3 pump","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 3 pump/magatdiv3_canal.shp","featureCount":169,"lengthM":166459.1,"bounds":[360176.1999191353,1882767.651691159,372531.8160036402,1891803.8605204318]},{"name":"Magat div 3 pump 3","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 3 pump 3/magatdiv3pump3_canal.shp","featureCount":46,"lengthM":86532.6,"bounds":[365949.01146544144,1884322.8307958115,373845.4505004883,1892369.6724853516]},{"name":"Magat div 4","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Magat div 4/magatdiv4_canal.shp","featureCount":102,"lengthM":339530.3,"bounds":[353513.2280331226,1858992.519565737,374941.48991099925,1881117.4477500722]},{"name":"Siffu","region":"MARIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/MARIIS/Siffu/siffu_canal.shp","featureCount":680,"lengthM":470748.5,"bounds":[346823.44641781255,1880999.0087285866,368183.03325990733,1899009.449350316]},{"name":"Agno","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Agno/agno_canal.shp","featureCount":62,"lengthM":352660.9,"bounds":[222111.1853761409,1758559.0098656768,255509.25230619972,1784418.8279048633]},{"name":"Ambayoan","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Ambayoan/ambayoan_canal.shp","featureCount":97,"lengthM":239368.6,"bounds":[249183.1685432489,1762900.00443701,264623.4766897837,1783302.4564496707]},{"name":"Amburayan","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Amburayan/amburayan_canal.shp","featureCount":42,"lengthM":118080.9,"bounds":[219798.52046974056,1861606.1501050417,234160.84690751965,1871193.140043931]},{"name":"Banaoang PIS","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Banaoang PIS/banaoang_canal.shp","featureCount":10,"lengthM":52934.7,"bounds":[219960.83334891676,1941618.7794943524,230372.98699588544,1958229.4905670602]},{"name":"Bolo","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Bolo/bolo_canal.shp","featureCount":86,"lengthM":61003.7,"bounds":[259352.22043950015,2048264.3566618771,271540.8485423833,2051546.5510267531]},{"name":"Bonga Pump 1","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Bonga Pump 1/bongapump1_canal.shp","featureCount":8,"lengthM":7156.7,"bounds":[248358.75849498727,2005932.3436335807,250255.31150628996,2009600.8231682251]},{"name":"Bonga Pump 2","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Bonga Pump 2/bongapump2_canal.shp","featureCount":6,"lengthM":17028.3,"bounds":[242549.96829452913,2008642.0465648465,247490.67791519282,2011578.4411859892]},{"name":"Bonga Pump 3","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Bonga Pump 3/bongapump3_canal.shp","featureCount":5,"lengthM":4715.5,"bounds":[241155.0276812284,2012449.1064539899,242881.46550649466,2014014.2850670358]},{"name":"Cura","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Cura/cura_canal.shp","featureCount":202,"lengthM":100004.2,"bounds":[258298.6199982375,2005235.539427173,270571.1109615424,2009059.2774061537]},{"name":"Dingras","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Dingras/dingras_canal.shp","featureCount":6,"lengthM":27679.7,"bounds":[253888.17440097887,1992735.3331717562,257336.9236039309,2006604.7592101616]},{"name":"Dipalo","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Dipalo/dipalo_canal.shp","featureCount":86,"lengthM":187488.6,"bounds":[249466.53343454108,1759694.1439174695,270296.22206930065,1770318.3689350095]},{"name":"Dumuloc","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Dumuloc/dumuloc_canal.shp","featureCount":12,"lengthM":33089.5,"bounds":[198509.0112583153,1760820.0390918497,203840.36648090824,1768011.579222545]},{"name":"Gaco","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Gaco/gaco_canal.shp","featureCount":8,"lengthM":29312.1,"bounds":[227794.5217338632,1964230.9195103687,236774.6684739759,1969498.6948192671]},{"name":"Labugaon","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Labugaon/labugaon_canal.shp","featureCount":43,"lengthM":64776.6,"bounds":[259350.5565915524,2001695.402410234,271152.23019828286,2004869.8459108034]},{"name":"Laog Vintar","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Laog Vintar/loaogvintar_canal.shp","featureCount":14,"lengthM":77797.8,"bounds":[242212.31305803015,2009835.9804504681,254427.57868747305,2018726.1541647231]},{"name":"Lower Agno","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Lower Agno/loweragno_canal.shp","featureCount":44,"lengthM":207078.8,"bounds":[232427.3425639906,1741997.0877754462,249794.69546762778,1762247.908265189]},{"name":"Masalip","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Masalip/masalip_canal.shp","featureCount":18,"lengthM":70174.6,"bounds":[215924.6315370763,1799966.2387444084,225550.59602538397,1814292.843747891]},{"name":"NMC","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/NMC/nmc_canal.shp","featureCount":5,"lengthM":38573.0,"bounds":[247120.19098403386,2018340.4275711458,256511.61498639657,2027932.5365366233]},{"name":"Nueva Era","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Nueva Era/nuevaera_canal.shp","featureCount":140,"lengthM":53839.6,"bounds":[252326.10238707365,1981968.1035954144,255453.24426266414,1986561.4822852362]},{"name":"Papa","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Papa/papa_canal.shp","featureCount":12,"lengthM":45505.0,"bounds":[254319.98956226517,1986531.328382829,260218.75781861827,1994394.7726927965]},{"name":"San Fabian","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/San Fabian/sanfabian_canal.shp","featureCount":18,"lengthM":62807.9,"bounds":[224334.89054554602,1776590.616168933,229214.5516339867,1787856.6939867649]},{"name":"Sinocalan","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Sinocalan/sinocalan_canal.shp","featureCount":17,"lengthM":57094.0,"bounds":[217748.8851784165,1767799.632113324,223487.62068219364,1779708.201640556]},{"name":"Solsona","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Solsona/solsona_canal.shp","featureCount":9,"lengthM":32084.5,"bounds":[262844.7045596427,1995149.8293149578,268713.4946493734,2002272.7741324285]},{"name":"Sta Lucia Candon","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Sta Lucia Candon/staluciacandon_canal.shp","featureCount":15,"lengthM":43456.6,"bounds":[227241.66029729712,1891774.023090586,235399.80163977566,1901317.048223278]},{"name":"Sta. Maria Burgos","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Sta. Maria Burgos/stamariaburgos_canal.shp","featureCount":83,"lengthM":54890.0,"bounds":[229722.12338197776,1913909.7424842385,236456.85419769707,1922681.88165424]},{"name":"Sulvec","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Sulvec/sulvec_canal.shp","featureCount":31,"lengthM":35323.1,"bounds":[246872.3224698898,2029132.3923920628,250789.1698211268,2034277.7601243355]},{"name":"Suyo Tagudin","region":"Region I","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region I/Suyo Tagudin/suyotagudin_canal.shp","featureCount":9,"lengthM":22013.1,"bounds":[227657.74284862576,1873544.0565292395,232619.96072795865,1883921.9837145738]},{"name":"Addalam","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Addalam/addalam_canal.shp","featureCount":500,"lengthM":376068.0,"bounds":[345261.4931596363,1820779.1792464773,360092.51725564717,1842233.9759289464]},{"name":"Baggao","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Baggao/baggao_canal.shp","featureCount":123,"lengthM":111955.1,"bounds":[379424.60557321314,1971914.306504322,388315.73884589865,1989155.9751017021]},{"name":"Banurbur Creek","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Banurbur Creek/banurburcreek_canal.shp","featureCount":37,"lengthM":89579.4,"bounds":[368692.8221044168,2010998.45104786,380214.4732668405,2020451.7909678165]},{"name":"Baua","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Baua/baua_canal.shp","featureCount":330,"lengthM":222314.4,"bounds":[387210.8783624559,2013802.6983540107,407210.0243990946,2030912.1562691599]},{"name":"Chico River PIS","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Chico River PIS/chicoriverpis_canal.shp","featureCount":22,"lengthM":110394.7,"bounds":[331607.5246000001,1946293.0802999996,346383.0153999999,1961846.734099999]},{"name":"Colonol INIS","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Colonol INIS/colonol_canal.shp","featureCount":74,"lengthM":146506.2,"bounds":[301044.3071492565,1822344.7445971766,311375.16132819094,1840953.7437079716]},{"name":"Dabubu","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Dabubu/dabubu_canal.shp","featureCount":9,"lengthM":31524.9,"bounds":[367130.11969998525,1815261.4104999946,371566.23117456643,1823691.3796261807]},{"name":"Dibuluan","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Dibuluan/dibuluan_canal.shp","featureCount":16,"lengthM":52190.7,"bounds":[370936.5600620893,1817047.8407650406,378548.212388086,1828649.8177862123]},{"name":"Dummun","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Dummun/dummun_canal.shp","featureCount":76,"lengthM":95983.3,"bounds":[357546.73353670683,1991981.9475583185,376399.3920791487,1997328.6922848793]},{"name":"East Apayao Abulug","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/East Apayao Abulug/eastapayaoabulug_canal.shp","featureCount":50,"lengthM":244257.1,"bounds":[320078.45519999973,2010201.5329999998,352675.7455750014,2046615.5011]},{"name":"Lower Chico","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Lower Chico/lowerchico_canal.shp","featureCount":150,"lengthM":111109.1,"bounds":[333504.20315504353,1957682.4595199507,339385.5568576137,1966733.7770250589]},{"name":"Mallig","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Mallig/mallig_canal.shp","featureCount":331,"lengthM":203967.5,"bounds":[346491.47663439583,1899518.6619299261,355799.7407028825,1908228.9704414976]},{"name":"Nassiping","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Nassiping/nassiping_canal.shp","featureCount":15,"lengthM":35607.7,"bounds":[352568.54119999986,1986591.3404372674,357864.23539999966,1994746.7355000004]},{"name":"Nueva Vizcaya Bagabag","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Nueva Vizcaya Bagabag/nuevavizcayabagabag_canal.shp","featureCount":102,"lengthM":37153.3,"bounds":[309154.81559587107,1826486.0825887534,314881.8754626692,1840692.5736924647]},{"name":"Pasa SRIS","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Pasa SRIS/pasa_canal.shp","featureCount":115,"lengthM":70388.8,"bounds":[385672.8040597548,1894816.8157253107,390559.351959783,1901477.244041657]},{"name":"Pinacauan","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Pinacauan/pinacuan_canal.shp","featureCount":10,"lengthM":46347.1,"bounds":[367494.99684446893,1938404.9179827531,374754.33463380864,1957849.7846824438]},{"name":"Solona","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Solona/solona_canal.shp","featureCount":20,"lengthM":70812.9,"bounds":[356093.152462906,1946242.0318631462,363771.4566514534,1959806.3388633616]},{"name":"Visitacion","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Visitacion/visitacion_canal.shp","featureCount":161,"lengthM":119184.2,"bounds":[410140.2379507078,2034248.5908805802,415532.20265468396,2043129.5520628411]},{"name":"Zinundungan","region":"Region II","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region II/Zinundungan/zinundungan_canal.shp","featureCount":77,"lengthM":101654.7,"bounds":[340441.9522219328,1992320.2637627963,355218.1134187151,2001690.8195116092]},{"name":"AMRIS Pampanga","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/AMRIS Pampanga/amrispampanga_canal.shp","featureCount":807,"lengthM":532762.5,"bounds":[259364.5755583082,1651117.6924643784,276940.39849778573,1669229.329638572]},{"name":"AMRIS bulacan","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/AMRIS bulacan/amrisbulacan_canal.shp","featureCount":2230,"lengthM":824364.1,"bounds":[259458.75462107017,1632736.0448102232,281307.6199981194,1669920.0905907832]},{"name":"AMRO","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/AMRO/amro_canal.shp","featureCount":5,"lengthM":20360.8,"bounds":[403195.19052449474,1798514.8234224252,406951.52879538276,1806714.64027914]},{"name":"Bucao","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Bucao/bucao_canal.shp","featureCount":81,"lengthM":95331.6,"bounds":[177779.4659111537,1691140.7011174113,187355.07218150795,1695988.058718374]},{"name":"CAM RIS","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/CAM RIS/camris_canal.shp","featureCount":63,"lengthM":190388.4,"bounds":[214628.48347837967,1721076.7166133279,227649.93412523734,1740698.481384374]},{"name":"Colo","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Colo/colo_canal.shp","featureCount":114,"lengthM":76275.7,"bounds":[221329.67663974874,1642790.5008143354,228292.7383405259,1647624.7691934109]},{"name":"Disalit","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Disalit/disalit_canal.shp","featureCount":5,"lengthM":16259.9,"bounds":[340925.73416416056,1738420.0375168584,345420.63096052303,1743167.648430206]},{"name":"Gumain","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Gumain/gumain_canal.shp","featureCount":7,"lengthM":19831.3,"bounds":[230730.59925027704,1647639.4118847155,238061.46699361483,1654688.3966862138]},{"name":"Layak Balsik","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Layak Balsik/layakbalsik_canal.shp","featureCount":59,"lengthM":33094.6,"bounds":[228263.29102909163,1642343.0361544066,232683.60165538182,1645259.1860216644]},{"name":"NB RIS","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/NB RIS/nb_canal.shp","featureCount":89,"lengthM":114566.7,"bounds":[167307.05186881498,1739783.5308310855,177800.08104222734,1751353.2048459202]},{"name":"Pampanga Delta","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Pampanga Delta/pdris_canal.shp","featureCount":82,"lengthM":143541.2,"bounds":[254095.54313215875,1656441.147134456,265179.6939052527,1681746.7923631498]},{"name":"Tarlac Ground Water IS","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Tarlac Ground Water IS/tgwis_canal.shp","featureCount":524,"lengthM":226617.6,"bounds":[237987.59640541518,1697071.5056938145,288686.72529739735,1745428.200805424]},{"name":"Tasmo RIS","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/Tasmo RIS/tasmo_canal.shp","featureCount":53,"lengthM":240501.2,"bounds":[237641.80927290244,1696815.3117543515,257104.68518523712,1729701.016028334]},{"name":"porac","region":"Region III","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region III/porac/porac_canal.shp","featureCount":111,"lengthM":137848.1,"bounds":[231623.0585740693,1651382.9791055769,242834.47699543647,1660967.9829797782]},{"name":"Agos","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Agos/agos_canal.shp","featureCount":40,"lengthM":66129.9,"bounds":[350261.0154041322,1624984.6797839762,357774.9749600471,1632521.6180143123]},{"name":"Balanac","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Balanac/balanac_canal.shp","featureCount":90,"lengthM":34972.2,"bounds":[329709.41176580475,1570420.2369509088,333653.5086197675,1582141.7752737561]},{"name":"Balayungan div 1","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Balayungan div 1/balayungandiv1_canal.shp","featureCount":96,"lengthM":51129.0,"bounds":[256363.60629740675,1577796.8924629078,262567.9566844149,1584034.6443263749]},{"name":"Balayungan div 2","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Balayungan div 2/balayungandiv2_canal.shp","featureCount":232,"lengthM":142226.3,"bounds":[255266.780449729,1578772.874288682,261887.90387516376,1584432.016113937]},{"name":"Baluctot","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Baluctot/baluctot_canal.shp","featureCount":73,"lengthM":20067.6,"bounds":[278520.6431286903,1588157.5566436795,281460.4387706632,1593315.438211897]},{"name":"Butas","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Butas/butas_canal.shp","featureCount":20,"lengthM":12318.0,"bounds":[273517.02813430864,1583480.2957409369,276051.56101064547,1588241.8965920713]},{"name":"Butas Lawang bato","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Butas Lawang bato/butaslawangbato_canal.shp","featureCount":8,"lengthM":10599.7,"bounds":[271421.11171000276,1583483.3756936274,274764.14752839576,1590970.4344027494]},{"name":"Butas Marcelo","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Butas Marcelo/butasmarcelo_canal.shp","featureCount":76,"lengthM":36431.1,"bounds":[273599.46946833766,1584587.9569061322,276087.3656118929,1590535.2308690355]},{"name":"Butas Palanas","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Butas Palanas/butaspalanas_canal.shp","featureCount":10,"lengthM":9145.9,"bounds":[272253.92209977086,1589013.2029234755,274090.47984590067,1592965.5764712072]},{"name":"Cabuyao East","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Cabuyao East/cabuyaoeast_canal.shp","featureCount":9,"lengthM":17042.5,"bounds":[298073.27706178767,1572972.4514893594,301483.73176345316,1579033.0663949419]},{"name":"Culong Culong","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Culong Culong/culong_canal.shp","featureCount":20,"lengthM":42331.0,"bounds":[259687.1068114221,1575233.5462915709,267008.9742100305,1583750.1968436015]},{"name":"Dambo","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Dambo/dambo_canal.shp","featureCount":11,"lengthM":26422.4,"bounds":[327502.52543000923,1591247.5407382739,330576.1797895448,1600255.5727104633]},{"name":"Diezmo","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Diezmo/diezmo_canal.shp","featureCount":14,"lengthM":29942.0,"bounds":[292577.307565794,1573751.4185183854,297601.2305682264,1580636.1840505686]},{"name":"Dumacaa","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Dumacaa/dumacaa_canal.shp","featureCount":55,"lengthM":84715.4,"bounds":[349923.11502568814,1539027.974303908,359560.99356217013,1550907.2336260069]},{"name":"Embarcadero","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Embarcadero/embarcadero_canal.shp","featureCount":8,"lengthM":6876.6,"bounds":[282218.39850597654,1578747.9714308816,283171.41748252226,1581130.5584573979]},{"name":"Hanagdong","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Hanagdong/hanagdong_canal.shp","featureCount":34,"lengthM":23650.8,"bounds":[335250.28291978734,1531974.3302388291,338832.6643661892,1535159.65037643]},{"name":"Kay akle","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Kay akle/kayakle_canal.shp","featureCount":58,"lengthM":30867.3,"bounds":[254558.33920008477,1572850.8324110166,260937.04458777717,1581911.5604647764]},{"name":"Lagnas","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Lagnas/lagnas_canal.shp","featureCount":8,"lengthM":22749.4,"bounds":[319642.01019688265,1537511.812118243,323920.50483986567,1545859.8987465664]},{"name":"Lumban","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Lumban/lumban_canal.shp","featureCount":4,"lengthM":5828.2,"bounds":[332768.7171907552,1580730.4653769461,334702.71441807074,1583962.32408072]},{"name":"Mabacan","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Mabacan/mabacan_canal.shp","featureCount":6,"lengthM":15467.0,"bounds":[312118.1662858743,1563233.2152747412,316186.29068422737,1568105.8733303705]},{"name":"Mabacao","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Mabacao/mabacao_canal.shp","featureCount":7,"lengthM":2134.9,"bounds":[259669.0548292285,1578017.8351401296,260754.1454161571,1578635.3236498726]},{"name":"Macabling","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Macabling/macabling_canal.shp","featureCount":9,"lengthM":20166.7,"bounds":[294122.23564483225,1581308.318954446,297438.63007768645,1585643.2744601252]},{"name":"Makuling","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Makuling/makuling_canal.shp","featureCount":25,"lengthM":14958.1,"bounds":[277636.6321011319,1585717.429806378,278861.1677639085,1594081.5928289958]},{"name":"Malaunod","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Malaunod/malaunod_canal.shp","featureCount":8,"lengthM":15780.4,"bounds":[317394.31142342184,1546014.7427999298,318776.2359546219,1550666.8494929122]},{"name":"Matanda div 5","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Matanda div 5/matanda5_canal.shp","featureCount":78,"lengthM":86674.2,"bounds":[264837.8949868819,1584489.2185812127,271152.488751404,1591941.9996989965]},{"name":"Matanda div 6","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Matanda div 6/matanda6_canal.shp","featureCount":78,"lengthM":86674.2,"bounds":[264837.8949868819,1584489.2185812127,271152.488751404,1591941.9996989965]},{"name":"Mayor","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Mayor/mayor_canal.shp","featureCount":16,"lengthM":26398.2,"bounds":[329884.7138158784,1592705.2961400012,334250.27947281045,1599442.7232607964]},{"name":"Molino","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Molino/molino_canal.shp","featureCount":34,"lengthM":11746.3,"bounds":[280192.39292191656,1592718.8184828488,282151.66342092014,1596893.7034900591]},{"name":"Palico","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Palico/palico_canal.shp","featureCount":21,"lengthM":37405.0,"bounds":[244220.78962477823,1551950.6142833263,248885.2616282853,1560043.2353723368]},{"name":"Pasong Kastila","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Pasong Kastila/pasongkastila_canal.shp","featureCount":39,"lengthM":21827.0,"bounds":[273970.92076811084,1588865.0801191563,275791.9149013034,1594888.557363511]},{"name":"Plucena Bayan","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Plucena Bayan/plucenabayan_canal.shp","featureCount":15,"lengthM":12263.2,"bounds":[269729.29663879634,1588620.7055622032,271660.0041307373,1593611.1038936337]},{"name":"Sahing","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Sahing/sahing_canal.shp","featureCount":29,"lengthM":12435.8,"bounds":[259931.64937873004,1582323.6845617585,263277.99600276933,1586628.4532453632]},{"name":"San Agustine","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/San Agustine/sanagustine_canal.shp","featureCount":11,"lengthM":22681.5,"bounds":[275371.09034330613,1579935.4089922644,277290.3088352103,1594427.3541632735]},{"name":"San Cristobal","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/San Cristobal/sancristobal_canal.shp","featureCount":14,"lengthM":27158.9,"bounds":[295625.13218048017,1572804.7007853363,303163.9138183637,1574905.6148616287]},{"name":"San Juan","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/San Juan/sanjuan_canal.shp","featureCount":9,"lengthM":22619.2,"bounds":[299158.6014247964,1570143.5385213816,303631.46230429935,1572997.2882656308]},{"name":"Sta Cruz","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Sta Cruz/stacruz_canal.shp","featureCount":31,"lengthM":94972.2,"bounds":[317853.96451716335,1567399.7921481985,329186.5525626812,1578947.6748188108]},{"name":"Sta Maria","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Sta Maria/stamaria_canal.shp","featureCount":21,"lengthM":42450.0,"bounds":[328136.0803962053,1596800.4188263265,332005.6327167833,1604659.943261856]},{"name":"Tres Cruzes","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Tres Cruzes/trescruzes_canal.shp","featureCount":80,"lengthM":20004.9,"bounds":[261315.39245877866,1585361.2029858944,266261.913886444,1589722.8003352566]},{"name":"Vargas","region":"Region IV-A","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-A/Vargas/vargas_canal.shp","featureCount":52,"lengthM":32595.8,"bounds":[270448.0033772161,1581362.7609775693,274720.5352932437,1587759.7404830484]},{"name":"Amnay","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Amnay/amnay_canal.shp","featureCount":14,"lengthM":39222.5,"bounds":[261337.95556989682,1424144.96728635,273968.80920648284,1428239.940576571]},{"name":"Baco Bacayao","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Baco Bacayao/bacobocayao_canal.shp","featureCount":36,"lengthM":129489.1,"bounds":[294648.0457703853,1463726.1517743529,308812.4550050807,1483277.1930465808]},{"name":"Bansud","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Bansud/bansud_canal.shp","featureCount":18,"lengthM":30538.2,"bounds":[328906.4622744944,1419397.1746903367,334995.4525262822,1423975.5020721387]},{"name":"Batangbatang","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Batangbatang/batangbatang_canal.shp","featureCount":466,"lengthM":76117.0,"bounds":[-15971.001416794954,1020288.6409364418,-3747.8480947281787,1033250.394577301]},{"name":"Caguray","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Caguray/caguray_canal.shp","featureCount":10,"lengthM":47627.4,"bounds":[297592.62837348436,1356161.1554218333,303994.7621598115,1369407.0588882256]},{"name":"Cantingas","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Cantingas/cantingas_canal.shp","featureCount":4,"lengthM":11645.7,"bounds":[451653.2027542065,1360686.819209578,456401.0590360485,1364610.4154530205]},{"name":"Lumintao","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Lumintao/lumintao_canal.shp","featureCount":15,"lengthM":26262.7,"bounds":[275580.0963412668,1381218.6306037735,281545.06292608165,1385443.829403585]},{"name":"Magasawang Tubig","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Magasawang Tubig/magasawangtubig_canal.shp","featureCount":27,"lengthM":67569.1,"bounds":[305004.54061556014,1457839.1635719426,317811.82811521715,1472007.9168076064]},{"name":"Malatgao","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Malatgao/malatgao_canal.shp","featureCount":26,"lengthM":81796.1,"bounds":[-5091.718285206007,1032087.002094225,7719.954022568476,1043067.561324554]},{"name":"Mongpong","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Mongpong/mongpong_canal.shp","featureCount":98,"lengthM":47143.4,"bounds":[262986.52232972847,1414640.3498388703,268892.08197839087,1418539.0541861115]},{"name":"Pagbahan","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Pagbahan/pagbahan_canal.shp","featureCount":152,"lengthM":112079.8,"bounds":[250691.8354334289,1447546.2677474457,256853.12540318022,1458811.1181622234]},{"name":"Pula","region":"Region IV-B","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IV-B/Pula/pula_canal.shp","featureCount":54,"lengthM":74395.2,"bounds":[324593.3249737248,1437816.3887775822,336721.5499702742,1449178.2211022621]},{"name":"Dipolo","region":"Region IX","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Dipolo/dipolo_canal.shp","featureCount":59,"lengthM":42319.3,"bounds":[534755.2412893459,896753.0978896696,540924.2996153163,903498.4839361866]},{"name":"Dipolog","region":"Region IX","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Dipolog/dipolog_canal.shp","featureCount":48,"lengthM":65505.1,"bounds":[534111.7801651952,940497.2264364123,539595.1679877572,947974.9640949148]},{"name":"Ditay","region":"Region IX","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Ditay/ditay_canal.shp","featureCount":2,"lengthM":3847.6,"bounds":[495476.171498797,861956.6800313882,497223.9407610456,863809.6980425101]},{"name":"Labangan","region":"Region IX","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Labangan/libangan_canal.shp","featureCount":340,"lengthM":67724.5,"bounds":[548202.8169949292,865128.0478244687,559761.9523061726,874814.1020527965]},{"name":"Salug","region":"Region IX","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Salug/salug_canal.shp","featureCount":188,"lengthM":174681.7,"bounds":[544127.7039416545,886043.8193386833,564349.0871501139,900726.7158569134]},{"name":"Sibuguey Valley","region":"Region IX","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region IX/Sibuguey Valley/sibuguey_canal.shp","featureCount":34,"lengthM":52607.5,"bounds":[492170.1744979585,854829.1967249112,505883.4599065987,868837.191816993]},{"name":"Barit","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Barit/barit_canal.shp","featureCount":288,"lengthM":232108.0,"bounds":[533015.7745264756,1477787.3891653602,546285.9575772124,1487992.1504901787]},{"name":"Cabilogan San Juan","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Cabilogan San Juan/cabilogansanjuan_canal.shp","featureCount":34,"lengthM":48026.6,"bounds":[551681.1021188179,1461582.068398501,557700.0390086859,1465766.9692069432]},{"name":"Daet Talisay","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Daet Talisay/daettalisay_canal.shp","featureCount":30,"lengthM":82691.4,"bounds":[485888.17389402137,1555400.2244995723,498172.88049329084,1567934.3476212115]},{"name":"Hibiga","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Hibiga/hibiga_canal.shp","featureCount":75,"lengthM":34951.7,"bounds":[554200.779674225,1467715.0866459105,558877.3141815163,1469590.4085199002]},{"name":"Libmaan Cabusao","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Libmaan Cabusao/libmaancabusao_canal.shp","featureCount":564,"lengthM":238102.8,"bounds":[500456.7296454101,1511226.5510491154,512391.03972940065,1522124.7601578638]},{"name":"Lower lalo","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Lower lalo/lowerlalo_canal.shp","featureCount":168,"lengthM":120668.9,"bounds":[537966.6434478918,1475443.3069993812,552586.6194927563,1481923.6202187915]},{"name":"Mahaba","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Mahaba/mahaba_canal.shp","featureCount":173,"lengthM":96728.3,"bounds":[553385.2889491423,1465564.9089023701,561044.033747328,1469104.845587963]},{"name":"Matogdon","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Matogdon/matogdon_canal.shp","featureCount":46,"lengthM":40963.3,"bounds":[482233.3421657948,1561894.079416987,486629.5306301755,1566324.3835912503]},{"name":"Nasisi","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Nasisi/nasisi_canal.shp","featureCount":40,"lengthM":41828.7,"bounds":[555714.1242279657,1464861.8703305265,563619.9017836859,1467587.7591577782]},{"name":"Ogsong","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Ogsong/ogsong_canal.shp","featureCount":100,"lengthM":32816.3,"bounds":[559243.8057496944,1463910.1839582562,562845.0268368432,1465992.9319014498]},{"name":"Rida","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Rida/rida_canal.shp","featureCount":196,"lengthM":140849.6,"bounds":[526545.8771350514,1487359.9357235674,541297.1401389838,1496912.8276341371]},{"name":"San Francisco","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/San Francisco/sanfrancisco_canal.shp","featureCount":37,"lengthM":37712.9,"bounds":[593726.0796130389,1400679.6338561121,599886.6275867333,1407783.040909333]},{"name":"San Ramon","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/San Ramon/sanramon_canal.shp","featureCount":21,"lengthM":25182.0,"bounds":[597772.6912488716,1397983.2242027046,602723.1065981409,1402106.6259141322]},{"name":"South Quinale","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/South Quinale/southquinale_canal.shp","featureCount":68,"lengthM":52369.3,"bounds":[545024.2599742142,1464460.6069098292,552625.9233914969,1469214.2839509337]},{"name":"Tigman Hinayan Inarihan","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Tigman Hinayan Inarihan/tigman_canal.shp","featureCount":1228,"lengthM":353954.2,"bounds":[515483.7767372982,1508127.0286789143,529612.838509429,1518926.0974174412]},{"name":"Upper lalo","region":"Region V","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region V/Upper lalo/upperlalo_canal.shp","featureCount":85,"lengthM":68151.8,"bounds":[549999.4072689328,1477433.192729638,557463.88535988,1481255.4154047112]},{"name":"Aganan","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Aganan/aganan_canal.shp","featureCount":18,"lengthM":52558.6,"bounds":[440008.64275938587,1183354.5518687607,448878.666611582,1191676.6108521456]},{"name":"Aklan East","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Aklan East/east_canal.shp","featureCount":24,"lengthM":53607.0,"bounds":[425119.6852895569,1283766.5681094553,434785.81580370927,1293211.1190118263]},{"name":"Aklan West","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Aklan West/west_canal.shp","featureCount":17,"lengthM":60291.3,"bounds":[421143.38489571057,1283433.245960399,428816.5290937227,1296397.9528523076]},{"name":"Bago","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Bago/bago_canal.shp","featureCount":44,"lengthM":176955.4,"bounds":[479931.16134505795,1151807.9995620716,503838.8414651238,1171351.5564564336]},{"name":"Barotac Viejo","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Barotac Viejo/barotac_canal.shp","featureCount":8,"lengthM":52326.9,"bounds":[477145.76506881166,1216514.1455218769,485251.57760131004,1226584.7994283794]},{"name":"Jalaur Extension","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Jalaur Extension/jalaurextension_canal.shp","featureCount":42,"lengthM":78888.4,"bounds":[464152.2041786224,1195928.7555739253,471801.7322931586,1214673.0657091523]},{"name":"Jalaur Proper","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Jalaur Proper/jalaurproper_canal.shp","featureCount":39,"lengthM":139643.1,"bounds":[456826.04337179626,1193738.1250650596,468517.01335412543,1217519.801691619]},{"name":"Mambusao","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Mambusao/mambusao_canal.shp","featureCount":19,"lengthM":44521.3,"bounds":[452860.16207906284,1260090.0303604957,464106.239154758,1265359.6540721012]},{"name":"Panakuyan","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Panakuyan/panakuyan_canal.shp","featureCount":9,"lengthM":27666.6,"bounds":[401303.80663350807,1299895.7117643221,409086.85519344173,1306793.0247050086]},{"name":"Pangiplan","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Pangiplan/pangiplan_canal.shp","featureCount":20,"lengthM":27690.7,"bounds":[491172.3997238195,1120363.1951308083,495917.1687202089,1127678.517059447]},{"name":"Sibalom","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Sibalom/sibalom_canal.shp","featureCount":30,"lengthM":45884.1,"bounds":[432304.01793304336,1180243.4427211317,441565.21449814824,1190630.2229308733]},{"name":"Sibalom San Jose","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Sibalom San Jose/sibalomsanjose_canal.shp","featureCount":34,"lengthM":107107.7,"bounds":[384741.0684814453,1183125.412015415,397617.7499945883,1202855.5135570792]},{"name":"Sta Barbara","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Sta Barbara/stabarbara_canal.shp","featureCount":18,"lengthM":46706.6,"bounds":[448663.37507180683,1188082.6850277297,458262.3366885863,1197997.1457140206]},{"name":"Suage","region":"Region VI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VI/Suage/suague_canal.shp","featureCount":10,"lengthM":45697.2,"bounds":[451348.013082619,1202342.001512429,460898.92397240544,1210186.4392131933]},{"name":"Bayongan","region":"Region VII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VII/Bayongan/bayongan_canal.shp","featureCount":441,"lengthM":257288.0,"bounds":[648110.6445737268,1100772.5491279457,658788.9551601661,1111707.8156390302]},{"name":"Capayas","region":"Region VII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VII/Capayas/capayas_canal.shp","featureCount":295,"lengthM":93878.6,"bounds":[654447.4781215513,1103476.2898801009,661621.7792006381,1112098.669136354]},{"name":"Malinao","region":"Region VII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VII/Malinao/malinao_canal.shp","featureCount":675,"lengthM":309654.7,"bounds":[639874.8831024512,1087073.388689381,651962.6640648989,1099327.1870748769]},{"name":"Talibon","region":"Region VII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VII/Talibon/talibon_canal.shp","featureCount":67,"lengthM":57746.9,"bounds":[641406.32799605,1116120.7288521286,645804.5595119214,1123921.747868497]},{"name":"Balire North","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Balire North/balirenorth_canal.shp","featureCount":4,"lengthM":11690.0,"bounds":[712645.2135529291,1195971.400896661,717622.4405627266,1199016.7198349065]},{"name":"Balire South","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Balire South/baliresouth_canal.shp","featureCount":4,"lengthM":9023.1,"bounds":[714532.4374658191,1193981.4712843825,717828.2938747432,1195758.9346050145]},{"name":"Bao","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Bao/bao_canal.shp","featureCount":21,"lengthM":57998.0,"bounds":[666011.1126407884,1218998.446589702,673274.7669756403,1231235.420997271]},{"name":"Basey","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Basey/basey_canal.shp","featureCount":23,"lengthM":62310.9,"bounds":[721001.9155370711,1250360.13680316,736057.935904711,1259138.8352240752]},{"name":"Binahaan north","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Binahaan north/binahaannorth_canal.shp","featureCount":17,"lengthM":50643.4,"bounds":[703973.5518092798,1230604.6275197219,709487.0227284303,1240049.3348317116]},{"name":"Binahaan south","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Binahaan south/binahaansouth_canal.shp","featureCount":7,"lengthM":28407.2,"bounds":[704018.422603946,1227086.1445311466,712755.7696502554,1232236.998531675]},{"name":"Bito","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Bito/bito_canal.shp","featureCount":17,"lengthM":47862.4,"bounds":[710511.2584670791,1184920.8365317683,718677.7013639438,1190473.113262791]},{"name":"Calbiga","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Calbiga/calbiga_canal.shp","featureCount":55,"lengthM":69396.1,"bounds":[715897.3731963938,1282414.674426834,723605.0575273663,1293842.9427244726]},{"name":"Catarman Bobon","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Catarman Bobon/catarmanbobon_canal.shp","featureCount":30,"lengthM":44609.5,"bounds":[664467.0171834888,1373071.7133825824,674974.4749171833,1384416.4231822637]},{"name":"Catubig","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Catubig/catubig_canal.shp","featureCount":101,"lengthM":114025.9,"bounds":[715929.7749824142,1356486.5100090576,724988.4185661292,1369283.706711186]},{"name":"Daguitan","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Daguitan/daguintan_canal.shp","featureCount":141,"lengthM":103926.5,"bounds":[708182.1657804229,1213033.070603898,722336.0906884739,1217371.0273668205]},{"name":"Das ay","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Das ay/dasay_canal.shp","featureCount":276,"lengthM":64184.8,"bounds":[737245.59469281,1146581.0583427148,740424.7718544869,1151988.2129359173]},{"name":"Gibuga","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Gibuga/gibuga_canal.shp","featureCount":7,"lengthM":22207.8,"bounds":[714528.1430000011,1203216.323901632,719528.6538154976,1209180.0315804463]},{"name":"Guinarona","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Guinarona/guinarona_canal.shp","featureCount":12,"lengthM":28179.7,"bounds":[706999.2200574608,1218237.473501579,713453.5900374937,1223216.2016265616]},{"name":"Hindang Hilongos","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Hindang Hilongos/hindanghilongos_canal.shp","featureCount":13,"lengthM":20482.8,"bounds":[689277.9612947153,1150583.346974564,693599.2334734815,1154447.1957707163]},{"name":"Ibawon","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Ibawon/ibawon_canal.shp","featureCount":4,"lengthM":11741.1,"bounds":[713911.8328850452,1198232.261969123,717883.0262938796,1201064.3051169047]},{"name":"Lower Binahaan","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Lower Binahaan/lowerbinahaan_canal.shp","featureCount":12,"lengthM":49012.0,"bounds":[706496.2755008198,1221073.3642819214,719901.891244637,1228369.3057640647]},{"name":"Mainit","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Mainit/mainit_canal.shp","featureCount":95,"lengthM":83670.9,"bounds":[698462.0329990677,1238980.2325062323,706947.4906259563,1249619.9975269486]},{"name":"Marabong","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Marabong/marabong_canal.shp","featureCount":4,"lengthM":23388.5,"bounds":[706050.2421616202,1210399.5690064915,715966.6123470617,1219386.4060596412]},{"name":"Pongso","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Pongso/pongso_canal.shp","featureCount":11,"lengthM":28754.6,"bounds":[687656.8581603268,1248396.732628833,693130.8163701592,1253715.475990886]},{"name":"Tibak","region":"Region VIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region VIII/Tibak/tibak_canal.shp","featureCount":21,"lengthM":48380.7,"bounds":[710369.129644112,1230681.0147542532,717061.3984937035,1238177.9494091389]},{"name":"Balingasag","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Balingasag/balingasag_canal.shp","featureCount":134,"lengthM":112725.0,"bounds":[694105.7382766623,963708.1773259379,702661.5454594744,973742.2697375398]},{"name":"Bubunawan","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Bubunawan/bubunawan_canal.shp","featureCount":12,"lengthM":63908.2,"bounds":[679896.4562496853,912411.3414865859,690897.886581339,925868.4451235908]},{"name":"Malaig","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Malaig/malaig_canal.shp","featureCount":108,"lengthM":67395.3,"bounds":[636789.7928800466,851416.2424602594,646983.1035272487,859126.2198175816]},{"name":"Manupali","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Manupali/manupali_canal.shp","featureCount":533,"lengthM":263578.5,"bounds":[723353.6197625154,874796.2320812659,737009.7076783676,891266.048204741]},{"name":"Maranding","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Maranding/maranding_canal.shp","featureCount":1434,"lengthM":545101.1,"bounds":[576709.7335962349,867960.2462670127,592524.7797267264,886187.1882918241]},{"name":"Masiu","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Masiu/masiu_canal.shp","featureCount":24,"lengthM":37790.6,"bounds":[644668.1521257745,861873.269639073,649348.0387989138,867666.4089481012]},{"name":"Muleta","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Muleta/muleta_canal.shp","featureCount":467,"lengthM":408106.2,"bounds":[705255.9603037327,849218.5022321991,730026.7090276794,871365.1694665403]},{"name":"Pulangui","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Pulangui/pulangui_canal.shp","featureCount":2079,"lengthM":1009097.6,"bounds":[729396.3810032646,862199.7098516141,747460.0015283241,886208.8401470858]},{"name":"Roxas Kuya","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Roxas Kuya/roxaskuya_canal.shp","featureCount":6,"lengthM":17640.4,"bounds":[715470.2749721033,856018.731828383,721974.043714286,859325.5971728443]},{"name":"Rugnan","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Rugnan/rugnan_canal.shp","featureCount":178,"lengthM":124844.9,"bounds":[645762.3757040988,867059.8595401789,655152.2294877763,875483.5384876229]},{"name":"Talakag","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Talakag/talakag_canal.shp","featureCount":8,"lengthM":37303.4,"bounds":[673474.7243699022,896073.8385255734,678444.0677236179,912886.5415056082]},{"name":"Tangub","region":"Region X","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region X/Tangub/tangub_canal.shp","featureCount":13,"lengthM":17940.9,"bounds":[579214.4934594887,889637.5620232701,581456.7379697136,894671.642943321]},{"name":"Batutu","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Batutu/batutu_canal.shp","featureCount":80,"lengthM":121754.1,"bounds":[832187.3411745449,838096.2833313119,843307.8404140748,852559.5552735148]},{"name":"Kipaliku","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Kipaliku/kipaliku_canal.shp","featureCount":29,"lengthM":52467.5,"bounds":[787287.7160822334,827590.034830408,796711.3908465831,841774.9776376653]},{"name":"Lasang","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Lasang/lasang_canal.shp","featureCount":29,"lengthM":69781.5,"bounds":[785215.8572477048,809793.4275683034,799516.0216593661,819697.1709641875]},{"name":"Libuganon","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Libuganon/libuganon_canal.shp","featureCount":47,"lengthM":117315.8,"bounds":[793957.2068741666,815663.7079657182,803784.6131917816,845410.6734118903]},{"name":"Libuganon Left","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Libuganon Left/libuganonleft_canal.shp","featureCount":20,"lengthM":23102.0,"bounds":[794832.2510638731,839170.9378084108,802395.566462859,846142.2124625742]},{"name":"Lupon","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Lupon/lupon_canal.shp","featureCount":18,"lengthM":59508.0,"bounds":[829562.008965224,764633.3086335814,838904.7541916226,773447.0415079287]},{"name":"Mal","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Mal/mal_canal.shp","featureCount":54,"lengthM":82001.2,"bounds":[736931.60992777,732037.7163967731,749251.0712575064,740491.3284032596]},{"name":"Padada","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Padada/padada_canal.shp","featureCount":87,"lengthM":119890.7,"bounds":[750274.0927710225,737555.6878170711,762543.8763944964,745592.5066755536]},{"name":"Saug","region":"Region XI","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XI/Saug/saug_canal.shp","featureCount":44,"lengthM":94022.0,"bounds":[798621.150893413,828200.3245736465,812283.0714274052,846492.8231473636]},{"name":"Ala","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Ala/ala_canal.shp","featureCount":26,"lengthM":126073.7,"bounds":[673621.4096899413,712162.063306675,687274.970216534,738136.2468156096]},{"name":"Alip","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Alip/alip_canal.shp","featureCount":22,"lengthM":62911.4,"bounds":[700539.2316561646,741693.474314697,713694.0590698234,751278.1722877178]},{"name":"Antong","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Antong/antong_canal.shp","featureCount":56,"lengthM":17042.9,"bounds":[698598.2056344232,723951.2223787268,703961.9023423679,728510.8047584277]},{"name":"Banga","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Banga/banga_canal.shp","featureCount":21,"lengthM":72053.7,"bounds":[683781.6578885628,711710.3749493812,696263.0927688879,721138.6727182249]},{"name":"Buayan","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Buayan/buayan_canal.shp","featureCount":40,"lengthM":135284.4,"bounds":[743145.0582058877,675747.2219389472,751974.3586048833,695842.8738548652]},{"name":"Kabacan","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Kabacan/kabacan_canal.shp","featureCount":46,"lengthM":175773.6,"bounds":[697227.0727679135,776742.9557466727,708428.218417957,790458.362305501]},{"name":"Kabulnan","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Kabulnan/kabulnan_canal.shp","featureCount":2,"lengthM":31894.0,"bounds":[658540.8148808026,750219.6889656415,669510.2924168961,767456.5452688837]},{"name":"Lambayong","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Lambayong/lambayong_canal.shp","featureCount":196,"lengthM":222512.0,"bounds":[675650.3197914889,737771.2162244921,688032.0579373348,756094.5174272927]},{"name":"Libungan","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Libungan/libungan_canal.shp","featureCount":450,"lengthM":508558.0,"bounds":[655650.0443784063,785278.9405395153,673316.9525852422,804599.30805288]},{"name":"Malasila","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Malasila/malasila_canal.shp","featureCount":32,"lengthM":109568.9,"bounds":[702394.5241958584,754120.0465658618,713465.0549178212,768244.4958572951]},{"name":"Marbel 1","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Marbel 1/marbel1_canal.shp","featureCount":31,"lengthM":63516.3,"bounds":[696701.7745892309,708716.0386717445,710804.9758750148,727670.5405771253]},{"name":"Marbel 2","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Marbel 2/marbel2_canal.shp","featureCount":252,"lengthM":121855.7,"bounds":[702326.0877817484,720462.132028629,709152.3172261479,728180.6713721154]},{"name":"Maridagao","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Maridagao/maridagao_canal.shp","featureCount":99,"lengthM":219667.3,"bounds":[672193.7646638375,773885.774528161,700560.372087459,795860.7636517007]},{"name":"Mlang","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Mlang/mlang_canal.shp","featureCount":27,"lengthM":78401.0,"bounds":[703114.6641502366,767477.6704281422,715267.5565238274,775752.5776977993]},{"name":"Siluay","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Siluay/siluay_canal.shp","featureCount":14,"lengthM":45104.5,"bounds":[736877.8369358822,677403.1031644759,745698.5430824517,684239.9839844357]},{"name":"Sinawal","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Sinawal/sinawal_canal.shp","featureCount":15,"lengthM":31416.2,"bounds":[724717.8669291794,675342.9687927858,733569.5989055727,679953.7348094692]},{"name":"Tacurong","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Tacurong/tacurong_canal.shp","featureCount":11,"lengthM":32842.3,"bounds":[681633.6250168348,724483.904365061,686002.0612967412,734540.8744267545]},{"name":"Talayan","region":"Region XII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XII/Talayan/talayan_canal.shp","featureCount":5,"lengthM":12451.9,"bounds":[653958.7587405462,770791.9501157722,657632.8480268681,775871.6394575421]},{"name":"Andanan Wawa","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Andanan Wawa/andananwawa_canal.shp","featureCount":84,"lengthM":80512.2,"bounds":[791417.161472072,954769.1370661961,804476.7017609812,974177.8317704456]},{"name":"Baobo","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Baobo/baobo_canal.shp","featureCount":9,"lengthM":33762.1,"bounds":[821378.4289658352,882757.7431715666,825424.7895910622,894649.7744889277]},{"name":"Baoy","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Baoy/baoy_canal.shp","featureCount":13,"lengthM":31343.9,"bounds":[790600.2861663043,1056536.0549886255,800323.6752148113,1061796.1091727994]},{"name":"Cabadbaran Taguibo","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Cabadbaran Taguibo/cabadcaran_canal.shp","featureCount":101,"lengthM":115198.8,"bounds":[781498.2850061837,994676.770018866,790005.2454546253,1009082.249400024]},{"name":"Cantilan","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Cantilan/cantilan_canal.shp","featureCount":21,"lengthM":64789.2,"bounds":[822088.105863539,1023567.2988059653,829882.5055106975,1031695.8542335703]},{"name":"Gibong","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Gibong/gibong_canal.shp","featureCount":14,"lengthM":55634.4,"bounds":[814850.6748319967,941716.3681597763,822264.3763961655,953093.9354959277]},{"name":"Lower Agusan River","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Lower Agusan River/larpis_canal.shp","featureCount":143,"lengthM":153549.0,"bounds":[767667.5737488848,981631.225925308,787037.9512241202,995118.8216645907]},{"name":"MAP IS","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/MAP IS/map_canal.shp","featureCount":99,"lengthM":80791.4,"bounds":[784769.391996543,958508.4544879767,790802.7458404226,966086.6664072234]},{"name":"Simulao","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Simulao/simulao_canal.shp","featureCount":15,"lengthM":59904.6,"bounds":[829438.122376278,891386.5475937603,843292.4012596424,902601.157694062]},{"name":"Sta Josefa","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Sta Josefa/stajosefa_canal.shp","featureCount":7,"lengthM":36210.3,"bounds":[827323.3529931204,880734.4880271251,835902.4992830245,887461.8909562802]},{"name":"Tago","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Tago/tago_canal.shp","featureCount":27,"lengthM":113988.5,"bounds":[827102.8712405325,986086.73320036,855714.4921460645,999594.8998990357]},{"name":"Umayam","region":"Region XIII","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/Region XIII/Umayam/umayam_canal.shp","featureCount":13,"lengthM":51502.4,"bounds":[804035.1162405774,906062.322045617,815081.5408427712,920609.6368013787]},{"name":"Aliaga","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Aliaga/aliaga_canal.shp","featureCount":40,"lengthM":63458.6,"bounds":[264579.69070537726,1710323.7865711134,280777.8199592057,1719202.8176612228]},{"name":"Along-along","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Along-along/alongalong_canal.shp","featureCount":45,"lengthM":50785.5,"bounds":[258030.8570592942,1693736.7408542838,267546.94677251484,1703302.1052497295]},{"name":"Aulo","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Aulo/aulo_canal.shp","featureCount":92,"lengthM":16166.7,"bounds":[293742.9742546468,1714128.2721555743,297813.5247132251,1718991.4049008968]},{"name":"Balbalugao","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Balbalugao/balbalugao_canal.shp","featureCount":8,"lengthM":19752.1,"bounds":[276137.1979264945,1749035.4319724895,280399.3924131843,1753436.757248502]},{"name":"Lower Talavera","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Lower Talavera/lowertalavera_canal.shp","featureCount":18,"lengthM":42049.8,"bounds":[278499.4182031859,1727346.2609315973,287039.8805870166,1736684.8081196942]},{"name":"Macanae","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Macanae/macanae_canal.shp","featureCount":5,"lengthM":12702.8,"bounds":[273055.8317098904,1756805.5086226987,276545.43480950675,1759844.9556569292]},{"name":"Marikit","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Marikit/marikit_canal.shp","featureCount":6,"lengthM":6696.1,"bounds":[312214.034843621,1747409.31715787,314877.769303154,1748320.39383926]},{"name":"Murcon Creek","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Murcon Creek/murconcreek_canal.shp","featureCount":38,"lengthM":75206.7,"bounds":[269306.85913973814,1715584.029654139,284581.3485758989,1723723.5484401206]},{"name":"PRIS SDC","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/PRIS SDC/prissdc_canal.shp","featureCount":269,"lengthM":305409.0,"bounds":[252938.3938639893,1720282.83415765,295044.50380985247,1745828.2710297531]},{"name":"PRIS SDC Phase 2","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/PRIS SDC Phase 2/prissdcp2_canal.shp","featureCount":193,"lengthM":312607.9,"bounds":[245585.48069214652,1729109.3946494088,269779.1818970881,1747887.2951595285]},{"name":"Pamaldan Cinco Cinco","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pamaldan Cinco Cinco/pamaldancinco_canal.shp","featureCount":89,"lengthM":23510.7,"bounds":[273734.6847694781,1710066.6443315144,280568.50976669573,1716709.798035597]},{"name":"Pampanga Bongabon","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pampanga Bongabon/pambongabon_canal.shp","featureCount":3975,"lengthM":192758.2,"bounds":[277406.7579767818,1694755.4300062554,292862.658265802,1720704.5111045013]},{"name":"Pampanga Bungabon Extension","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pampanga Bungabon Extension/pambongabonextension_canal.shp","featureCount":88,"lengthM":263857.2,"bounds":[260079.79133091372,1689165.045584539,276934.13333858596,1711565.9239169701]},{"name":"Pampanga River","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pampanga River/pamriver_canal.shp","featureCount":1684,"lengthM":828895.4,"bounds":[282781.87367496756,1719598.7298480168,298152.1749900231,1739726.1220010384]},{"name":"Penablanca RIS","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Penablanca RIS/penris_canal.shp","featureCount":208,"lengthM":413170.2,"bounds":[262859.8442111355,1665598.0619754242,286347.5766013543,1698860.8891564647]},{"name":"Pinagquartelan","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Pinagquartelan/pinagquartelan_canal.shp","featureCount":3,"lengthM":3786.6,"bounds":[283672.4232095274,1748310.8874529097,284661.4092603988,1749681.3016743017]},{"name":"Platero","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Platero/platero_canal.shp","featureCount":57,"lengthM":25542.5,"bounds":[280480.3486947534,1716755.9431810114,294793.81465084734,1721930.3400612236]},{"name":"Rizal Munic","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Rizal Munic/rizalmunic_canal.shp","featureCount":403,"lengthM":234877.6,"bounds":[284960.1057515573,1731792.7342800687,296659.1195040813,1739501.0709879992]},{"name":"Talavera Upper","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Talavera Upper/talaveraupper_canal.shp","featureCount":20,"lengthM":65169.8,"bounds":[280026.534029682,1738793.0880339858,290009.64199801366,1751527.1002015925]},{"name":"Talavera lower","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Talavera lower/talaveralower_canal.shp","featureCount":144,"lengthM":266225.8,"bounds":[259324.45657035778,1717574.9716128255,286728.2274490965,1741721.3240677181]},{"name":"Upper Tabuating","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Upper Tabuating/uppertabuating_canal.shp","featureCount":24,"lengthM":15714.9,"bounds":[292749.4098224128,1701097.6581289403,296569.5997240594,1705823.5443787405]},{"name":"Vaca","region":"UPRIIS","path":"FARMLAND GEOGRAPHIC INFORMATION SYSTEM (FGIS)/Canal Network Shapefiles/UPRIIS/Vaca/vaca_canal.shp","featureCount":19,"lengthM":27567.7,"bounds":[277278.3478212554,1722988.100279838,282876.5193959561,1727704.1490384913]}],"connectivityProjects":[{"id":"ib:p701:r13","title":"Concreting of Brgy. Mabuhay I - Brgy. Happy Valley FMR, Socorro, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r9","title":"Construction of Sitio Gandia, Alinunu FMR, Brgy. Alinunu, Abulug, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"East Apayao Abulug","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r4","title":"Construction of Brgy. Agpo to Brgy. Camagong FMR, Brgy. Agpo, Lagonoy and Brgy. Camagong, San Jose, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r15","title":"Construction of Brgy. San Miguel FMR, Brgy. San Miguel, San Simon, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r9","title":"Construction of Brgy. San Isidro - Lafurtuna FMR, Brgy. San Isidro to Brgy. Lafurtuna, Payao, Zamboanga Sibugay","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r4","title":"Construction of Brgy. Kilada - Brgy. Lower Malamote FMR, Brgy. Kilada, Matalam, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r14","title":"Concreting of Purok 1 Delta Brgy. Mangga Cacutud FMR, Brgy. Mangga Cacutud, Arayat, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Delta","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r10","title":"Construction of Brgy. Cacutud to Brgy. Mesulo FMR, Brgy. Cacutud, Arayat, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Delta","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r9","title":"Construction of Sitio Malutok, Brgy. Ransang FMR, Brgy. Ransang, Rizal, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r18","title":"Concreting of Sitio Abang, Brgy. Buga FMR, Brgy. Buga, Igbaras, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r19","title":"Construction of Brgy. San Roque Bitas FMR, Brgy. San Roque Bitas, Arayat, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":126.8,"system":"Pampanga Delta","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r17","title":"Construction of Brgy. Mahayahay FMR, Brgy. Mahayahay, Kumalarang, Zamboanga del Sur","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r11","title":"Construction of Sitio Mojon, Brgy. Libas to Brgy. Ocad FMR, Brgy. Libas, Lavezares, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r16","title":"Construction of Bad-ayan-Pugo-Lam-ayan-Sinto FMR, Brgy. Baculongan Sur, Brgy. Bangao and Brgy. Loo, Buguias, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r8","title":"Construction of Road 10, Brgy. Paradise - Brgy. Sampoli B FMR, Diplahan, Zamboanga Sibugay","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":0.0,"system":"Sibuguey Valley","fgisRegion":"Region IX","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r7","title":"Concreting of Sitio Caragmayan - Sitio Baje, Brgy. Buga FMR, Brgy. Buga, Igbaras, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r2","title":"Construction of NRJ, Soysoyan-Ballay-Tawangan-Lusod Proper FMR, Kabayan, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r10","title":"Construction of Brgy. Canculajao FMR, Brgy. Canculajao, Catanauan, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r3","title":"Construction of Sitio Pangdan to Sitio Malidlid FMR, Brgy. Bulacao, Gubat, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r3","title":"Construction/Improvement of Brgy. Bago FMR, Brgy. Bago, Ibaan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r2","title":"Construction of Brgy. Talolora to Sitio Canamucan FMR, Brgy. Talolora, Mondragon, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r15","title":"Concreting of Brgy. Malobago to Sitio Caodocan, Brgy. Tagharigue FMR, Brgy. Malobago and Brgy. Tagharigue, Calubian, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r9","title":"Construction of Tangatan-Casagan FMR, Sta. Ana, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":1120.8,"system":"Visitacion","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r11","title":"Construction of Sitio Pisaan, Brgy. Marsolo FMR, Brgy. Marsolo, Naga, Zamboanga Sibugay","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r18","title":"Construction of Brgy. Paya FMR, Brgy. Paya, Giporlos, Eastern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r17","title":"Construction of NRJ, Bana-ao-Besocol-Oleg-Aki FMR, Kabayan, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r14","title":"Construction of Brgy. Burgos FMR, Brgy. Burgos, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r7","title":"Construction of Brgy. San Lorenzo FMR, Brgy. San Lorenzo, Masinloc, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r16","title":"Construction of Brgy. Narvacan I FMR, Brgy. Narvacan I, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":2.2,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r19","title":"Construction of Sitio Old Pancol, Brgy. Pancol FMR, Brgy. Pancol, Taytay, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r7","title":"Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Nueva Valencia, Guimaras","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r4","title":"Construction of Brgy. Purisima FMR, Brgy. Purisima, Manapla, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r16","title":"Concreting of Sitio Kanluran, Brgy. Malamig - Sitio Bagong Silang, Brgy. Canubing I FMR, Calapan City, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":8.8,"system":"Baco Bacayao","fgisRegion":"Region IV-B","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r5","title":"Construction of Lower Balacbac, Brgy. Sto. Tomas Proper FMR Phase I, Brgy. Sto. Tomas Proper, Baguio City","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r14","title":"Construction of Provincial Road Rizal-Basilio St., San Andres FMR, Brgy. San Andres, Santiago City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r17","title":"Construction of Sitio Nalbot, Brgy. Poblacion FMR, Taytay, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r18","title":"Construction of Brgy. 25 Santa Cayetana FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":622.5,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r4","title":"Construction of Brgy. Malating FMR, Ramon Magsaysay, Zamboanga del Sur","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":3480.3,"system":"Salug","fgisRegion":"Region IX","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r18","title":"Construction of Brgy. Timamana FMR, Brgy. Timamana, Tubod, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r5","title":"Construction of Zone 6, Brgy. Panicuason FMR, Brgy. Panicuason, Naga City, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r10","title":"Construction of Malingawon, Brgy. Biwang FMR, Brgy. Biwang, Bagumbayan, Sultan Kudarat","region":"REGION XII - SOCCSKSARGEN","distanceM":800.6,"system":"Ala","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r4","title":"Construction of Brgy. Anduyan FMR, Brgy. Anduyan, Tubao, La Union","region":"REGION I - ILOCOS","distanceM":806.9,"system":"Masalip","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r5","title":"Construction of Bagong Silang FMR, Brgy. Bagong Silang, Plaridel, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS bulacan","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r5","title":"Concreting of Sitio Pole Dyutay, Brgy. La Paz FMR, Brgy. La Paz, Zamboanga City","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r17","title":"Construction of Brgy. Alacan to Brgy. Mabilao FMR, Brgy. Alacan and Brgy. Mabilao, San Fabian, Pangasinan","region":"REGION I - ILOCOS","distanceM":1269.2,"system":"Masalip","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r10","title":"Construction of Brgy. Buga FMR, Brgy. Buga, Leon, lloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r14","title":"Construction of Siwata - Hinatigan to Eco Park, Brgy. Poblacion FMR, Brgy. Poblacion, Bacuag, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r9","title":"Concreting of Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r11","title":"Construction of Brgy. Bendita 2 - Bulbok FMR, Magallanes, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r8","title":"Construction of Brgy. Pongtud to Fish and Boat Landing FMR, Brgy. Pongtud, Alegria, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r13","title":"Construction of Purok 1, Brgy. Purakan FMR, Brgy. Purakan, Linamon, Lanao del Norte","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r14","title":"Concreting of Brgy. Kirayan Tacas - Brgy. Pungtod Naulid FMR, Brgy. Kirayan Tacas and Brgy. Pungtod, Naulid, Miagao, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r8","title":"Concreting of Brgy. Isaub FMR, Brgy. Isaub, Aborlan, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r3","title":"Construction of Brgy. Dolores FMR, Brgy. Dolores, Capas, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r12","title":"Construction of Brgy. Tambac FMR, Brgy. Tambac, Bayambang, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r7","title":"Construction of Brgy. San Lorenzo-Nagbalagan-Malasin-Lanao FMR, Bangui, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":0.0,"system":"Bolo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r14","title":"Construction of Brgy. Tarabucan to Brgy. Jacinto FMR, Brgy. Tarabucan and Brgy. Jacinto, Calbayog City, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r11","title":"Concreting of Brgy. Alejal - Alemag, Brgy. Alejal and Brgy. Magsaysay, Carmen, Davao del Norte","region":"REGION XI - DAVAO","distanceM":6.4,"system":"Lasang","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r14","title":"Construction of Brgy. Pagdugue - Brgy. Cansilayan FMR, Dumangas, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":0.0,"system":"Jalaur Proper","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r8","title":"Construction of Road, Sitio Tiglawaan, Brgy. Lingasad – Brgy. Magangon, Polanco, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r18","title":"Construction of Purok 9-D, Brgy. Alejal FMR, Brgy. Alejal, Carmen, Davao del Norte","region":"REGION XI - DAVAO","distanceM":11.3,"system":"Lasang","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r3","title":"Construction of Cata'lappan-Saramais, Brgy. Anonat FMR, Brgy. Anonat, Paracelis, Mountain Province","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":2494.0,"system":"Mallig","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r6","title":"Construction of Brgy. Banyaga FMR, Brgy. Banyaga, Agoncillo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r10","title":"Concreting of NRJ Purok 4, Brgy. De Oro - Bugsukan FMR, Butuan City","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r18","title":"Construction of Brgy. Cuyaoyao to Brgy. Flores FMR, Pio Duran, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r2","title":"Construction of Zone 1 Hanawan FMR, Brgy. Hanawan, Ocampo, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r9","title":"Construction of Purok 1 Brgy. San Pedro FMR, Brgy. San Pedro, Alegria, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r6","title":"Construction of Brgy. Baligang to Brgy. Bongabong FMR, Brgy. Baligang and Brgy. Bongabong, Camalig, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r16","title":"Construction of Brgy. Agos to Brgy. Cotnogan FMR, Brgy. Agos, Polangui, Albay","region":"REGION V - BICOL","distanceM":1686.8,"system":"Lower lalo","fgisRegion":"Region V","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r9","title":"Concreting of Sitio Carina, Brgy. Sta.Monica FMR, Brgy. Sta. Monica, Oton, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":1675.8,"system":"Aganan","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r12","title":"Construction of Purok Bucana, Brgy. Manalo FMR, Brgy. Manalo FMR, Puerto Princesa, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r17","title":"Construction of Purok 9-B, Brgy. Alejal FMR, Brgy. Alejal, Carmen, Davao del Norte","region":"REGION XI - DAVAO","distanceM":0.0,"system":"Lasang","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r16","title":"Construction of Brgy. Baduang FMR, Brgy. Baduang, Pagudpud, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r18","title":"Construction of Avas, Brgy. Sarayan FMR Phase I, Brgy. Sarayan, President Roxas, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r3","title":"Construction of Brgy. Kulapi FMR, Brgy. Kulapi, Lucban, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r2","title":"Construction of Brgy. Bobonan - Brgy. Nama - Brgy. Palacpalac FMR, Brgy. Bobonan, Brgy. Nama and Brgy. Palacpalac, Villasis, Pangasinan","region":"REGION I - ILOCOS","distanceM":5018.4,"system":"Agno","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r9","title":"Construction of Sitio Cabaruan Road FMR, Nagsanga, Pasuquin, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":0.0,"system":"Sulvec","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r5","title":"Construction of Bacayao to Cavite FMR, Brgy. Bacayao to Brgy. Cavite, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r12","title":"Construction of Brgy. Balansay FMR, Brgy. Balansay, Mamburao, Occidental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r8","title":"Construction of Brgy. Obayan to Brgy. Loctob FMR, Brgy. Obayan and Brgy. Loctob, Pinabacdao, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":1616.6,"system":"Calbiga","fgisRegion":"Region VIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r16","title":"Concreting of Brgy. Unidos - Brgy. Agunod to Brgy. Quirino FMR, Plaridel, Misamis Occidental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r13","title":"Construction of Brgy. Pantao FMR, Brgy. Pantao, Talipao, Sulu","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r13","title":"Construction of Brgy. San Roque FMR, Brgy. San Roque, Lupao, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Macanae","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r17","title":"Construction of Brgy. Habuhab FMR, Brgy. Habuhab, Culaba, Biliran","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r4","title":"Construction of Brgy. Bigaan FMR, Brgy. Bigaan, Hinatuan, Surigao del Sur","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r15","title":"Construction of Brgy. Motorpool, Tubod to Brgy. Sto. Rosario, Bacuag FMR, Brgy. Motorpool, Tubod, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r13","title":"Construction of Sitio Amamaylan to Purok 1 Obod-obod, Brgy. Baan Km. 3 FMR, Butuan City","region":"REGION XIII - CARAGA","distanceM":0.0,"system":"Lower Agusan River","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r10","title":"Construction of Brgy. San Isidro FMR, Brgy. San Isidro, Talakag, Palawan","region":"REGION IVB - MIMAROPA","distanceM":91.2,"system":"Talakag","fgisRegion":"Region X","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r16","title":"Construction of Sitio Guia, Brgy. Polayagan to Sitio Sambacan, Brgy. Barangiran FMR Phase I, Brgy. Polayagan and Brgy. Baranginan, Alamada, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r5","title":"Construction of Brgy. Macalong FMR, Brgy. Macalong, Asingan, Pangasinan","region":"REGION I - ILOCOS","distanceM":8.1,"system":"Agno","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r9","title":"Construction of Cata'lappan-Sinamar, Brgy. Anonat FMR, Paracelis, Mountain Province","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":2496.0,"system":"Mallig","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r3","title":"Construction of Brgy. San Vicente FMR, Brgy. San Vicente, Alcala, Pangasinan","region":"REGION I - ILOCOS","distanceM":485.9,"system":"Lower Agno","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r16","title":"Construction of Purok 3 to Purok 2 Brgy. Pungtod FMR, Brgy. Pungtod, Bacuag, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":750.9,"system":"Baoy","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r7","title":"Construction of Brgy. 36 Araniw FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r15","title":"Construction of Purok 6 to Purok 4 Brgy. Pautao FMR, Brgy. Pautao, Bacuag, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":752.2,"system":"Baoy","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r4","title":"Concreting of Brgy. Sambong FMR, Brgy, Sambong, Tagaytay City, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r5","title":"Construction of Brgy. Nancalabasaan - Brgy. Don Montano FMR, Brgy. Nancalabasaan and Brgy. Don Montano, Umingan, Pangasinan","region":"REGION I - ILOCOS","distanceM":3313.4,"system":"Dipalo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r9","title":"Concreting of JNH Bantogon (Santa Clara) Nursery - Nalugdas FMR Phase I, Brgy. Bantogon, Kalamansig, Sultan Kudarat","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r8","title":"Concreting of Sitio Tagaktak - Lower Kabuling - Upper Kabuling - Sitio Agsam, Brgy. Limulan FMR Phase I, Brgy. Limulan, Kalamansig, Sultan Kudarat","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r6","title":"Concreting of Daray-Asen Sapang, Brgy. San Vicente FMR, Brgy. San Vicente, Alaminos City, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r4","title":"Construction of Brgy. Maramara to Purok 3, Brgy. Maramara FMR, Brgy. Maramara, Don Victoriano, Misamis Occidental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r6","title":"Construction of P3 Luna to Sitio Bunga, Brgy. Luna FMR Phase 2, Brgy. San Jose, Dinagat Islands","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r10","title":"Construction of Purok 2 Brgy. San Pedro FMR, Brgy. San Pedro, Alegria, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r16","title":"Construction of Brgy. Hanggan FMR, Brgy. Hanggan, Calauan, Laguna","region":"REGION IVA - CALABARZON","distanceM":1735.7,"system":"Sta Cruz","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r3","title":"Construction of Brgy. Tarrag San Miguel FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":188.4,"system":"Bolo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r7","title":"Construction of Brgy. San Pedro to Fish Landing FMR, Brgy. San Pedro, Alegria, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r11","title":"Construction of Purok 6 to Aurelio Street, Brgy. Dontogan FMR, Brgy. Dontogan, Baguio City","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r7","title":"Construction of Charatayan-San Miguel Phase II FMR, Basco, Batanes","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r8","title":"Construction of Brgy. Trapiche FMR, Tanauan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r18","title":"Construction of Adaoay-Batan Adaoay and Batan FMR, Adaoay, Kabayan, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r17","title":"Construction of Brgy. Bitoka to Brgy. Milaya FMR, Brgy. Bitoka and Brgy. Milaya, Midsayap, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":10759.0,"system":"Maridagao","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r6","title":"Construction of Bantug to Macatcatuit FMR, Brgy. Bantug to Brgy. Macatcatuit, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r15","title":"Construction of Brgy. 29 FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":267.8,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r12","title":"Construction of Sitio Busay, Brgy. Apale FMR, Brgy. Apale, Isabel, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r5","title":"Opening and Concreting of Sitio Saimsim, Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r2","title":"Construction of Brgy. Taal FMR, Brgy. Taal, Pulilan, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS bulacan","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r2","title":"Construction of Brgy. 27 FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":1.1,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r8","title":"Construction of Brgy. Bigaa FMR, Legazpi City, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r15","title":"Construction of Sitio Kage, Brgy. Agbanga to Sitio San Antonio, Brgy. Itum FMR, Brgy. Agbanga and Brgy. Itum, Matalom, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r6","title":"Opening and Concreting of Sitio Balugbog, Brgy. Soloc FMR, Brgy. Soloc, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r6","title":"Concreting of Sitio Liangan, Brgy. Kabatan to Lunib FMR, Brgy. Kabatan, Vincenzo Sagun, Zamboanga del Sur","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r7","title":"Construction of Brgy. Lunib FMR, Vincenzo A. Sagun, Zamboanga del Sur","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r4","title":"Construction of Brgy. Sta. Clara FMR, Brgy. Sta. Clara, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":94.7,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r3","title":"Construction of Brgy. Bacolod FMR, Brgy. Bacolod, Libon, Albay","region":"REGION V - BICOL","distanceM":1.4,"system":"South Quinale","fgisRegion":"Region V","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r19","title":"Construction of Sitio Gugo, Brgy. San Jose Sico FMR, Brgy. San Jose Sico, Batangas City, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r11","title":"Concreting of Brgy. Malabrigo FMR, Brgy. Malabrigo, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r12","title":"Construction of FMR at Dulong Ilog - Bahay Pare Road, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r18","title":"Construction of Brgy. Bunol FMR, Brgy. Bunol, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":56.4,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r18","title":"Construction of Sitio Bunggoy 5, 6, and 7 Sanjera Tanap, Brgy. Burayoc, Baduang and Poblacion 2, Pagudpud FMR, Pagudpud, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r2","title":"Concreting of Brgy. Malayantoc FMR, Brgy. Malayantoc, Santo Domingo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":10.1,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r17","title":"Construction of Sitio llaya, Centro, Masayahin, Jangdong 1 to Sitio Pook, Brgy. Lutucan 1 FMR, Sariaya, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r16","title":"Construction of Brgy. Anabo FMR, Brgy. Anabo, Lemery, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r8","title":"Construction of Sitio Alangyan, Brgy. Kinama FMR, Brgy. Kinama, Rizal, Kalinga","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":6601.2,"system":"Lower Chico","fgisRegion":"CAR","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r12","title":"Construction of Brgy. Banog Norte FMR, Brgy. Banog Norte, Bani, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r4","title":"Construction of Cadaanan West FMR, Brgy. Pancian, Pagudpud, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r14","title":"Construction of Brgy. Macarang FMR, Brgy. Macarang, Mangatarem, Pangasinan","region":"REGION I - ILOCOS","distanceM":1338.9,"system":"CAM RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r16","title":"Construction of Brgy. Buhing Kalipay to Siargao Agri-fishery Research, Development and Extension Center (SIARDEC) FMR, San Isidro, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r8","title":"Concreting of Sitio Pasong, Brgy. Jovellar - Sitio Capayan, Brgy. Calampitao FMR, Brgy. Jovellar and Brgy. Calampitao, Igbaras, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r3","title":"Construction of Brgy. Tabangao Ambulong FMR, Brgy. Tabangao Ambulong, Batangas City","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r12","title":"Construction of Gadu-Padul FMR, Solana, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r17","title":"Construction of Brgy. Tarrag FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":1023.4,"system":"Bolo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r6","title":"Construction of Montapet, Brgy. Ambalgan FMR, Brgy. Ambalgan, Sto. Niño, South Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r17","title":"Construction of Brgy. South Poblacion to Brgy. Liong FMR, Brgy. South Poblacion, Guinsiliban, Camiguin","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r12","title":"Construction of Brgy. Nabulao FMR, Brgy. Nabulao, Sipalay City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r3","title":"Construction of Brgy. Parian to Brgy. Pagudpud to Brgy. San Vicente FMR, Brgy. Parian, San Fernando City, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r4","title":"Concreting of Brgy. Tuyo - Brgy. Wilson - Brgy. Ormocay FMR, Brgy. Tuyo, MacArthur and Brgy. Wilson and Brgy. Ormocay, Mayorga, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":0.0,"system":"Ibawon","fgisRegion":"Region VIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r8","title":"Construction of Brgy. Nagaasan to Sitio Camaoy FMR, Brgy. Nagaasan, Babatngon, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r5","title":"Construction of Brgy. Taclobo to Brgy. Pili FMR, Brgy. Taclobo, San Fernando, Romblon","region":"REGION IVB - MIMAROPA","distanceM":0.0,"system":"Cantingas","fgisRegion":"Region IV-B","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r10","title":"Construction of Brgy. Cabungaan A FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":315.8,"system":"Bonga Pump 3","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r11","title":"Construction of Brgy. La Suerte FMR, Brgy. La Suerte, Amulung, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r16","title":"Construction of Brgy. Sulpa to Sitio Agob-ob FMR, Brgy. Sulpa, Villaba, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r7","title":"Construction of Purok 2 to Purok 1, Sitio Pugo, Brgy. San Juan FMR, Brgy. San Juan, Alfonso Lista, Ifugao","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":0.0,"system":"Magat div 3","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r4","title":"Concreting of Brgy. Libaong - Brgy. Lourdes FMR, Panglao, Bohol","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r6","title":"Construction of Brgy. Bani FMR, Brgy. Bani, Bacarra, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":1569.8,"system":"NMC","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r8","title":"Construction of Brgy. 51-A Nangalisan East FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":583.3,"system":"Bonga Pump 2","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r3","title":"Construction of Brgy. Casongsong FMR, Brgy. Casongsong, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":53.1,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r9","title":"Concreting of Sitio Bayuco, Brgy. Taytay - Sitio Langhad, Brgy. Alameda FMR, Brgy. Taytay and Brgy. Alameda, Igbaras, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r2","title":"Construction of Brgy. Tarrag Hardin FMR, Brgy. Tarrag, Pagudpud, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":341.7,"system":"Bolo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r13","title":"Concreting of Brgy. Ilog-Ilog - Brgy. Narorogan FMR, Brgy. Ilog-Ilog and Brgy. Narrorogan, Miagao, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r18","title":"Construction of Brgy. Bocacliw FMR, Brgy. Bocacliw, Aguilar, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r17","title":"Construction of Brgy. Adcadarao FMR, Brgy. Adcadarao, Ajuy, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r10","title":"Construction of Brgy. Dalayap FMR, Brgy. Dalayap, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":6.6,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r11","title":"Construction of San Jose Oras-Villaflorida FMR, Brgy. San Jose Oras, Ocampo, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r7","title":"Construction of Brgy. Aguso FMR, Brgy. Aguso, Tarlac City, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":4.3,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r14","title":"Construction of Brgy. Miswa FMR, Brgy. Miswa, Infanta, Quezon","region":"REGION IVA - CALABARZON","distanceM":0.0,"system":"Agos","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r4","title":"Construction of Baguio Animal Breeding Research Center (BABRC), Brgy. Dontogan FMR Phase II, Brgy. Dontogan, Baguio City","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r16","title":"Construction of Pamalian FMR, Brgy. Pila, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":119.6,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r3","title":"Construction of Brgy. Manalo FMR, Brgy. Manalo, Puerto Princesa City, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r6","title":"Construction of Brgy. Poblacion 02 - Brgy. Tabungao, Brgy. Dilanis, Brgy. Sta. Catalina & Brgy. Pangil FMR, Brgy. Poblacion 02- Brgy. Tabungao, Brgy. Dilanis, Brgy. Sta. Catalina, & Brgy. Pangil, Pasuquin, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":490.4,"system":"NMC","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r6","title":"Construction of San Lorenzo FMR, Brgy. San Lorenzo, Bangui, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":490.4,"system":"NMC","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r4","title":"Construction of Brgy. Siana to Brgy. Dayano FMR, Brgy. Siana, Mainit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r6","title":"Construction of Busilac-Laya FMR, Brgy. Busilac, Alfonso Lista, Ifugao","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r11","title":"Construction of Brgy. Paralaya - Brgy. Magumbali FMR, Brgy. Paralaya, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":2094.2,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r6","title":"Construction of Purok Fermina, Brgy. Ma-ao FMR, Brgy. Ma-ao, Bago City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":2521.0,"system":"Bago","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r7","title":"Concreting of Sitio Bulao, Brgy. Digdigon - Brgy. Cagaycay FMR, Goa, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r18","title":"Concreting of Zone 5 - Immaculate Conception Shrine, Brgy. Sambulawan FMR, Brgy. Sambulawan, Laguindingan, Misamis Oriental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r11","title":"Construction of Brgy. Bulata FMR, Brgy. Bulata, Cauayan, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r15","title":"Opening and Construction of Brgy. Pansol FMR, Brgy. Pansol, Lopez, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r3","title":"Concreting of Brgy. Iba FMR, Brgy. Iba, Silang, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r13","title":"Concreting of Brgy. Puniton - Brgy. Sto. Domingo FMR, Virac, Catanduanes","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r6","title":"Construction of Purok 3A Brgy. Alusiis to Lambingan Bridge, Brgy. San Pascual FMR, Brgy. Alusiis, San Narciso, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r12","title":"Construction of Brgy. Delabayan West FMR, Brgy. Delabayan West, Bacolod, Lanao del Norte","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r7","title":"Construction of Brgy. Concepcion to Brgy. Balagbag FMR, Brgy. Concepcion, Alitagtag, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r3","title":"Concreting of Brgy. Sawang FMR, Brgy. Sawang, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r11","title":"Construction of Brgy. Cabungaan B FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":1050.7,"system":"Bonga Pump 3","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r18","title":"Construction of Quirat Road-Lachica Street, Rizal FMR, Santiago City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r13","title":"Construction of Brgy. Gapasan FMR, Brgy. Gapasan, Magsaysay, Occidental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":875.1,"system":"Caguray","fgisRegion":"Region IV-B","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r12","title":"Concreting of Sitio Naambon, Brgy. Nag-iba FMR, Brgy. Nag-iba, Mabini, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r10","title":"Concreting of Villaflores - Tactac FMR, Brgy.Villaflores, Sta. Fe, Nueva Vizcaya","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r8","title":"Concreting of Brgy. Burabod FMR, Brgy. Burabod, Biliran, Biliran","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r17","title":"Construction of Brgy. 1 San Lorenzo FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":73.7,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r20","title":"Construction of Sitio Dinacpan, Brgy. Karikitan to Sitio Tagtagat, Brgy. Calafug FMR, Conner, Apayao","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r8","title":"Construction of Sitio Crossing to Sitio Sabang, Brgy. Hagonghong FMR, Brgy. Hagonghong, Buenavista, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r14","title":"Construction of Camangaan - Rioeng FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":475.7,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r18","title":"Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Busuanga, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r15","title":"Construction of Brgy. Poblacion FMR, Brgy. Poblacion, Anilao, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":5011.7,"system":"Jalaur Extension","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r9","title":"Construction of Sitio Malapia, Brgy. Samil FMR, Lucban, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r10","title":"Construction of Zone 1, Brgy. Balubal FMR, Cagayan de Oro City","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r10","title":"Concreting of Sitio Danlagan, Brgy. Banquerohan, Legaspi City, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r10","title":"Construction of Lower Balacbac, Brgy. Sto. Tomas Proper FMR Phase II, Brgy. Sto. Tomas Proper, Baguio City","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r20","title":"Construction of Brgy. Maliwanag FMR, Baroy, Lanao del Norte","region":"REGION X - NORTHERN MINDANAO","distanceM":4950.9,"system":"Maranding","fgisRegion":"Region X","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r9","title":"Construction of Brgy. Mompeller to Brgy. Apo FMR, Brgy. Mompeller and Brgy. Apo, Argao, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r12","title":"Construction of Gabol Road 1, Purok 9-A, Brgy. Irisan FMR, Brgy. Irisan, Baguio City","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r12","title":"Construction of Sitio Ragpas to Purok 3, Brgy. San Jose FMR, Brgy. San Jose, Basud, Camarines Norte","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r17","title":"Construction of Brgy. Bacao FMR, Brgy. Bacao, Taysan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r13","title":"Construction of Gen. Luna to Carmen FMR, Brgy. Gen. Luna to Brgy. Carmen, Zaragoza, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Bungabon Extension","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r17","title":"Construction of Brgy. Alangilan FMR, Brgy. Alangilan, Bacolod City","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r7","title":"Construction of Brgy. Magacan to Brgy. Callungan FMR, Brgy. Magacan and Brgy. Callungan, Sanchez Mira, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r12","title":"Construction of Brgy. Banaba Cerca - Brgy. Banaba Lejos FMR, Brgy. Banaba Cerca to Brgy. Banaba Lejos, Indang, Cavite","region":"REGION IVA - CALABARZON","distanceM":595.6,"system":"Culong Culong","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r9","title":"Construction of Brgy. Salapungan FMR, Brgy. Salapungan, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r3","title":"Construction of Brgy. Nalunao FMR, Brgy. Nalunao, Lucban, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r5","title":"Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":2.7,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r9","title":"Construction of Brgy. Manlingay - Brgy. Bugnay - Brgy. Napasu-An - Brgy. Tadlong FMR, Mabinay, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r10","title":"Concreting of Sitio Curipao - Sitio Napuong, Brgy. Constancia FMR, Brgy. Constancia, San Lorenzo, Guimaras","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r9","title":"Construction of Brgys. Annafatan-Namuccauan-Calintaan-Masical-Pacac-Pequeno-Pacac Grande FMR, Amulung, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r13","title":"Construction of Camangaan - Brgy. 29 FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":531.9,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r8","title":"Construction of Brgy. San Agustin FMR, Brgy. San Agustin, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r13","title":"Construction of Purok Bagong Silang Brgy. Campo, Bacuag to Sitio Puyo Brgy. Poniente, Gigaquit FMR, Brgy. Campo, Bacuag and Brgy. Poniente, Gigaquit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":23.9,"system":"Baoy","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r13","title":"Construction of Brgy. Antagan to Brgy. Poblacion FMR, Brgy. Antagan, San Pablo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r13","title":"Construction of Brgy. Banyaga FMR, Brgy. Banyaga, Agoncillo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r5","title":"Construction/Improvement of Brgy. Bungahan FMR, Brgy. Bungahan, Ibaan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r8","title":"Construction of Brgy. Nemmatan FMR, Brgy. Nemmatan, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r16","title":"Concreting of Brgy. Bulacan FMR, Brgy. Bulacan, Mabini Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r9","title":"Concreting of Brgy. Bool-West FMR (Phase II), Brgy. Bool-West, Culaba, Biliran","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r4","title":"Concreting of Sitio Dayapan, Brgy. San Miguel - Brgy. Tayuman FMR, Brgy. San Miguel and Brgy. Tayuman, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r16","title":"Concreting of Brgy. Cadumanian FMR, Brgy. Cadumanian, Rosario, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r15","title":"Concreting of Brgy. Poblacion West - Brgy. Concepcion FMR, Rosario, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r18","title":"Construction of Brgy. Bannawag (Sito Dulay) FMR, Brgy. Bannawag, Diffun, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":34.9,"system":"Balikatan DD div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r14","title":"Construction of Brgy. Buclad FMR, Brgy. Buclad, Asuncion, Davao del Norte","region":"REGION XI - DAVAO","distanceM":289.4,"system":"Saug","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r14","title":"Construction of Brgy. Sta. Lucia Young to San Isidro FMR, Brgy. Sta. Lucia Young to Brgy. San Isidro, Zaragoza, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Bungabon Extension","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r9","title":"Construction of Brgy. Pinagtubigan Weste to Brgy. Pambuhan FMR, Brgy. Pinagtubigan Weste to Brgy. Pambuhan, Perez, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r6","title":"Construction of Brgy. Minapan - Brgy. Maybula FMR, Brgy. Minapan, Tulunan, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":0.0,"system":"Malasila","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r7","title":"Opening and Concreting of Brgy. San Miguel - Brgy. Tayuman FMR, Brgy. San Miguel and Brgy. Tayuman, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r18","title":"Construction of Purok Norte to Purok Ipil, Brgy. Bato FMR, Brgy. Bato, Taytay, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r3","title":"Construction of Purok Modelo - Purok Malipayon, Brgy. Bangbang FMR, Brgy. Bangbang, Matalam, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":0.0,"system":"Mlang","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r4","title":"Construction of Brgy. Gegacjac FMR, Brgy. Gegacjac, Passi City, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r13","title":"Construction of Brgy. Aroman FMR, Brgy. Aroman, Carmen, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r16","title":"Construction of Brgy. Mancup - Brgy. Talibaew FMR, Brgy. Mancup and Brgy. Talibaew, Calasiao, Pangasinan","region":"REGION I - ILOCOS","distanceM":0.0,"system":"Sinocalan","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r16","title":"Construction of Brgy. Odiong FMR, Brgy. Odiong, Roxas, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r10","title":"Construction of Brgy. Agot FMR, Boac, Marinduque","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r4","title":"Concreting of Sitio Narra - Purok Marangig, Brgy. New Albay FMR, Brgy. New Albay, Maragusan, Davao de Oro","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r7","title":"Construction of Brgy. Pangulo to Brgy. Linao FMR, Brgy. Pangulo, Calatrava, Romblon","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r17","title":"Concreting of Brgy. Isauan - Brgy. Ingay FMR, Brgy. Isauan and Brgy. Ingay, Tubungan, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r11","title":"Construction of Brgy. Balud Lilo-an FMR, Brgy. Balud Lilo-an, Zarraga, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":11.8,"system":"Jalaur Proper","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r9","title":"Construction of Brgy. Tanap-Brgy. Nagsurot FMR, Burgos, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r12","title":"Construction of Brgy. Buttong FMR, Brgy. Buttong, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":75.8,"system":"Bonga Pump 2","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r2","title":"Construction of Brgy. Sto. Rosario Young FMR, Brgy. Sto. Rosario Young, Zaragoza, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Bungabon Extension","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r5","title":"Construction of J Gonzales-Bangan Bubon Chocolate Brgy. Amungan FMR, Brgy. Amungan, Iba, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r11","title":"Construction of Brgy. San Jose FMR, Brgy. San Jose, San Luis, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r7","title":"Construction of Brgy. Malabrigo FMR, Brgy. Malabrigo, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r12","title":"Construction of Brgy. San Miguel - Brgy. Maca-anga FMR, Llorente, Eastern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r6","title":"Construction of Brgy. 30-B Santa Maria FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":1.4,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r9","title":"Construction of Brgy. Bahay Pare FMR, Brgy. Bahay Pare, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":6.5,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r4","title":"Construction of Brgy. Plaridel FMR, Brgy. Plaridel, Aborlan, Palawan","region":"REGION IVB - MIMAROPA","distanceM":2.9,"system":"Malatgao","fgisRegion":"Region IV-B","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r2","title":"Construction of Brgy. Tangub, Brgy. Tangub, Bacolod City","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r18","title":"Construction of Brgy. Balud FMR, Brgy. Balud, San Fernando, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r2","title":"Concreting of Sitio Siare, Brgy. Baybay FMR, Brgy. Baybay, Alubijid, Misamis Oriental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r10","title":"Construction of ROS Hillyland Botolan, Brgy. Porac FMR, Brgy. Porac, Botolan, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r10","title":"Construction of Brgy. Magangon, Polanco - Brgy. Del Pilar, Piñan FMR, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r16","title":"Construction of Brgy. Dacutan - Brgy. Ermita, Dumangas, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":146.9,"system":"Jalaur Proper","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r16","title":"Construction of Sitio Arado, Brgy. Poblacion FMR, Taytay, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r17","title":"Construction of Brgy. Cabangila FMR, Brgy. Cabangila, Altavas, Aklan","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r13","title":"Construction of Brgy. Linayuan to Brgy. Sinuagan FMR, Brgy. Linayuan and Brgy. Sinuagan, Badiangan, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r6","title":"Construction of Brgy. Sagrada FMR, Baao, Camarines Sur","region":"REGION V - BICOL","distanceM":21.6,"system":"Barit","fgisRegion":"Region V","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r4","title":"Concreting of Brgy. Tayuman - Brgy. San Miguel FMR, Brgy. Tayuman and Brgy. San Miguel, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r16","title":"Concreting of Camino Dos, Brgy. Sto. Rosario FMR, Brgy. Sto. Rosario, Mexico, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":917.0,"system":"Pampanga Delta","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r7","title":"Construction of Brgy. Silangan Maligaya FMR, Brgy. Silangan Maligaya, Agdangan, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r6","title":"Concreting of Purok Ubbog, Brgy. Paraiso - Purok 2, Brgy. Magdalena FMR, Cabatuan, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 2","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r15","title":"Construction of Sitio Pandak, Brgy. Kalyaat FMR, Brgy. Kalyaat, Lucban, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r12","title":"Concreting of Brgy. Tayuman FMR, Brgy. Tayuman, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r15","title":"Construction of Brgy. Gaid to Brgy. Divisoria FMR, Brgy. Gaid to Brgy. Divisoria, Dimasalang, Masbate","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r17","title":"Construction of Brgy. Bucot FMR, Brgy. Bucot, Aliaga, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.6,"system":"Aliaga","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r2","title":"Construction of Brgy. Kipit FMR Phase II, Brgy. Kipit, Labason, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r16","title":"Construction of Spanish Road Brgy. Linglingay FMR, Alicia, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 2","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r13","title":"Construction of Brgy. Genitligan FMR, Brgy. Genitligan, Baras, Catanduanes","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r16","title":"Construction of Brgy. San Diego, Luisiana to Brgy. Banti FMR, Majayjay, Laguna","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r13","title":"Construction of Brgy. Bahay Pare to Brgy. Vizal Sto. Niño FMR, Brgy. Bahay Pare, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r5","title":"Construction of Brgy. Maindang FMR, Brgy. Maindang, Cuartero, Capiz","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r13","title":"Construction of Purok 5 to Purok 6 Brgy. Wangke FMR, Brgy. Wangke, Claver, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r6","title":"Construction of Brgy. Bueno FMR, Brgy. Bueno, Capas, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r12","title":"Construction of Brgy. Palanguia FMR, Brgy. Palanguia, Pototan, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":5568.3,"system":"Jalaur Proper","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r18","title":"Concreting of Brgy. Pacac FMR, Brgy. Pacac, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":16.5,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r15","title":"Concreting of Road, CARBDP Service Road, Brgy. San Vicente Section, Brgy. San Vicente, Butuan City","region":"REGION XIII - CARAGA","distanceM":865.4,"system":"Lower Agusan River","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r15","title":"Construction of Brgy. Lingaling FMR, Brgy. Lingaling, Santa Maria, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r8","title":"Construction of NRJ Purok Sun Flower, Brgy. Gamut FMR Phase II, Brgy. Gamut, Tago, Surigao del Sur","region":"REGION XIII - CARAGA","distanceM":770.2,"system":"Tago","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r14","title":"Construction of Road, Purok 3 , Brgy. Dumalagan, Butuan City","region":"REGION XIII - CARAGA","distanceM":1.2,"system":"Lower Agusan River","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r9","title":"Construction of FMR at Brgy. Balaong (Phase II), San Miguel, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r11","title":"Construction of Brgy. Caruan FMR, Brgy. Caruan, Pasuquin, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r5","title":"Concreting of Brgy. Cabasaran to Brgy. Bacayawan FMR going to Munai Road, Brgy. Cabasaran, Madalum, Lanao del Sur","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r15","title":"Construction of Brgy. Bagong Sikat FMR, Brgy. Bagong Sikat, Cabiao, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r14","title":"Construction of Lower Englandad-Tagongtongao- Boneng FMR, Brgy. Paoay, Atok, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r13","title":"Construction of Brgy. Nagpalanga FMR, Brgy. Nagpalanga, Binmaley, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r8","title":"Concreting of Brgy. Turod Sur FMR, Brgy. Turod Sur, Cordon, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Balikatan DD div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r3","title":"Construction of Brgy. Santa Catalina to Brgy. La Trinidad FMR, Brgy. Santa Catalina and Brgy. La Trinidad, Mondragon, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r7","title":"Construction of Purok Paghidaet, Brgy. Sagasa FMR, Brgy. Sagasa, Bago City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":0.0,"system":"Bago","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r4","title":"Construction of Brgy. 41 Balacad FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r7","title":"Construction of Brgy. Tenejero FMR, Brgy. Tenejero, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r7","title":"Construction of Brgy. San Roque FMR, Brgy. San Roque, Marabut, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r13","title":"Construction of Kimmulluong FMR, Brgy. Sinaoangan Sur, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":549.2,"system":"Dabubu","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r13","title":"Construction of Brgy. Mayag FMR, Brgy. Mayag, Bauco, Mountain Province","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r12","title":"Concreting of Brgy. Parian FMR, Brgy. Parian, Mexico, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":1879.1,"system":"Pampanga Delta","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r10","title":"Construction of Sitio Sto. Niño, Poblacion 2 to Sitio Balete, Brgy. Imelda, Claveria FMR, Poblacion 2, Claveria, Masbate","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r11","title":"Concreting of Brgy. Bignay 1 to Montecillo FMR, Brgy. Bignay 1 to Montecillo, Sariaya, Quezon","region":"REGION IVA - CALABARZON","distanceM":731.6,"system":"Hanagdong","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r11","title":"Construction of Togbongan-Pajag Phase II FMR, Brgy. Himama-ug, Taganaan, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r2","title":"Construction of Brgy. Tabango Dao FMR, Brgy. Tabango Dao, Batangas City","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r8","title":"Construction of Sitio Surai, Brgy. Calaylayan FMR, Brgy. Calaylayan, Abucay, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r7","title":"Construction of Brgy. San Agustine FMR, Brgy. San Agustine, San Miguel, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r14","title":"Construction of Brgy. San Isidro FMR, Brgy. San Isidro, Minalin, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r11","title":"Construction of Brgy. Ilayang Palale FMR, Brgy. Ilayang Palale, Tayabas City, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r2","title":"Construction of Brgy. Bilibinwang FMR, Brgy. Bilibinwang, Agoncillo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r18","title":"Construction of Brgy. Soguilon FMR, Siayan, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r14","title":"Construction of Purok 3 Brgy. Balsik to Brgy. Pulo FMR, Brgy. Balsik, Hermosa, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Layak Balsik","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r6","title":"Construction of Sitio Tagaytay, Brgy. Tulay FMR, Brgy. Tulay, Odiongan, Romblon","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r16","title":"Construction of Brgy. Concepcion FMR, Brgy. Concepcion, San Simon, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r17","title":"Concreting of Brgy. Masaya Norte FMR, Brgy. Masaya Norte, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r14","title":"Construction of Bacsay, Mapulalupa FMR, Brgy. Mapulalupa, Claveria, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r11","title":"Concreting of Brgy. Pajo - Brgy. Igang FMR, Pototan, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":2.6,"system":"Jalaur Proper","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r6","title":"Construction of Brgy. Talongonan FMR, Passi City, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r12","title":"Construction of Brgy. Tamisan FMR, Brgy. Tamisan, Jose Panganiban, Camarines Norte","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r3","title":"Construction of Brgy. Macalong (Cell Site) FMR, Brgy. Macalong, Kasibu, Nueva Vizcaya","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r4","title":"Construction of Brgy. Buisan FMR, Brgy. Buisan, Bustos, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS bulacan","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r12","title":"Construction of Sungkoy-Sumanga FMR, Brgy. Himama-ug, Taganaan, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r17","title":"Construction of Brgy. San Juan FMR, Brgy. San Juan, San Luis, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r13","title":"Construction of Brgy. Sta. Catalina FMR, Brgy. Sta. Catalina, San Luis, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Delta","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r18","title":"Construction of Purok 3, Brgy. Calican FMR, Brgy. Calican, Piñan, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r3","title":"Construction of Brgy. Lagundi - Brgy. San Andres Sitio Peña FMR, Brgy. Lagundi and Brgy. San Andres, Catbalogan City, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r17","title":"Construction of Brgy. Gayong FMR, Cordon, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Balikatan DD div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r6","title":"Construction of Purok 3 Brgy. Camboayon FMR, Brgy. Camboayon, Gigaquit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":14.1,"system":"Baoy","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r16","title":"Construction of Brgy. Osmeña FMR, Brgy. Osmeña, Basista, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r14","title":"Construction of Brgy. 49-B Raraburan FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":0.0,"system":"Bonga Pump 2","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r11","title":"Construction of Brgy. Rizal FMR, Brgy. Rizal, Pilar, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r8","title":"Concreting of Brgy. Talaibon FMR, Brgy. Talaibon, Ibaan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r5","title":"Construction of Bagsang-Cabaywa-Parigoan Galutan FMR, Brgy. Balud and Brgy. Zone 3, San Roque, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r9","title":"Concreting of Sitio Malambago, Brgy. Maluko FMR, Brgy. Maluko, Manolo Fortich, Bukidnon","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r6","title":"Concreting of Sitio Bungol, Brgy. Tacay FMR, Brgy. Tacay, Buenavista, Guimaras","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r4","title":"Construction of Cabaywa-Cabuntoran-Malaguinara FMR, Brgy. Zone 3, San Roque, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r9","title":"Construction of Brgy. Mayang FMR, Brgy. Mayang, La Paz, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":5.2,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r4","title":"Improvement of Sagpat-God-ang-Manawal FMR, Brgy. Sagpat to Brgy. Lubo, Kibungan, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r11","title":"Construction of Sitio Baslay, Brgy. Talacdan FMR, Brgy. Talacdan, Cauayan, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r5","title":"Construction of Sitio Santiago to Sitio Gumpay, Brgy. Gabon to Brgy. Laon FMR, Brgy. Gabon, Abucay, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r16","title":"Construction of Pulong Palazan to Vizal Sto. Niño FMR, Pulong Palazan, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":58.3,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r17","title":"Construction of Brgy. Nabago FMR Phase 2, Brgy. Nabago, Surigao City, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r14","title":"Concreting of Brgy. Guis-Guis Talon FMR, Brgy. Guis-Guis Talon, Sariaya, Quezon","region":"REGION IVA - CALABARZON","distanceM":47.5,"system":"Hanagdong","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r17","title":"Construction of Brgy. Tampac FMR, Brgy. Tampac, Aguilar, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r7","title":"Concreting of Brgy. Napurog FMR, Brgy. Napurog, Tudela, Misamis Occidental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r14","title":"Construction of Brgy. Alcadesma to Brgy. Rosacara FMR, Brgy. Alcadesma, Bansud, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":0.0,"system":"Bansud","fgisRegion":"Region IV-B","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r5","title":"Construction of Sitio Water Lily, Brgy. Maraykit FMR, Brgy. Maraykit, San Juan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r9","title":"Construction of Purok 5, Brgy. Balubal FMR, Cagayan de Oro City","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r9","title":"Construction of Purok Angeles to Purok Mainuswagon, Brgy. Bambad FMR, Brgy. Bambad, Isulan, Sultan Kudarat","region":"REGION XII - SOCCSKSARGEN","distanceM":89.5,"system":"Ala","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r5","title":"Construction of Zamboanga - Cavit FMR, Brgy. Zamboanga and Brgy. Cavit, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":562.0,"system":"Bonga Pump 3","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r2","title":"Construction of Palosapis Road, Brgy. San Juan FMR, Brgy. San Juan, Botolan, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":410.6,"system":"Bucao","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r16","title":"Construction of Brgy. Imelda to Brgy. Lico FMR, Brgy. Imelda and Brgy. Lico, Naval, Biliran","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r12","title":"Concreting of Bag-ao Village to Brgy. Santiago FMR, Brgy. Santiago, Loreto, Dinagat Islands","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r14","title":"Construction of FMR, Brgy. Bakal II, Talavera to Brgy. Casulucan, Sto. Domingo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r14","title":"Construction of Purok 4 Brgy. Cabugo to Togonon FMR, Brgy. Cabugo, Claver, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r14","title":"Construction of Purok 5 to 7, Brgy. Palacian FMR, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":2896.7,"system":"Dabubu","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r3","title":"Construction of Brgy. 40 Balatong FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":451.5,"system":"Bonga Pump 2","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r5","title":"Construction of Brgy. Hanopol FMR, Brgy. Hanopol, Caramoan, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r15","title":"Construction of Brgy. Quezon FMR, San Isidro, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r11","title":"Construction of Brgy. Tampog FMR, Brgy. Tampog, Bayambang, Pangasinan","region":"REGION I - ILOCOS","distanceM":3275.5,"system":"CAM RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r4","title":"Construction of Brgy. Ilog to Brgy. Pilaway to Brgy. Agos-Agos FMR, Brgy. Ilog to Brgy. Pilaway to Brgy. Agos-Agos, Infanta, Quezon","region":"REGION IVA - CALABARZON","distanceM":3.8,"system":"Agos","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r5","title":"Concreting of Purok Namnama, Brgy. Poblacion FMR Phase II, Brgy. Poblacion, Tantangan, South Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r5","title":"Construction of Purok Maabi-abihon - Purok Mabinuligon Brgy. Bagontapay FMR, Brgy. Bagontapay, M'lang, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":454.0,"system":"Kabacan","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r7","title":"Construction of Sitio Santiago to Sitio Gumpay, Brgy. Gabon to Brgy. Laon FMR, Brgy. Gabon, Abucay, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r13","title":"Concreting of Brgy. La Torre FMR, Brgy. La Torre, Talavera, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":515.2,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r9","title":"Construction of Brgy. Taguite FMR, Brgy. Taguite, Babatngon, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r6","title":"Construction of Brgy. Batang Batang to Brgy. Balibago II FMR, Brgy. Batang Batang, Tarlac City, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":4.4,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r5","title":"Construction of Brgy. Cutcut II FMR, Brgy. Cutcut II, Capas, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":4.4,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r15","title":"Construction of Brgy. Triala FMR, Brgy. Triala, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.8,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r17","title":"Construction of Baba Street Brgy. San Miguel FMR, Brgy. San Miguel, Botolan, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Bucao","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r2","title":"Concreting of Brgy. Calumpit FMR, Brgy. Calumpit, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r6","title":"Construction of Sitio Bustamante, Brgy. Tagbakin FMR, Brgy. Tagbakin, Tiaong, Quezon","region":"REGION IVA - CALABARZON","distanceM":988.5,"system":"Lagnas","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r12","title":"Construction of Concepcion to Pantoc FMR, Brgy. Concepcion to Brgy. Pantoc, Zaragoza, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Bungabon Extension","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r5","title":"Construction of Brgy. Pinagdanlayan to Brgy. Manggahan FMR, Brgy. Pinagdanlayan to Brgy. Manggahan, Dolores, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r19","title":"Concreting of Brgy. Bactas-Tinabyonan-Guinabucan -Agsuwao FMR, Catmon, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":0.0,"system":"Dingras","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r13","title":"Construction of Brgy. Mandasig FMR, Brgy. Mandasig, Candaba going to","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Delta","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r15","title":"Construction of Sitio Nangka Plain, Brgy. La Paz FMR, Brgy. La Paz, Zamboanga City","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r16","title":"Construction of Brgy. San Miguel FMR, Brgy. San Miguel, Mutia, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r10","title":"Construction of Brgy. Naugsol - Brgy. San Isidro FMR, Subic, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r11","title":"Concreting of Brgy. Olo-olo FMR, Brgy. Olo-olo, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r5","title":"Construction of Brgy. Bamban FMR, Brgy. Bamban, Masinloc, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r14","title":"Construction of Brgy. Libnaoan-Brgy. Lagandit FMR, Brgy. Libnaoan and Brgy. Lagandit, Piddig, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r18","title":"Concreting of Brgy. Sta Ana FMR, Brgy. Sta Ana, Mabini, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r6","title":"Construction of Brgy. Don Luis to Brgy. Salaban FMR, Brgy. Don Luis, San Jose, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r4","title":"Construction of Brgy. Sinulatan 1st FMR, Brgy. Sinulatan 1st, Camiling, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"CAM RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r2","title":"Construction of Brgy. Buneg to Brgy. Fugu FMR, Brgy. Buneg and Brgy. Fugu, Echague, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r11","title":"Construction of Brgy. Kamuning FMR, Brgy. Kamuning, Puerto Princesa, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r13","title":"Construction of Brgy. Bacnono FMR, Brgy. Bacnono, Bayambang, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r2","title":"Construction of Brgy. Iraray FMR, Brgy. Iraray, Sofronio Española, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r6","title":"Construction of Brgy. Bahaybahay to Brgy. Poblacion II FMR, Brgy. Bahaybahay and Brgy. Poblacion II, Sikatuna, Bohol","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r4","title":"Construction of Brgy. Cubcub FMR, Brgy. Cubcub, Capas, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":2257.2,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r3","title":"Construction of Brgy. Bago Chiquito to Brgy. Candual FMR, Brgy. Bago Chiquito and Brgy. Candual, Panay, Capiz","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r8","title":"Construction of Sitio Old Maluya, Brgy. Cupang Proper FMR, Brgy. Cupang Proper, Balanga City, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r5","title":"Construction of Kalingohan to Purok-3 Sitio Cambinliw Brgy. Santiago FMR Phase II, Brgy. Santiago, Loreto, Dinagat Islands","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r8","title":"Construction of Brgy. Tablon (Sitio Manila) FMR, Cagayan de Oro City","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r10","title":"Construction of Brgy. Naglabrahan FMR, Brgy. Naglabrahan, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r12","title":"Construction of Sitio Ilog-a-metung, Brgy. San Isidro FMR, San Luis, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r17","title":"Construction of Brgy. Bayawas FMR, Brgy. Bayawas, Pilar, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r9","title":"Concreting of Sitio Calangatnan, Brgy. Digdigon FMR, Brgy. Digdigon, Goa, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r14","title":"Construction of Brgy. Capilian to Brgy. Burubud-an FMR, Brgy. Capilian and Brgy. Burubud-an, Abuyog, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r18","title":"Construction of Brgy. San Nicolas FMR, Brgy. San Nicolas, San Luis, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r11","title":"Concreting of Brgy. Alupidian - Brgy. Jamog FMR, Brgy. Alupidian and Brgy. Jamog, Tigbauan, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r15","title":"Construction of Brgy. Sta. Maria to Baringkog Falls FMR, Sta. Maria, Baras, Catanduanes","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r12","title":"Concreting of Brgy. Orange - Brgy. Old Maguisa FMR, Brgy. San Ramon and Brgy. San Isidro, Donsol, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r3","title":"Concreting of Brgy. Bagacay FMR Phase II, Brgy. Bagacay, Lapinig, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r2","title":"Construction of Brgy. Dansalan FMR, Brgy. Dansalan, Sapad, Lanao del Norte","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r13","title":"Construction of Brgy. Osmeña FMR, Brgy. Osmeña, Lope de Vega, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r9","title":"Construction of Purok Agojo, Brgy. Buenlag FMR, Brgy. Buenlag, Gerona, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":3067.7,"system":"Tarlac Ground Water IS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r19","title":"Construction of Brgy. Cabatanga to Agbalogo FMR, Brgy. Cabatanga and Brgy. Agbalogo, Makato, Aklan","region":"REGION VI - WESTERN VISAYAS","distanceM":72.0,"system":"Aklan West","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r8","title":"Construction of Brgy. Manglicmot FMR, Brgy. Manglicmot, San Felipe, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r18","title":"Construction of Brgy. Silangan Calutan FMR, Agdangan, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r17","title":"Construction of Brgy. Calican FMR, Brgy. Calican, Pinan, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r4","title":"Concreting of Sitio Maycuaway, Maysalay to Sitio Hipnagi, Scout Fuentebella FMR, Brgy. Scount Fuentebella, Goa, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r15","title":"Construction of Brgy. Bangco FMR, Brgy. Bangco, Cavinti, Laguna","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r14","title":"Construction of Brgy. San Rafael FMR, Brgy. San Rafael, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":23.6,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r17","title":"Construction of Brgy. Ramos East FMR, San Isidro, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r4","title":"Construction of Buenavista-Manggahan Buenavista II and Buenavista III FMR, General Trias, Cavite","region":"REGION IVA - CALABARZON","distanceM":0.0,"system":"Butas Lawang bato","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r11","title":"Construction of Brgy. Besigan FMR, Brgy. Besigan, Cagayan de Oro City","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r12","title":"Construction of Sitio Gatol - Sitio Agong, Brgy. San Roque FMR, Bulalacao, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r7","title":"Construction of Brgy. Lamfugon to Sitio Tabayung FMR Phase II, Brgy. Lamfugon, Lake Sebu, South Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r6","title":"Construction of Brgy. San Isidro FMR, Brgy. San Isidro, Tagkawayan, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r13","title":"Concreting of Sitio Umarca, Brgy. Rizal FMR, Brgy. Rizal, Pontevedra, Capiz","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r18","title":"Construction of Brgy. Bug-ang FMR, Brgy. Bug-ang, Toboso, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r5","title":"Concreting of Brgy. Pongon - Brgy. Villa Imelda FMR, Brgy. Pongon and Brgy. Villa Imelda, Mac Arthur, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":154.5,"system":"Balire South","fgisRegion":"Region VIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r4","title":"Construction of Sitio Bunga to Sitio Bolinao, Brgy. Salian FMR, Brgy. Salian, Abucay, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r19","title":"Construction of Maligaya-Rang Ayan FMR Phase II, Mallig, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Mallig","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r5","title":"Concreting of Brgy. Sto. Domingo - Brgy. Salvacion FMR, Alicia, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":240.8,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r2","title":"Construction of Sitio Maray-as, Brgy. Bonawon FMR, Brgy. Bonawon, Siaton, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r4","title":"Construction of Brgy. Banuar FMR, Brgy. Banuar, Cabarroguis, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":1511.0,"system":"Addalam","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r3","title":"Concreting of Brgy. Bacong - Brgy. Bongol San Miguel FMR, Brgy. Bacong and Brgy. San Miguel, Guimbal, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r12","title":"Construction of Nalvo - Pragata (Baywalk) FMR, Pasuquin, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":763.5,"system":"Sulvec","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r3","title":"Construction of Alimang, Brgy. Poblacion FMR, Brgy. Poblacion, Sablan, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r3","title":"Construction of Brgy. Caipilan FMR, Brgy. Caipilan, Siquijor, Siquijor","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r15","title":"Construction of Brgy. Langa FMR Phase 2, Brgy. Langa, Basud, Camarines Norte","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r14","title":"Construction of Brgy. Veronica FMR, Brgy. Veronica, Lopez, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r6","title":"Construction of Brgy. Flores-Brgy. Esperanza FMR, Brgy. Flores and Brgy. Esperanza, Umingan, Pangasinan","region":"REGION I - ILOCOS","distanceM":997.6,"system":"Dipalo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r6","title":"Construction of Sitio Pantay-Kawasan FMR, Brgy. Kawasan, Panamao, Sulu","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r17","title":"Construction of Brgy. Paludpod FMR, Brgy. Paludpod, Talavera, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Murcon Creek","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r2","title":"Construction of Brgy. Dulong Ilog FMR, Brgy. Dulong Ilog, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":4.8,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r6","title":"Concreting of Brgy. Pañatan - Brgy. Dacdacanan FMR, Brgy. Pañatan and Brgy. Dacdacanan, San Joaquin, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r8","title":"Construction of Sitio Guiringan FMR, Sta. Maria, Piddig, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":0.0,"system":"Cura","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r13","title":"Construction of Camoning to Magatos FMR, Asuncion, Davao del Norte","region":"REGION XI - DAVAO","distanceM":21.4,"system":"Libuganon Left","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r15","title":"Construction of Purok 6 Brgy. Gen. Lim FMR, Brgy. Gen. Lim, Orion, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r16","title":"Construction of Brgy. Gusa FMR, Brgy. Gusa, Cagayan de Oro City","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r3","title":"Concreting of Brgy. San Roque FMR, Brgy. San Roque, Gapan City, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r16","title":"Construction of Sinuknipan II to Sinagawsawan (Peñafrancia) FMR, Brgy. Sinuknipan II and Brgy. Sinagawsawan (Peñafrancia), Del Gallego, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r5","title":"Construction of P7 Brgy. Balligui FMR, Brgy. Balligui, Madella, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r16","title":"Construction of Salvador-Divisoria FMR, Brgy. Salvador-Divisoria, Santiago City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r7","title":"Construction of Brgy. Dawog FMR, Brgy. Dawog, Miagao, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r7","title":"Construction of Catalotoan FMR Phase II, Brgy. Catalotoan, Sagnay, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r6","title":"Concreting of Sitio Calanawan - Sitio Maybunga, Brgy. Hiwacloy FMR, Brgy. Hiwacloy, Goa, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r19","title":"Construction of Brgy. San Jacinto FMR, Brgy. San Jacinto, Victoria, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":1079.7,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r8","title":"Construction of Brgy. Itlugan FMR, Brgy. Itlugan, Rosario, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r14","title":"Construction of Sitio Malabnig, Brgy. Balatbat FMR, Brgy. Balatbat, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r10","title":"Opening and Concreting of Sitio Malabnig, Brgy. Balatbat FMR, Brgy. Balatbat, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r2","title":"Construction of Brgy. Capagao FMR, Brgy. Capagao, Panitan, Capiz","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r4","title":"Construction of Sitio Tambao, Brgy. JC Payumo FMR, Brgy. JC Payumo, Dinalupihan, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":239.1,"system":"Colo","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r6","title":"Construction of Brgy. Burot FMR, Brgy. Burot, Tarlac City, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r17","title":"Construction of Brgy. Navaling FMR, Brgy. Navaling, Magalang, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r4","title":"Construction of Brgy. San Agustin FMR, Brgy. San Agustin, Sto. Domingo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r14","title":"Construction of Brgy. Vizal Sto. Niño to Vizal Sto. Cristo FMR, Brgy. Vizal Sto. Niño, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r10","title":"Concreting of Brgy. Bantugan - Brgy. Lidong, Brgy. Bantugan FMR, Presentacion, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r16","title":"Construction of Capayahan-Marga-San Pablo Road FMR, Brgy. Capayahan, Tubod, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r5","title":"Construction of Brgy. Sta. Rosa FMR, Brgy. Sta. Rosa, Murcia, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r16","title":"Construction of Brgy. Pulang-lupa FMR, Brgy. Pulang-lupa, M'lang, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":1294.7,"system":"Mlang","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r2","title":"Construction of Purok 3/Purok 5 Boundary Road, Brgy. Dalipe FMR, Brgy. Dalipe, M'lang, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":1294.7,"system":"Mlang","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r9","title":"Construction of Brgy. Sambaludan to Brgy. Botong FMR, Brgy. Sambaludan and Brgy. Botong, Oton, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":6.4,"system":"Sibalom","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r16","title":"Construction of Brgy. Irukan to Brgy. Calayaan to Brgy. Poblacion III FMR, Brgy. Irukan to Brgy. Calayaan to Brgy. Poblacion III, Sta. Teresita, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r13","title":"Construction of Brgy. Panubigan FMR, Brgy. Panubigan, Canlaon City, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r8","title":"Construction of Brgy. Estrada FMR, Capas, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Tasmo RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r16","title":"Concreting of Brgy. Inang FMR, Brgy. Inang, Pilar, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r11","title":"Construction of Purok 5 Brgy. Panatao FMR, Brgy. Panatao, Claver, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r12","title":"Construction of Sitio Kapoc to Tabunan, Brgy. Cadunan FMR, Mabini, Davao de Oro","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r17","title":"Construction of Brgy. Palapas- Brgy. Tibabo FMR, Pio Duran, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r12","title":"Concreting of Brgy. Bambanaba FMR, Brgy. Bambanaba, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.1,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r14","title":"Construction of Sitio Warang to Cagurusong, Brgy. San Miguel FMR, San Miguel, Baras, Catanduanes","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r12","title":"Construction of Brgy. Sucad FMR, Brgy. Sucad, Apalit, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga Delta","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r10","title":"Concreting of Canabuan - Brgy. Barusong FMR, Brgy. Canabuan and Brgy. Barosong, Tigbauan, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":1593.9,"system":"Sibalom","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r6","title":"Concreting of Purok 1 - Purok 3, Brgy. Manapao - Purok 1-b, Brgy. Casili FMR, Brgy. Manapao and Brgy. Casili, Gubat, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r14","title":"Construction of Brgy. Barcolan to Brgy. Mabini FMR, Gamu, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 3 pump 3","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r8","title":"Construction of Bautista Street Road, Brgy. Batia FMR, Brgy. Batia, Bocaue, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS bulacan","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r10","title":"Construction of Brgy. Lacag FMR, Brgy. Lacag, Daraga, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r9","title":"Construction of Brgy. Bacuyong, Piñan – Brgy. Lingasad FMR, Polanco, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r9","title":"Construction of Tagatog to Bautista Road, Brgy. Tambubong FMR, Brgy. Tambubong, Bocaue, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS bulacan","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r6","title":"Construction of Brgy. Cabaruan FMR, Brgy. Cabaruan, Madella, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r3","title":"Construction of Brgy. Sibula to Brgy. Dampalan FMR, Brgy. Sibula, Lopez Jaena, Misamis Occidental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r15","title":"Construction of Brgy. Talusan FMR, Brgy. Talusan, Dumangas, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":621.3,"system":"Jalaur Proper","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r11","title":"Construction of Sitio Alatalatin 2 Brgy. San Francisco B FMR, Brgy. San Francisco B, Lopez, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r4","title":"Construction of Tactac-Atbu FMR, Sta. Fe, Nueva Vizcaya","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r20","title":"Construction of Brgy. Macañao to Brgy. Luyao FMR Phase II, Luna, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r10","title":"Construction of Labiano St., Brgy. Bagumbayan FMR, Brgy. Bagumbayan, Llanera, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":144.9,"system":"Pampanga River","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r9","title":"Construction of Brgy. San Fabian FMR, Brgy. San Fabian, Sto. Domingo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.1,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r19","title":"Construction of Alianza to San Joaquin FMR, Brgy. Alianza, San Fernando, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r15","title":"Concreting of Brgy. Balsik going to Iron Farm FMR, Brgy. Balsik, Hermosa, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":729.2,"system":"Colo","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r11","title":"Construction of Purok 6, Brgy. San Antonio FMR, Labo, Brgy. San Antonio, Camarines Norte","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r11","title":"Concreting of Hacienda, Brgy. Pandacaqui FMR, Brgy. Pandacaqui, Mexico, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r10","title":"Construction of Brgy. 55-B Salet-Bulangon FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":0.0,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r5","title":"Construction of Sitio Diawe, Brgy. Sta. Victoria to Sitio San Juan, Brgy. Diodol FMR, Brgy. Sta. Victoria and Brgy. Diodol, Aglipay, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r4","title":"Construction of Purok 5, Brgy. Dirita FMR, Purok 5, Brgy. Dirita, Iba, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r4","title":"Concreting of Purok 3 - Purok 5, Brgy. Casili FMR, Brgy. Casili, Gubat, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r4","title":"Construction of Brgy. Logucan FMR, Brgy. Logucan, Maria, Siquijor","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r3","title":"Construction of Brgy. Barit, Candaba to Brgy. San Juan, San Luis FMR, Brgy. Barit, Candaba and Brgy. San Juan, San Luis, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"AMRIS Pampanga","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r17","title":"Construction of Brgy. Tagjaguimit FMR, Brgy. Tagjaguimit, Naga City, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r9","title":"Construction of Brgy. Talahiban 1 FMR, Brgy. Talahiban 1, San Juan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r3","title":"Construction of Purok 2 - Purok 3 - Purok 4, Brgy. New Consolacion FMR Phase I, Brgy. New Consolacion, M'lang, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":3148.2,"system":"Mlang","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r15","title":"Construction of Brgy. Manupal FMR, Brgy. Manupal, Matalam, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r14","title":"Concreting of Brgy. Mayon FMR, Brgy. Mayon, Castilla, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r5","title":"Construction of Brgy. Villa Cardenas - Brgy. Balagbag FMR, Saguday & Diffun FMR, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":540.0,"system":"Balikatan DD div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r10","title":"Construction of Brgy. Nantawakan FMR, Brgy. Nantawakan, Kasibu, Nueva Vizcaya","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r17","title":"Construction of Sitio Dalandan II, Brgy. A. Bonifacio FMR, Brgy. A. Bonifacio, Gloria, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r2","title":"Construction of Brgy. Kanlurang Calutan FMR, Agdangan, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r10","title":"Construction of Brgy. San Andres FMR, Brgy. San Andres, Catbalogan, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r3","title":"Construction of Brgy. Bato FMR, Brgy. Bato, Mabinay, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r15","title":"Construction of Brgy. Mapaniqui to Brgy. Barangca FMR, Brgy. Mapaniqui, Candaba, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r18","title":"Construction of Brgy. Gumot to Brgy. Bigbiga FMR, Brgy. Gumot and Brgy. Bigbiga, San Fabian, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r19","title":"Construction of Brgy. San Miguel to Brgy. Caliclic FMR, Brgy. San Miguel, IGACOS, Davao del Norte","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r7","title":"Construction of Brgy. San Juan FMR (Eda and Mauemel Section), San Juan, Pasuquin, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":848.1,"system":"Sulvec","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r14","title":"Construction of Purok-4, Santa Cruz to Purok-3, Brgy. Proper FMR, Butuan City","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r13","title":"Concreting of Purok 1 Brgy. Buenavista FMR, Brgy. Buenavista, Mexico, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r6","title":"Construction of Sitio Balukingking, Brgy. Magsaysay FMR, Brgy. Magsaysay, Naguilian, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r13","title":"Construction of Brgy. 62-B Navotas South FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":299.5,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r18","title":"Construction of Brgy. Sinulatan First FMR, Brgy. Sinulatan First, Camiling, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":1.7,"system":"CAM RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r13","title":"Construction of Brgy. Anibawan FMR, Brgy. Anibawan, Burdeos, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r11","title":"Construction of Brgy. Amoguis to Dahat FMR, Brgy. Amoguis-Dahat, Lagonoy, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r12","title":"Construction of Brgy. Asia FMR, Brgy. Asia, Hinoba-an, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r3","title":"Construction of Brgy. Balagunan FMR, Siocon, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r12","title":"Construction of Brgy. San Miguel FMR, Brgy. San Miguel, Lopez, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r10","title":"Construction of Brgy. Tutug-an to Sitio Nasunogan, Brgy. Tutug-an FMR, Brgy. Tutug-an, Barugo, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":63.1,"system":"Pongso","fgisRegion":"Region VIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r2","title":"Concreting of Brgy. Mampaitan FMR, Brgy. Mampaitan, Mogpog, Marinduque","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r13","title":"Construction of FMR, Brgy. Simimbaan to Brgy. Nagcuralan, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r4","title":"Concreting of Brgy. Lumbang - Brgy. Makiri FMR Phse III, Brgy. Lumbang, Isabela City, Basilan","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r9","title":"Concreting of Brgy. Tobrehon to Brgy. JMA FMR, San Miguel, Catanduanes","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r15","title":"Concreting of Brgy. San Jose FMR, Brgy. San Jose, Tiaong, Quezon","region":"REGION IVA - CALABARZON","distanceM":718.4,"system":"Lagnas","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r7","title":"Construction of Purok Bulad, Brgy. Mabini to Purok Irigasyon, Brgy. Pacol FMR, Brgy. Mabini and Brgy. Pacol, Valladolid, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":0.0,"system":"Bago","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r17","title":"Construction of Taiben, Brgy. Parang FMR, Brgy. Parang, Bagac, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r6","title":"Concreting of Purok 5, Labinay FMR, Brgy. Labinay, Ozamiz City, Misamis Occidental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r10","title":"Construction of Sitio Pidpid to Sitio Kaburihan, Brgy. San Agustin FMR, Brgy. San Agustin, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r18","title":"Construction of Sitio Alapat , Brgy. Banawang FMR, Brgy. Banawang, Bagac, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r19","title":"Construction of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Maigo, Lanao del Norte","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r14","title":"Construction of Brgy. Buenlag FMR, Brgy. Buenlag, Mangatarem, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r5","title":"Construction of Brgy. Tampac I FMR, Brgy. Tampac I, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r3","title":"Concreting of Brgy. Ilat North FMR, Brgy. Ilat North, San Pascual, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r3","title":"Construction of Sitio Piloto Brgy. Mambog FMR, Brgy. Mambog, Botolan, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Bucao","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r15","title":"Construction of Sitio Samborio, Brgy. Buot FMR, Brgy. Buot, Cebu City, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r6","title":"Construction of Brgy. Ilat North FMR, San Pascual, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r6","title":"Construction of Bagong Pag-asa FMR, Brgy. Bagong Pag-asa, San Miguel, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r14","title":"Construction of Brgy. Abaca to Brgy. Braulan FMR, Brgy. Abaca and Brgy. Braulan, San Enrique, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r5","title":"Opening and Concreting of Brgy. Santa Veronica FMR, Brgy. Santa Veronica, San Pablo City, Laguna","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r14","title":"Construction of Brgy. Catwiran I FMR, Brgy. Catwiran I, Baco, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":1060.4,"system":"Baco Bacayao","fgisRegion":"Region IV-B","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r12","title":"Construction of Brgy. Malabobo FMR, Brgy. Malabobo, Mangatarem, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r9","title":"Construction of Brgy. Buenlag FMR, Calasiao, Pangasinan","region":"REGION I - ILOCOS","distanceM":1199.3,"system":"Sinocalan","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r7","title":"Concreting of Brgy. San Antonio FMR, Brgy. San Antonio, Ramon, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r11","title":"Construction of Sitio Kanyakan, Brgy. Matictic FMR, Brgy. Matictic, Norzagaray, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r15","title":"Construction of Sitio Palunatin, Brgy. Sabatan FMR, Brgy. Sabatan, Orion, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r7","title":"Construction of Buenavista to Sitio Kalubihan FMR, Brgy. Buenavista, Carcar City, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r5","title":"Construction of Sitio Iningles, Brgy. Alion to Sitio Pinagpala, Brgy. Townsite, Mariveles, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r2","title":"Construction of Brgy. Simanu Norte FMR, Brgy. Simanu Norte, San Pablo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r13","title":"Concreting of Brgy. Tumbaga 2 - Brgy. Canda FMR, Brgy. Tumbaga 2 and Brgy. Canda, Sariaya, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r18","title":"Construction of Brgy. Ramos West-Ramos East FMR, San Isidro, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r2","title":"Construction of Brgy. Estrella FMR, Brgy. Estrella, Rizal, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga River","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r10","title":"Construction of Sitio Cabonga-an Brgy. Himama-ug FMR, Brgy. Himama-ug, Taganaan, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r8","title":"Concreting of Brgy. Rawis to Brgy. Cantaguic FMR, Brgy. Rawis and Brgy. Cantaguic, San Jorge, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r4","title":"Construction of Sitio Malipa, Brgy. Nagbayan FMR Phase 2, Brgy. Nagbayan, Castillejos, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r16","title":"Construction of Brgy. Tagumpay FMR, Brgy. Tagumpay, Real, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r6","title":"Construction of Brgy. Alangilan - Brgy. Tuy-a FMR, Brgy. Alangilan and Brgy. Tuy-a, Abuyog, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r8","title":"Concreting of Brgy. Telegrafo FMR, Brgy. Telegrafo, San Jose, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r8","title":"Construction of Brgy. San Miguel FMR, Brgy. San Miguel, La Carlota City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":8365.7,"system":"Bago","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r4","title":"Construction of Sitio Crossing to Sitio Proper, Brgy. Agdahon FMR, Brgy. Agdahon, Cuartero, Capiz","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r16","title":"Concreting of Sitio Ata-ata, Brgy. San Antonio - Brgy. Calabnugan FMR, Brgy. San Antonio and Brgy. Calabnugan, Sibulan, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r13","title":"Construction of Brgy. Naga FMR, Brgy. Naga, Laak, Davao de Oro","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r3","title":"Construction of Tinangis FMR, Brgy. Tinangis, Pili, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r9","title":"Concreting of Purok 6- Purok 7 FMR, Brgy. Bonbon, Butuan City","region":"REGION XIII - CARAGA","distanceM":2239.4,"system":"Lower Agusan River","fgisRegion":"Region XIII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r9","title":"Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Jones, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":2617.5,"system":"Addalam","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r8","title":"Construction of Brgy. Ogob - Brgy. Diaro FMR, Brgy. Ogob and Brgy. Diaro, Malinao, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r7","title":"Construction of Brgy. Nungnungan II to Brgy. Nungnungan I FMR, Brgy. Nungnungan II to Brgy. Nungnungan I, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r19","title":"Construction og Salagusog FMR, Brgy. Salagusog, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":949.7,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r10","title":"Construction of Talbak 1, Brgy. Encanto FMR, Brgy. Encanto, Angat, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r7","title":"Construction of Brgy. Masin FMR, Brgy. Masin, Tayabas City, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r3","title":"Construction of Brgy. Maasin to Brgy. Valencia FMR, Brgy. Maasin and Brgy. Valencia, Tayabas City, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r7","title":"Construction of Sitio Dalayap to Sitio Ibujan, Brgy. Disulap FMR, Brgy. Disulap, San Mariano, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r4","title":"Construction of Brgy. San Jose FMR, Brgy. San Jose, Guinayangan, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r5","title":"Construction of Caparispisan FMR, Brgy. Caparispisan, Pagudpud, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r15","title":"Construction of Brgy. Santa Maria FMR, Brgy. Santa Maria, Laurel, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r9","title":"Construction of Brgy. 54-A Lagui-Sail FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":64.4,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r11","title":"Construction of Brgy. Sta. Isabel to Brgy. Bagong Sikat FMR, Brgy. Sta. Isabel, Cabiao, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":1947.9,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r16","title":"Concreting of Purok 5, Brgy. Dangcol FMR, Brgy. Dangcol, Balanga City, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r13","title":"Construction of Brgy. Narvaez FMR, Brgy. Narvaez, General Emilio Aguinaldo, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r2","title":"Construction of Sitio Cagga, Brgy. Tagumpay FMR, Brgy. Tagumpay, Real, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r17","title":"Construction of Brgy. Tablon FMR, Brgy. Tablon, Cagaya de Oro City","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r11","title":"Construction of Calog Norte FMR, Brgy. Calog Norte, Abulug, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"West Apayao Abulug","fgisRegion":"CAR","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r11","title":"Concreting of Brgy. Montag Phase II FMR, Brgy. Montag, Basilisa, Dinagat Islands","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r12","title":"Construction/Improvement of Brgy. Tulay FMR, Brgy. Tulay, Ibaan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r5","title":"Construction of Brgy. Dapdap FMR, Brgy. Dapdap, Tayabas City, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r8","title":"Construction of Brgy. Cansilayan FMR, Brgy. Cansilayan, Tigbauan, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r10","title":"Construction of Brgy. Balaybuaya FMR, Brgy. Balaybuaya, Bayambang, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r17","title":"Construction of Brgy. Granada FMR, Brgy. Granada, Bacolod City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r15","title":"Construction of Brgy. Azagra to Brgy. San Miguel FMR, Brgy. Azagra and Brgy. San Miguel, Tanjay City, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r14","title":"Construction of Brgy. Manambong Sur FMR, Brgy. Manambong Sur, Bayambang, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r9","title":"Construction of Sitio Ogpoy - Sitio Ariada, Brgy. Alangan FMR, Brgy. Alangan, Limay, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r19","title":"Concreting of Sitio Linawan, Brgy. Dulong Bayan FMR, Brgy. Dulong Bayan, San Jose Del Monte City, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r15","title":"Construction of Sowe-Cabayo-Keninchingan FMR, Brgy. Poblacion, Atok, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r2","title":"Construction of Brgy. Cambuja to Brgy. Bubucal FMR, Brgy. Cambuja, Brgy. Bubucal, Santa Maria, Laguna","region":"REGION IVA - CALABARZON","distanceM":0.0,"system":"Dambo","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r12","title":"Construction of Liwan Norte - San Antonio FMR Phase I, Enrile, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":14830.8,"system":"Lower Chico","fgisRegion":"CAR","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r11","title":"Concreting of Brgy. Bugtong - Brgy. Bayo FMR, Brgy. Bugtong and Brgy. Bayo, Calbayog City, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r11","title":"Construction of Sitio Tugas, Brgy. Agpay FMR, Brgy. Agpay, Guinobatan, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r16","title":"Construction of Sitio Upper to Sitio Tay-ong, Brgy. Buot FMR, Brgy. Buot, Cebu City, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r10","title":"Construction of Sitio Puso-Puso, Brgy. Cabog-Cabog FMR, Brgy. Cabog-Cabog, Balanga City, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r9","title":"Concreting of Brgy. Kimamon FMR, Brgy. Kimamon, Santo Tomas, Davao del Norte","region":"REGION XI - DAVAO","distanceM":311.4,"system":"Libuganon","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r14","title":"Concreting of Brgy. Pook ni Banal FMR, Brgy. Pook ni Banal, San Pascual, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r3","title":"Concreting of Sitio Takutan, Brgy. Dalusag FMR, Brgy. Dalusag, General Emilio Aguinaldo, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p683:r6","title":"Construction of Maymayan Buri, Brgy. Inhobol FMR, Brgy. Inhobol, Masinloc, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r5","title":"Construction of Sitio Rango, Brgy. Tubburan FMR, Brgy. Tubburan, Bacarra, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":6.9,"system":"NMC","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r5","title":"Construction of Sitio Carad, Brgy. Tubburan FMR, Brgy. Tubburan, Bacarra, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":7.1,"system":"NMC","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r4","title":"Construction of Sitio Ibon, Brgy. Carmundo FMR to Sitio Centro Brgy. Tawas, Bongabong, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r11","title":"Construction of Brgy. Ibag to Brgy. Sta. Rosa FMR, Brgy. Ibag and Brgy. Sta. Rosa, Barugo, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r3","title":"Construction of Rizal - Villa Marcos to Salvador-Divisoria FMR, Brgy. Rizal-Villa Marcos to Brgy. Salvador-Divisoria, Santiago City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r15","title":"Construction of Brgy. Abkir FMR, Brgy. Abkir, Vintar, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":46.4,"system":"NMC","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r9","title":"Concreting of Brgy. Patul- Brgy. Villa Gonzaga FMR Phase II, Brgy. Patul and Brgy. Villa Gonzaga, Santiago City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r2","title":"Construction of Brgy. Liwayway FMR, Brgy. Liwayway, Diffun, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":3842.4,"system":"Balikatan DD div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r13","title":"Construction of Brgy. Anibong FMR, Brgy. Anibong, Pagsanjan, Laguna","region":"REGION IVA - CALABARZON","distanceM":2614.8,"system":"Balanac","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r13","title":"Construction of Brgy. Sayawan to Brgy. Dumalaguing to Brgy. Guiheean FMR, Impasugong, Bukidnon","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r10","title":"Construction of Brgy. Manlucahoc FMR, Brgy. Manlucahoc, Sipalay City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r6","title":"Opening and Concreting of Brgy. Dolores FMR, Brgy. Dolores, San Pablo City, Laguna","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r2","title":"Construction of Brgy. Estanza FMR Phase III, Brgy. Estanza, Lingayen, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r11","title":"Construction of Sitio Kilbog Proper, Brgy. Baluan FMR Phase I, Brgy. Baluan, Palimbang, Sultan Kudarat","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r11","title":"Construction of Brgy. Calubcub II FMR, Brgy. Calubcub II, San Juan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r13","title":"Construction of Brgy. Tilha-ong FMR, Brgy. Tilha-ong, Consolacion, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r5","title":"Construction of Brgy. Tubectubang FMR, Brgy. Tubectubang, Moncada, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":326.4,"system":"Lower Agno","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r11","title":"Construction of Brgy. Nagbaya FMR, Brgy. Nagbaya, Castillejos, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r9","title":"Construction of Brgy. Kanlurang Katigan FMR, Brgy. Kanlurang Katigan, Tayabas City, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r15","title":"Construction of Sitio Tamuad Brgy. Dampig FMR, Brgy. Dampig, Pagudpud, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":491.5,"system":"Bolo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r4","title":"Construction of Brgy. Tapuac FMR, Brgy. Tapuac, Masinloc, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r15","title":"Concreting of Brgy. Camangcamang FMR, Brgy. Camangcamang, Isabela, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":1038.6,"system":"Pangiplan","fgisRegion":"Region VI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r2","title":"Construction of Brgy. Caballero FMR, Brgy. Caballero , Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":4.8,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r3","title":"Construction of Sitio Kaitahan, Brgy. Villa Labrador FMR, Brgy. Villa Labrador, Rizal, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r7","title":"Construction of Brgy. Bigao FMR, Brgy. Bigao, Daraga, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r8","title":"Construction of Iñas-Vugayong FMR, Itbayat, Batanes","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r14","title":"Concreting of Brgy. Libertad - Brgy. Roxas FMR, Brgy. Libertad and Brgy. Roxas 1, Calbayog City, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r11","title":"Construction of Sitio Pawikan - Sitio Upper Yunot, Brgy. Nasukob FMR, Bulalacao, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r2","title":"Construction of Sitio Ogpoy - Sitio Ariada, Brgy. Alangan FMR, Brgy. Alangan, Limay, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r16","title":"Concreting of Sitio Kulipay, Brgy. Kaymisas FMR, Brgy. Kaymisas, General Emilio Aguinaldo, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r2","title":"Concreting of Sitio Panumban, Brgy. Kaypaaba FMR, Brgy. Kaypaaba, General Emilio Aguinaldo, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r14","title":"Construction of Brgy. Tabugon FMR, Brgy. Tabugon, Kabankalan City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r17","title":"Construction of Sitio Kabiyabsan, Brgy. Mayabon FMR, Brgy. Mayabon, Zamboanguita, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r8","title":"Concreting of Brgy. Dalisay FMR, Brgy. Dalisay, Panabo City, Davao del Norte","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r10","title":"Construction of Brgy. Sagaba FMR, Brgy. Sagaba, Sto. Domingo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":908.2,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r2","title":"Concreting of Brgy. Majacob - Brgy. Bonga FMR, Brgy. Majacob and Brgy. Bonga, Tarangnan, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r17","title":"Construction of Brgy. Lohong FMR, Brgy. Lohong, Ragay, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r15","title":"Construction of Brgy. Mabini to Pelaez FMR, Brgy. Mabini, Sta. Monica, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r3","title":"Construction Sitio Cuta to Sitio Lucbanan, Brgy. Anilao FMR, Brgy. Anilao, Bongabong, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r7","title":"Construction of Brgy. Rang-Ay FMR, Brgy. Rang-Ay, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":155.3,"system":"Dabubu","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r2","title":"Construction of Brgy. Pindangan 2nd FMR, Brgy. Pindangan 2nd, Camiling, Tarlac","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r5","title":"Construction of Brgy. Pila FMR, Brgy. Pila, San Pascual, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r13","title":"Opening and Concreting of Brgy. Nagtaluntong FMR at Sitio Hambuhang Aso, Brgy. Nagtaluntong, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r3","title":"Concreting of Sitio Maragaas, Brgy. Olandia - Brgy. Fabrica FMR, Brgy. Olandia and Brgy. Fabrica, Barcelona, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r13","title":"Construction of South Low Nia-Boundary, Villa Gonzaga FMR, Brgy. Villa Gonzaga, Santiago City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Balikatan DD div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r10","title":"Construction of Brgy. Mantalongon FMR, Brgy. Mantalongon, Dalaguete, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r15","title":"Construction of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":152.9,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r18","title":"Construction of Sitio Kinabkaban, Brgy. Lumaynay FMR, Brgy. Lumaynay, Altavas, Aklan","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r3","title":"Construction of Brgy. Sayaw FMR, Siayan, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r9","title":"Construction of Brgy. Loob FMR, Brgy. Loob, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":1264.7,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r12","title":"Construction of Brgy. Sapa FMR, Brgy. Sapa, Claver, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r19","title":"Construction of Sitio Sanlab, Napalico to Centro Kulaman Valley to Centro Sumalili FMR Phase I, Brgy. Napalico, Brgy. Kulaman Valley, and Brgy. Sumalili, Arakan, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r3","title":"Concreting of Brgy. Basiao - Brgy. Candiis FMR, Badian, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r15","title":"Construction of Brgy. Tignapoloan FMR Phase II, Brgy. Tignapoloan, Cagayan de Oro City","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r17","title":"Concreting of Sitio Bitin, Brgy. Kaypaaba FMR, Brgy. Kaypaaba, General Emilio Aguinaldo, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r18","title":"Construction of Brgy. Sta. Isabel to Brgy. Bagong Sikat FMR, Cabiao, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":1876.3,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r9","title":"Construction of Brgy. Pangabutan FMR, Brgy. Pangabutan, Taft, Eastern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r9","title":"Construction of Purok 6, Brgy. San Isidro FMR, Brgy. San Isidro, Rosario, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r7","title":"Construction of Brgy. Rizal FMR, Brgy. Rizal, San Narciso, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r18","title":"Construction of Pag Oring Nuevo FMR, Brgy. Pag Oring Nuevo, Libmanan, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r15","title":"Construction of Brgy. Cabuyew FMR, Brgy. Cabuyew, Liliw, Laguna","region":"REGION IVA - CALABARZON","distanceM":2885.3,"system":"Sta Cruz","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r12","title":"Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Monkayo, Davao de Oro","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r14","title":"Construction of Brgy. Palao Ranaranao FMR, Brgy. Palao Ranaranao, Marantao, Lanao del Sur","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r15","title":"Concreting of Purok 5 - Purok 2, Brgy. Tangle FMR, Brgy. Tangle, Mexico, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r9","title":"Opening and Concreting of Sitio Hambulong Aso, Brgy. Nagtaluntong FMR Phase 2, Brgy. Nagtaluntong, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r10","title":"Construction of Brgy. Masalukot 2 FMR, Brgy. Masalukot 2, Candelaria, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r14","title":"Concreting of Brgy. Sta. Ana FMR. Brgy. Sta. Ana, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":78.5,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r2","title":"Construction of Minapan to Kanibong FMR Phase I, Brgy. Minapan and Brgy. Kanibong, Tulunan, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":544.3,"system":"Malasila","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r6","title":"Construction of Brgy. Kibao FMR, Brgy. Kibao, Matanao, Davao del Sur","region":"REGION XI - DAVAO","distanceM":1150.4,"system":"Padada","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r7","title":"Construction of Brgy. Bayabas - Sitio Kabotosan FMR, Brgy. Bayabas, Abuyog, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r15","title":"Construction of Brgy. Tobor FMR, Brgy. Tobor, Malasiqui, Pangasinan","region":"REGION I - ILOCOS","distanceM":3519.8,"system":"Agno","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r14","title":"Construction of Brgy. Banilad FMR, Brgy. Banilad, Magdalena, Laguna","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p673:r2","title":"Construction of Bokig to Beckes, Brgy. Paoay FMR, Brgy. Paoay, Atok, Benguet","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r2","title":"Construction of Sitio Agcararao, Brgy. Jaguimitan FMR, Brgy. Jaguimitan, Passi City, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r14","title":"Construction of Purok 3 to Purok 7, Brgy. Minongan FMR, Brgy. Minongan, Quezon, Bukidnon","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r4","title":"Concreting of Brgy. Tapae - Brgy. Alibaba FMR, Brgy. Tapae and Brgy. Alibaba, Calbayog City, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r8","title":"Construction of Siguiran FMR, Brgy. Siguiran, Abulug, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":1479.2,"system":"West Apayao Abulug","fgisRegion":"CAR","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r14","title":"Concreting of Brgy. Kaliwanagan to Brgy. Tayabo FMR, Brgy. Kaliwanagan and Brgy. Tayabo, San Jose City, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r19","title":"Concreting of Brgy. Cuatro-Cuatro FMR, Dumalinao, Zamboanga del Sur","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r15","title":"Construction of Brgy. Jinggan FMR, Brgy. Jinggan, Panglima Estino, Sulu","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r10","title":"Concreting of Purok 6, Brgy. San Vicente FMR, Brgy. San Vicente, Mexico, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r8","title":"Construction of Brgy. Magsaysay FMR, Brgy. Magsaysay, Aliaga, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Aliaga","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r14","title":"Construction of Brgy. Cabisera 17-21 to Brgy. Sindon Maride FMR, Brgy. Cabisera 17-21, Ilagan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r9","title":"Construction of Sitio Kalubihan, Brgy. Talaptap FMR, Brgy. Talaptap, La Castellana, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r11","title":"Construction of Brgy. Luna to Brgy. San Isidro FMR, San Jacinto, Masbate","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r5","title":"Construction of Brgy. Cebuneg FMR, Brgy. Cebuneg, Aurora, Zamboanga del Sur","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r13","title":"Construction of Brgy. Banilad FMR, Banilad, Majayjay, Laguna","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r8","title":"Concreting of Brgy. Suchan to Brgy. Quigaray FMR, Brgy. Suchan and Brgy. Quigaray, Bagamanoc, Catanduanes","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r12","title":"Construction of Sitio Anilao to Brgy. Dambo FMR, Brgy. Dambo, Pangil, Laguna","region":"REGION IVA - CALABARZON","distanceM":0.0,"system":"Dambo","fgisRegion":"Region IV-A","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r15","title":"Concreting of Brgy. Water FMR, Brgy. Water, Baco, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r10","title":"Construction of Sitio Sinabugan to Sitio Centro, Brgy. Tio-angan FMR, Brgy. Tio-angan, Bagulin, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r17","title":"Concreting of Brgy. Balagtasin FMR, Brgy. Balagtasin, San Luis, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r8","title":"Construction of Brgy. San Isidro going to Sanitary Landfill FMR, Brgy. San Isidro, Mainit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r10","title":"Concreting of Brgy. Sindaton FMR, Brgy. Sindaton, Panabo City, Davao del Norte","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r18","title":"Construction of Lupang Pangako, Brgy. San Agustin FMR, Brgy. San Agustin, Iba, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r16","title":"Construction of Purok-2 to Purok-3, Brgy. Sipaon FMR, Brgy. Sipaon, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r3","title":"Concreting of Sitio Lourdes, Brgy. Tignapoloan FMR, Brgy. Tignapoloan, Cagayan de Oro City","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r12","title":"Construction of Purok 1 to Purok 3 Brgy. Lomboy FMR, Sta. Cruz, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":140.7,"system":"NB RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r5","title":"Construction of Sitio Riverside to Sitio Bungahan, Brgy. Libertad FMR, Bongabong, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r10","title":"Construction of Brgy. Libertad FMR, Brgy. Libertad, Bongabong, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r4","title":"Construction/Improvement of Brgy. Mabalor FMR, Brgy. Mabalor, Ibaan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r12","title":"Construction of Brgy. Colosboa FMR, Brgy. Colosboa, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":1119.6,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r17","title":"Construction of Brgy. Edy FMR, Brgy. Edy, Nampicuan, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":138.2,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r2","title":"Construction of Brgy. Kapalangan FMR, Brgy. Kapalangan, Gapan City, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Penablanca RIS","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r14","title":"Construction of Sitio Tikwi, Brgy. San Agustin FMR (Phase II), Brgy. San Agustin, Magallanes, Cavite","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r2","title":"Construction of Coastal Road to Bacuring to Tugun to Nabintad to Gapas, Brgy. Madaum FMR, Brgy. Madaum, Tagum City, Davao del Norte","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r2","title":"Construction of Sitio Centro to Sitio Balite, Brgy. Camantigue FMR, Brgy. Camantigue, Bongabong, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p687:r7","title":"Construction of Sto. Rosario FMR, Brgy. Sto. Rosario, Aliaga, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":954.5,"system":"Aliaga","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r8","title":"Construction of Purok Luyan, Brgy. Kalanawe 2 to Purok 2, Brgy. Tinaungan FMR, Brgy. Kalanawe 2 and Brgy. Tinaungan, Pres. Quirino, Sultan Kudarat","region":"REGION XII - SOCCSKSARGEN","distanceM":82.0,"system":"Lambayong","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r17","title":"Construction of Brgy. Paco Roman, Brgy. Paco Roman, Rizal, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Pampanga River","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r11","title":"Construction of Brgy. Morales FMR, Brgy. Morales, Santa Cruz, Marinduque","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r13","title":"Construction of Brgy. Papandungin to Brgy. Malayong FMR, Gloria, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r13","title":"Construction of Brgy. Sto Niño Ilaya FMR, Brgy. Sto Niño Ilaya, Lopez, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r3","title":"Construction of Brgy. Villamore FMR, Brgy. Villamore, Cabarroguis, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r15","title":"Construction of Brgy. Gaddanan - Brgy. Mataas na Kahoy - Brgy. Nagrumbuan FMR, Brgy. Gaddanan, Brgy. Mataas na Kahoy and Brgy. Nagrumbuan, San Mateo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p682:r11","title":"Construction of Sitio Anoling-Bataan, Brgy. Sta. Barbara FMR, Iba, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r10","title":"Construction of Sitio Bilwang, Brgy. Quipot FMR, Brgy. Quipot, San Juan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r8","title":"Construction of Brgy. Canaway FMR (Phase 2), Brgy. Canaway, Malilipot, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r3","title":"Construction of Brgy. San Isidro to Brgy. Binga FMR, Brgy. San Isidro, Mainit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r11","title":"Construction of FMR connecting Brgy. Dibuluan to Brgy. Namnama, Jones, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r6","title":"Construction of Valdeconcha to Silad FMR, Binuangan, Misamis Oriental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r6","title":"Construction of Brgy. San Antonio FMR, Brgy. San Antonio, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r10","title":"Construction of Brgy. Gueteb to Brgy. Balangay FMR, Brgy. Gueteb, Urbiztondo, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r14","title":"Construction of Brgy. Manga to Brgy. Bayabas FMR, Brgy. Manga and Brgy. Bayabas, Alcantara, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r2","title":"Construction of Brgy. Calaguimit FMR, Brgy. Calaguimit, Oas, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r16","title":"Construction of La Purisima to San Eustacio FMR, Brgy. La Purisima to Brgy. San Eustacio, Aliaga, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":1548.2,"system":"Aliaga","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r19","title":"Concreting of Brgy. Sta. Cruz FMR, Brgy. Sta. Cruz, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r12","title":"Concreting of Brgy. San Martin FMR, Brgy. San Martin, San Luis, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r11","title":"Construction of Brgy. Dorongan Linmasangan FMR, Brgy. Dorongan Linmasangan, Mangatarem, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r8","title":"Construction of Brgy. Maglipad FMR, Brgy. Maglipad, Calauag, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r4","title":"Concreting of Purok Makiangayon, Brgy. Esperanza to Purok Sampaguita, Brgy. New Pangasinan FMR Phase II, Brgy. New Pangasinan, Koronadal City, South Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":3424.0,"system":"Marbel 1","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r2","title":"Construction of Brgy. Ramos West FMR, San Isidro, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 1","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r7","title":"Concreting of Brgy. Bobongon FMR, Brgy. Bobongon, Santo Tomas, Davao del Norte","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r16","title":"Construction of Sitio Mabato Brgy. Daan Pare FMR, Brgy. Daan Pare, Orion, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r11","title":"Construction of Brgy. 56-A Bacsil North FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":1722.8,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r8","title":"Construction of Brgy. Silangan Katigan FMR, Brgy. Silangan Katigan, Tayabas City, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r3","title":"Concreting of Brgy. Malasin FMR, Brgy. Malasin, Santo Domingo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":4.9,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r8","title":"Construction of Brgy. San Francisco to Dabburab FMR, Brgy. San Francisco - Brgy. Dabburab, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":5.7,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r9","title":"Concreting of Brgy. Sampaloc - Brgy. Loob FMR, Gainza Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r7","title":"Construction of Huwit-Huwit - Lianutan FMR Phase II, Brgy. Huwit-Huwit, Omar, Sulu","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r4","title":"Concreting of Brgy. Tigmarabo FMR, Brgy. Tigmarabo, Miagao, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r2","title":"Concreting of Brgy. Batadbatad - Brgy. Buguil FMR, Moalboal, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p669:r8","title":"Construction of Brgy. Payac FMR Phase III, Brgy. Payac, Bangui, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r18","title":"Construction of Brgy. Mainit FMR, Brgy. Mainit, Iligan City, Lanao del Norte","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r12","title":"Concreting of Brgy. New Guia FMR, Brgy. New Guia, Maayon, Capiz","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r10","title":"Construction of Brgy. Cambaro FMR, Brgy. Cambaro, Macrohon, Southern Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r9","title":"Construction of Brgy. San Roque to Anahawan FMR, Brgy. San Roque, Calauag, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r18","title":"Construction of Brgy. Libato FMR, Brgy. Libato, San Juan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r11","title":"Construction of Brgy. Pulong Buli FMR, Brgy. Pulong Buli, Sto. Domingo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r6","title":"Construction of Brgy. Ilayang Ilasan FMR, Brgy. Ilayang Ilasan, Tayabas City, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r5","title":"Construction of Brgy. Sudlon I FMR, Brgy. Sudlon I, Cebu City, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r12","title":"Construction of Brgy. Tandu Patong FMR, Brgy. Tandu Patong, Maimbung, Sulu","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r6","title":"Construction of Brgy. Aet FMR, Brgy. Aet, Sulat, Eastern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r15","title":"Construction of Brgy. Cabayangan FMR, Brgy. Cabayangan, Braulio E. Dujali, Davao del Norte","region":"REGION XI - DAVAO","distanceM":0.0,"system":"Libuganon","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r12","title":"Construction of Brgy. Labnig FMR, Brgy. Labnig, Paracale, Camarines Norte","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r3","title":"Construction of Brgy. San Isidro II FMR, Brgy. San Isidro II, Paombong, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":1209.0,"system":"AMRIS bulacan","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r3","title":"Construction of Brgy. General Luna FMR, Brgy. General Luna, Sto. Domingo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":117.6,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r5","title":"Construction of Purok Magtatanim Brgy. Matin-ao FMR, Brgy. Matin-ao, Mainit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r13","title":"Construction of Sitio Victory Brgy. Maite FMR, Brgy. Maite, Hermosa, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r10","title":"Construction of Purok 3, Brgy. Pangil FMR, Brgy. Pangil, Pasuquin, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":2015.8,"system":"NMC","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r9","title":"Construction of Brgy. Silijagon-Sitio Pangudtan FMR, Brgy. Silijagon, Mapanas, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r13","title":"Construction of P-3 Brgy. Mabini to Sitio Tagbasinga, Brgy. Mat-I FMR, Surigao City, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r20","title":"Construction of Sitio Karamuhi FMR, Brgy. San Isidro, San Jose del Monte, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r7","title":"Construction of Purok 2, Brgy. Lomboy FMR, Brgy. Lomboy, Santa Cruz, Zambales","region":"REGION III - CENTRAL LUZON","distanceM":547.9,"system":"NB RIS","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r9","title":"Construction of Sitio Arayat Brgy. Matin-ao, Mainit FMR, Brgy. Matin-ao, Mainit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r15","title":"Concreting of Sitio Culduroy, Brgy. Dibuluan FMR with Slope Protection, Brgy. Dibuluan, San Mariano, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r2","title":"Construction of Brgy. Silop FMR, Brgy. Silop, Mainit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r10","title":"Construction of Brgy. Yaganak FMR, Brgy. Yaganak, Calauag, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r9","title":"Construction of Brgy. Cawayan FMR, Brgy. Cawayan, Bongabon, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r13","title":"Construction of Brgy. Columbitin FMR, Brgy. Columbitin, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r5","title":"Concreting of Brgy. Bonliw FMR, Brgy. Bonliw, San Luis, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p670:r12","title":"Construction of Brgy. 60-A Caaoacan FMR, Laoag City, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":2109.9,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r8","title":"Concreting of Brgy. Alemania to Brgy. Mayantoc FMR, Brgy. Alemania and Brgy. Mayantoc, Nampicuan, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":236.6,"system":"PRIS SDC Phase 2","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r5","title":"Construction of Brgy. Mantacida FMR, Brgy. Mantacida, Catigbian, Bohol","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r9","title":"Construction of Caguiba-Miti FMR, Camalig, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r17","title":"Rehabilitation of Palanas St., Brgy. Bagong Barrio FMR, Bagong Barrio, Pandi, Bulacan","region":"REGION III - CENTRAL LUZON","distanceM":814.8,"system":"AMRIS bulacan","fgisRegion":"Region III","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r6","title":"Construction of Brgy. Dagupan FMR, Brgy. Dagupan, Aglipay, Quirino","region":"REGION II - CAGAYAN VALLEY","distanceM":2.1,"system":"Addalam","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r6","title":"Construction of Brgy. Canlandog FMR, Brgy. Canlandog, Murcia, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r9","title":"Concreting of Amontoc FMR (Palpalidan Section), Brgy. Amontoc, San Gabriel, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r11","title":"Construction of Barindadu, Purok 5, Brgy. Dabubu Grande FMR, Brgy. Dabubu Grande, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Dabubu","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r10","title":"Construction of Nursery, P7, Brgy. Sto. Niño FMR, Brgy. Sto. Niño, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Dabubu","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r15","title":"Construction of Brgy. Mahabang Parang FMR, Brgy. Mahabang Parang, Naujan, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r5","title":"Construction of Brgy. Bukal Maligaya FMR, Brgy. Bukal Maligaya, Guinayangan, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r3","title":"Construction of Brgy. Margaay FMR, Brgy. Margaay, Vintar, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":98.1,"system":"Laog Vintar","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r14","title":"Construction of Brgy. Taguranao FMR, Brgy. Taguranao, Matalam, Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p707:r18","title":"Construction of Sitio Capasigan, Brgy. Alimono FMR, Brgy. Alimono, Passi City, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p692:r12","title":"Construction of Brgy. Sapangan FMR, Brgy. Sapangan, San Juan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r15","title":"Construction of Brgy. Villahermosa to Brgy. Garrido to Brgy. K. Bugtong FMR, Brgy. Villahermosa & Brgy. Garrido & Brgy. K. Bugtong, Calubian, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r10","title":"Construction of Brgy. Cabasan FMR, Brgy. Cabasan, Peñablanca, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":1960.2,"system":"Pinacauan","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r16","title":"Construction of Brgy. Jantianon FMR Phase II, Brgy. Jantianon, Amlan, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r5","title":"Construction of Canarom/Florista FMR, Daraga/Jovellar, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r16","title":"Construction of Sitio Damulog, Brgy. Daan Pare FMR, Brgy. Daan Pare, Orion, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r19","title":"Construction of Brgy. Cabangahan FMR, Brgy. Cabangahan, Cantilan, Surigao del Sur","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r6","title":"Construction of P-6 Brgy. San Francisco FMR, Brgy. San Francisco, Mainit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r17","title":"Concreting of Lungib FMR, Brgy. Lungib, Pilar","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r4","title":"Construction of Brgy. Namoroc FMR, Brgy. Namoroc, Vintar, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r14","title":"Construction of Brgy. San Andres - Brgy. Sulpa FMR, Siruma, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r13","title":"Construction of Brgy. Gueteb FMR, Brgy. Gueteb, Urbiztondo, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r4","title":"Construction of Brgy. Luna Weste - Brgy. Concepcion FMR, Brgy. Luna Weste and Brgy. Concepcion, Umingan, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r3","title":"Construction of Brgy. Nagrumbuan FMR 1, Brgy. Nagrumbuan, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r4","title":"Construction of Brgy. Caglayag, Carrascal to Brgy. Consuelo, Cantilan FMR, Carrascal, Surigao del Sur","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r4","title":"Construction of Brgy. Canabay - Brgy. Carolotan FMR, Brgy. Canabay and Brgy. Carolotan, Dupax Del Sur, Nueva Vizcaya","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r7","title":"Construction of Sitio Utoy, Estancia FMR, Piddig, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p693:r4","title":"Construction of Brgy. Alitap FMR, Brgy. Alitap, Mauban, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r7","title":"Construction of Brgy. San Diego Bukid FMR, Brgy. San Diego Bukid, Gumaca, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r2","title":"Concreting of Brgy. E. J. Dulay, Laoang - Brgy. Nagbobtac, Palapag FMR, (Phase II), Laoang and Palapag, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p668:r15","title":"Construction of Brgy. Baug FMR, Brgy. Baug, Urbiztondo, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r5","title":"Construction of Brgy. Bongabong FMR, Brgy. Bongabong, Tangub City, Misamis Occidental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r6","title":"Construction of Tabing Ilog FMR, Brgy. Tabing Ilog, Licab, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r10","title":"Construction of Ilayang Bukal FMR, Brgy. Ilayang Bukal, Tayabas City, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r15","title":"Concreting of Brgy. San Pablo FMR, Brgy. San Pablo, Bauan, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r11","title":"Construction of Brgy. Sto. Niño FMR, Brgy. Sto. Niño, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Dabubu","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r2","title":"Construction of Brgy. Villa Tañada FMR, Brgy. Villa Tañada, Gumaca, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p725:r7","title":"Construction of Brgy. Binga to Sitio Maniuyom FMR, Brgy. Binga, Mainit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r7","title":"Construction of Brgy. Talitay FMR, Brgy. Talitay, Buluan, Maguindanao del Sur","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r7","title":"Construction of Brgy. Escoda - Brgy. Elizabeth FMR, Brgy. Escoda and Brgy. Elizabeth, Marcos, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":1106.2,"system":"Papa","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r4","title":"Construction of Sitio Cagurungan, Brgy. Eden FMR, Brgy. Eden, San Manuel, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":268.6,"system":"Magat div 3","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r8","title":"Construction of Brgy. San Cristobal to Brgy. Tabing Ilog FMR, Brgy. San Cristobal to Brgy. Tabing Ilog, Licab, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":0.0,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r11","title":"Construction of Sitio Paraiso, Brgy. Culat FMR, Brgy. Culat, Casiguran, Aurora","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r2","title":"Construction of Brgy. Bayogo Proper to Kamonohan FMR, Brgy. Bayogo, Madrid, Surigao del Sur","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r9","title":"Construction of Brgy. Manacsac FMR, Brgy. Manacsac, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":346.6,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r11","title":"Concreting of Brgy. San Ramon - Brgy. Giparayan FMRR, Pambujan, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r3","title":"Construction of Sitio Proper, Brgy. Agtabo to Sitio Salngan Sur, Brgy. Salngan FMR, Brgy. Agtabo, Passi City, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r2","title":"Concreting of Brgy. San Isidro - Brgy. Salvacion FMR, Brgy. Salvacion,","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r5","title":"Construction of Sitio Ocad, Brgy. Salngan FMR, Brgy. Salngan, Passi City, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r5","title":"Concreting of Sitio Parad, Brgy. Fabrica - Brgy. San Ramon FMR (Phase 2), Brgy. Fabrica & Brgy. San Ramon , Barcelona, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r13","title":"Concreting of Brgy. Boboy FMR, Brgy. Boboy, San Luis, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r14","title":"Concreting of Sitio Bugkong, Brgy. Bugtong na Tuog FMR, Brgy. Bugtong na Tuog, Socorro, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r8","title":"Concreting of Brgy. San Nicolas FMR, Brgy. San Nicolas, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r8","title":"Construction of Brgy. Sta. Matilde FMR (Bareng, Yanos, Agagamang Section), Brgy. Sta. Matilde, Pasuquin, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":4891.7,"system":"NMC","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p697:r8","title":"Opening and Concreting of Sitio Mariwasa, Brgy. Biga FMR, Brgy. Biga Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r4","title":"Construction of Brgy. Taloto- Brgy. Panoypoy FMR, Brgy. Taloto & Brgy. Panoypoy, Camalig, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p689:r3","title":"Construction of Sitio Tikip, Brgy. Reformista FMR, Brgy. Reformista, Limay, Bataan","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r7","title":"Concreting of Brgy. Papaya FMR, Brgy. Papaya, Tingloy, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r12","title":"Construction of Brgy. San Juan FMR, Brgy. San Juan, Licab, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":1483.6,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r15","title":"Concreting of Brgy. Paradise FMR, Brgy. Paradise, Cabanglasan, Bukidnon","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r7","title":"Construction of Brgy. Conrazon FMR, Brgy. Conrazon, Bansud, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r13","title":"Concreting of Brgy. Saclayan FMR, Brgy. Saclayan, Castilla, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r12","title":"Construction of Purok 7, Brgy. Mapalad FMR, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":597.9,"system":"Dibuluan","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p696:r19","title":"Concreting of Sitio 7, Brgy. Balite FMR, Sitio 7, Brgy. Balite, San Luis, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r12","title":"Concreting of Brgy. Osmeña - Brgy. Bangon FMR, Palapag, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r13","title":"Construction of Brgy. Cumabao to Brgy. San Vicente FMR, Brgy. Cumabao, Tumauini, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r7","title":"Construction of Paitan Sur FMR, Brgy. Paitan Sur, Cuyapo, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r13","title":"Construction of Brgy. Pag-asa FMR, Brgy. Pag-asa, Labo, Camarines Norte","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r16","title":"Construction of Brgy. San Alejandro FMR, Brgy. San Alejandro, Quezon, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":5.6,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r13","title":"Construction of Brgy. Salvacion FMR, Brgy. Salvacion, Balud, Masbate","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r8","title":"Construction of Brgy. Tubod to Brgy. Magsico FMR, Brgy. Tubod and Brgy. Magsico, San Fernando, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r10","title":"Concreting of Brgy. Balibago FMR, Brgy. Balibago, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r6","title":"Concreting of Brgy. Balibago FMR, Brgy. Balibago, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r7","title":"Construction of Brgy. Lahi FMR, Brgy. Lahi, Gigaquit, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r16","title":"Construction of Brgy. Sto Niño FMR, Brgy. Sto Niño, Magalang, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p722:r12","title":"Concreting of Purok Mabinuligon - Purok Kabugwason - Sitio Mani, Brgy. Topland FMR, Koronadal City, South Cotabato","region":"REGION XII - SOCCSKSARGEN","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r12","title":"Construction of Brgy. Don Pablo Dela Rosa FMR, Brgy. Don Pablo Dela Rosa, Aroroy, Masbate","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r14","title":"Construction of Brgy. Talaon to Brgy. Pitogo FMR, Brgy. Talaon and Brgy. Pitogo, La Libertad, Negros Oriental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r10","title":"Construction of Brgy. Cumba FMR, Brgy. Cumba, Batangas City, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r4","title":"Concreting of Brgy. Dagumbaan to Brgy. Bagong Silang FMR, Brgy. Dagumbaan, Maramag, Bukidnon","region":"REGION X - NORTHERN MINDANAO","distanceM":8712.7,"system":"Muleta","fgisRegion":"Region X","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r13","title":"Construction of Brgy. Camalandaan FMR, Brgy. Camalandaan, Cauayan, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r10","title":"Concreting of Brgy. Malidong - Brgy. Luneta - Brgy. Henogawe FMR, Gamay, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r2","title":"Construction of Brgy. Cocok-Cabitan to Recto FMR, Bulan, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p705:r15","title":"Concreting of Brgy. Cogon FMR, Brgy. Cogon, Castilla, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r10","title":"Construction of Brgy. Timalang FMR, Brgy. Timalang, Ipil, Zamboanga Sibugay","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r16","title":"Concreting of Brgy. Anislagan to Brgy. Agas FMR, Brgy. Anislagan and Brgy. Agas, Calubian, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r12","title":"Concreting of Dapiz, Kasaksian, Brgy. Mapalad FMR, Brgy. Mapalad, San Agustin, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Dibuluan","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r5","title":"Construction of Brgy. Cabasan to Brgy. Pongco FMR, Brgy. Cabasan and Brgy. Pongco, Bacacay, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p718:r2","title":"Construction of Brgy. Diongan FMR, Siayan, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r14","title":"Construction of Brgy. Gappal FMR 3, Brgy. Gappal, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":819.0,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r17","title":"Construction of Sitio Baccay-Sitio Umayam, Brgy. San Antonio FMR, Brgy. San Antonio, Cabagan, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p691:r17","title":"Construction of Brgy. Cansuso FMR, Brgy. Cansuso, Cavinti, Laguna","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r8","title":"Concreting of Hacienda Amanda, Brgy. VIII FMR, Brgy. VIII, Victorias City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p695:r11","title":"Concreting of Brgy. Sulsugin FMR, Brgy. Sulsugin, Nagcarlan, Laguna","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p684:r15","title":"Construction of Brgy. Gulod FMR, Brgy. Gulod, Talavera, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":555.3,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r7","title":"Construction of Brgy. Poblacion Norte FMR, Brgy. Poblacion Norte, Licab, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":554.9,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r14","title":"Construction of Brgy. San Isidro FMR, Brgy. San Isidro, San Lorenzo Ruiz, Camarines Norte","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r6","title":"Construction of Sitio Mungos to Sitio Lalid, Brgy. Hagan FMR, Bongabong, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r16","title":"Construction of Brgy. San Vicente-Brgy. Limbauan FMR, Brgy. San Vicente and Brgy. Limbauan, San Pablo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r12","title":"Construction of Brgy. San Isidro to Brgy. San Juan FMR, Brgy. San Isidro, Lavezares, Northern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r19","title":"Construction of Brgy. Joaquin Macias FMR, Sindangan, Zamboanga del Norte","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p685:r6","title":"Construction of Brgy. San Casimiro to Brgy. Linao FMR, Brgy. San Casimiro, Licab, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":7.9,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p688:r7","title":"Construction of San Miguel to Sta. Rita FMR, Brgy. San Miguel to Brgy. Sta. Rita, Quezon, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":310.2,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r11","title":"Construction of Brgy. Alibangsay FMR, Brgy. Alibangsay, Bagulin, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p706:r7","title":"Concreting of Brgy. San Rafael - Brgy. Salvacion FMR, Sta. Magdalena, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r10","title":"Construction of Sitio Gutob, Brgy. Lidong to Brgy. Amoguis FMR, Brgy. Lidong and Brgy. Amoguis, Polangui, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p710:r2","title":"Construction of Brgy. Codcod FMR, Brgy. Codcod, San Carlos City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r19","title":"Construction of Pogpogok to Bas-ang FMR, Tamac, Villaviciosa, Abra","region":"CORDILLERA ADMINISTRATIVE REGION (CAR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p698:r2","title":"Concreting of Sitio Malitlit, Brgy. Jaybanga FMR, Brgy. Jaybanga, Lobo, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r7","title":"Concreting of Sitio Bigat Road, Brgy. Awile FMR, Brgy. Awile, Anda, Pangasinan","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r3","title":"Construction of Brgy. Buan FMR, Brgy. Buan, Asuncion, Davao del Norte","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p694:r4","title":"Construction of Brgy. Matamis FMR, Brgy. Matamis, Rosario, Batangas","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r2","title":"Construction of Brgy. Bago FMR, Brgy. Bago, Vintar, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r5","title":"Concreting of Brgy. Olango - Brgy. Pudpud FMR, Brgy. Olango and Brgy. Pudpud, Miagao, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p719:r7","title":"Construction of Sitio Tagpaco to Sitio Mahayag FMR, Brgy. Sinalac, Initao, Misamis Oriental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r16","title":"Construction of Sitio Sto. Niño, Brgy. Macalaya FMR, Brgy. Macalaya, Castilla, Sorsogon","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p680:r12","title":"Construction of Corehouse to Pinakamakan Dam FMR, Brgy. Manggitahan, Dilasag, Aurora","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r5","title":"Construction of Brgy. Baruk - Brgy. Caghalong - Brgy. Can-ilay FMR, Can-avid, Eastern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r8","title":"Construction of Sitio Little Baguio to Avocado, Brgy. Conrazon FMR, Brgy. Conrazon, Bansud, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r12","title":"Construction of Brgy. Liboron to Boundary Lanipga FMR, Brgy. Liboron, Carmen, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r8","title":"Concreting of Brgy. Sebasi to Brgy. Bernad Old Road FMR, Clarin, Misamis Occidental","region":"REGION X - NORTHERN MINDANAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r2","title":"Concreting of Brgy. Alimodias FMR, Brgy. Alimodias, Miag-ao, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p704:r9","title":"Construction of Purok 2 to Purok 6 and 7 FMR, Brgy. Malipo, Camalig, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p701:r17","title":"Concreting of Brgy. Arangin FMR, Brgy. Arangin, Naujan, Oriental Mindoro","region":"REGION IVB - MIMAROPA","distanceM":2210.1,"system":"Baco Bacayao","fgisRegion":"Region IV-B","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p702:r6","title":"Construction of Brgy. San Antonio Santicon FMR, Brgy. San Antonio Santicon, Malilipot, Albay","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p720:r16","title":"Construction of Acasia-Asinan, Brgy. San Isidro FMR, Brgy. San Isidro, Magsaysay, Davao del Sur","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r16","title":"Construction of Brgy. Manaoag FMR 1, Brgy. Manaoag, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":3659.7,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p721:r5","title":"Construction of Purok 1 - 6, Brgy. Balnate FMR, Brgy. Balnate, Magsaysay, Davao del Sur","region":"REGION XI - DAVAO","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r2","title":"Construction of Brgy. Manaoag FMR 2, Brgy. Manaoag, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":3797.3,"system":"Magat div 4","fgisRegion":"MARIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p716:r7","title":"Construction of Brgy. Magsaysay - Brgy. Malvar FMR, Balangkayan, Eastern Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r13","title":"Concreting/Rehabilitation of Brgy. Napaliong FMR, Brgy. Napaliong, Jones, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":0.0,"system":"Dibuluan","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r7","title":"Construction of Brgy. Namurabod to Labawon FMR, Brgy. Namurabod, Buhi, Camarines Sur","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r16","title":"Construction of Brgy. Dipilat FMR, Brgy. Dipilat, Vintar, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r4","title":"Construction of Brgy. Dianao FMR, Brgy. Dianao, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p703:r14","title":"Construction of Junction Road to Brgy. Pananawan FMR, Brgy. Pananawan, Cawayan, Masbate","region":"REGION V - BICOL","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p711:r5","title":"Construction of Sitio Sewahon 3, Brgy. VF Gustilo FMR, Brgy. VF Gustilo, Cadiz City, Negros Occidental","region":"NEGROS ISLAND REGION (NIR)","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p724:r3","title":"Construction of PRJ Sitio Luagon to Proper Brgy. Gamut FMR, Gamut, Barobo, Surigao del Sur","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r9","title":"Construction of Sitio Dayegdeg, Brgy. Lon-oy FMR, Brgy. Lon-oy, San Gabriel, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p714:r6","title":"Concreting of Brgy. Canhumadac to Brgy. Helino FMR, Brgy. Canhumadac and Brgy. Helino, Calbayog City, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r12","title":"Construction of San Carlos-Diasan FMR, Echague, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p672:r8","title":"Concreting of Brgy. Lon-oy - Brgy. Bayabas FMR, San Gabriel, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r13","title":"Construction of Brgy. Disimuray to Casalatan FMR, Brgy. Disimuray, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r7","title":"Construction of Sitio Dimas, Brgy. Minuri FMR, Brgy. Minuri, Jones, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":842.7,"system":"Dibuluan","fgisRegion":"Region II","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r2","title":"Construction of Brgy. Doro FMR, Brgy. Doro, Malimono, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r5","title":"Construction of Brgy. Cagtinae FMR Phase II, Brgy. Cagtinae, Malimono, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r5","title":"Construction of Brgy. Buyon FMR, Brgy. Buyon, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p717:r14","title":"Construction of Sitio Lukbu Brgy. Saimbangon FMR, Brgy. Saimbangon, Pata, Sulu","region":"REGION IX - ZAMBOANGA PENINSULA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r17","title":"Construction of Sitio Dasar FMR, Brgy. Isic-isic, Vintar, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r15","title":"Construction of Brgy. Maligaya to Baculod FMR, Brgy. Maligaya, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r16","title":"Concreting of Sitio Bulawan, Brgy. Buyusan FMR, Brgy. Buyusan, San Mariano, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p726:r3","title":"Construction of Purok 2 Brgy. Cayawan FMR Phase II, Brgy. Cayawan, Malimono, Surigao del Norte","region":"REGION XIII - CARAGA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r10","title":"Construction of Brgy. Villa Teresita FMR, Brgy. Villa Teresita, San Guillermo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p690:r6","title":"Construction of Brgy. Diniog FMR, Brgy. Diniog, Dilasag, Aurora","region":"REGION III - CENTRAL LUZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r4","title":"Construction of Brgy. Sta. Maria to Villa Concepcion FMR, Brgy. Sta. Maria, Cauayan City, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p713:r13","title":"Construction of Sitio Kabaringan, Brgy. Apale FMR, Brgy. Apale, Isabel, Leyte","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r8","title":"Construction of Sitio Diarao Baba, Brgy. Dicamay 2 FMR, Brgy. Dicamay 2, Jones, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r9","title":"Construction of Brgy. San Mariano Sur - Sinalugan FMR, Brgy. San Mariano Sur, San Guillermo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p679:r3","title":"Construction of Purok 7, Brgy. Nueva Era FMR, San Manuel, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r12","title":"Construction of Brgy. Aringay FMR, Brgy. Aringay, San Guillermo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p715:r13","title":"Concreting of Brgy. Luna - Brgy. Nipa FMR, Brgy. Luna and Brgy. Nipa, Tagapul-an, Samar","region":"REGION VIII - EASTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r2","title":"Construction of Sitio Americana-San Francisco Norte FMR, San Guillermo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r5","title":"Construction of FMR at Sitio Dicabugue, Brgy. Dicamay 1, Jones, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p678:r6","title":"Construction of Sitio Cusapit, Brgy. Dicamay 1 FMR, Brgy. Dicamay 1, Jones, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p677:r11","title":"Construction of Brgy. Burgos - Sitio Vietnam FMR, Brgy. Burgos, San Guillermo, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p675:r8","title":"Construction of Dicadyuan to Brgy. Didaddungan FMR, Brgy. Dicadyuan, Palanan, Isabela and Brgy. Diddadungan, Palanan, Isabela","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p712:r11","title":"Construction of Brgy. Union FMR, Brgy. Union, San Francisco, Cebu","region":"REGION VII - CENTRAL VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p674:r10","title":"Construction of Balagubag, Brgy. Magsidel FMR, Brgy. Magsidel, Calayan, Cagayan","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p700:r15","title":"Construction of Local Access road Rizal St., Brgy. Tenga-Tenga to Brgy. Suba FMR, Brgy. Tenga-Tenga to Brgy. Suba, Cuyo, Palawan","region":"REGION IVB - MIMAROPA","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p671:r13","title":"Construction of Sitio Cagat to Sitio Turod, Brgy. Tangaoan FMR, Brgy. Tangaoan, Piddig, Ilocos Norte","region":"REGION I - ILOCOS","distanceM":19849.6,"system":"Bolo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p667:r8","title":"Construction of Sitio Sao, Brgy. Daking FMR, Brgy. Daking, San Gabriel, La Union","region":"REGION I - ILOCOS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p676:r3","title":"Construction of Brgy. Beti to Brgy. Yaway FMR, Brgy. Beti and Brgy. Yaway, Aritao, Nueva Vizcaya","region":"REGION II - CAGAYAN VALLEY","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p686:r8","title":"Construction of Brgy. Catimon FMR, Brgy. Catimon, Guimba, Nueva Ecija","region":"REGION III - CENTRAL LUZON","distanceM":159.1,"system":"PRIS SDC","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p681:r18","title":"Construction of Purok 3, Brgy. Suclayin FMR, Brgy. Suclayin, Arayat, Pampanga","region":"REGION III - CENTRAL LUZON","distanceM":174.0,"system":"Talavera lower","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p699:r7","title":"Construction of Brgy. Santol FMR, Brgy. Santol, Mauban, Quezon","region":"REGION IVA - CALABARZON","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p708:r8","title":"Concreting of Brgy. Camia FMR, Brgy. Camia, San Joaquin, Iloilo","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p709:r12","title":"Concreting of Brgy. San Fernando - Brgy. Buenavista Norte FMR, Brgy. San Fernando and Brgy. Buenavista Norte, Miagao, Iloilo,","region":"REGION VI - WESTERN VISAYAS","distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"ib:p723:r10","title":"Concreting of Brgy. Mamali - Brgy. Pidtiguian FMR, Lambayong, Sultan Kudarat","region":"REGION XII - SOCCSKSARGEN","distanceM":352.2,"system":"Lambayong","fgisRegion":"Region XII","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:16942","title":"Construction of Concrete Road - Concreting of Brgy. Taguipuro FMRˏ   Brgy. Taguipuroˏ   Banguiˏ   Ilocos Norte","region":null,"distanceM":586.9,"system":"Bolo","fgisRegion":"Region I","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:7397","title":"Construction of Concrete Road - Concreting of Sitio Macupit to Sitio Malipa FMRˏ   Brgy. Nagbayanˏ   Castillejosˏ   Zambales","region":null,"distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:76913","title":"Construction of Concrete Road - Concreting of Brgy. Umanganˏ   Aliaga to Brgy. San Miguel na Muntiˏ   Talavera FMRˏ   Brgy. Umanganˏ   Aliaga and Brgy. San Miguel na Muntiˏ   Talaveraˏ   Nueva Ecija","region":null,"distanceM":2.0,"system":"Aliaga","fgisRegion":"UPRIIS","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:87351","title":"Construction of Concrete Road - Concreting of Brgy. Malabod to Kalonbarakˏ   Brgy. Poblacion FMRˏ   Brgy. Malabod and Brgy. Kalonbarakˏ   Malungonˏ   Sarangani","region":null,"distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:101863","title":"Construction of Concrete Road - Concreting of Brgy. Litlit FMRˏ   Brgy. Litlitˏ   Silangˏ   Cavite","region":null,"distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:91345","title":"Construction of Concrete Road - Concreting of Brgy. Pag-asa to Brgy. Conrazon FMRˏ   Brgy. Pag-asa and Brgy. Conrazonˏ   Bansudˏ   Oriental Mindoro","region":null,"distanceM":980.8,"system":"Bansud","fgisRegion":"Region IV-B","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:115898","title":"Construction of Concrete Road - Concreting of Brgy. Taytay FMRˏ   Brgy. Taytayˏ   Majayjayˏ   Laguna","region":null,"distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:121465","title":"Construction of Concrete Road - Concreting of Brgy. IIˏ   FMR Brgy. IIˏ   Daetˏ   Camarines Norte","region":null,"distanceM":80.1,"system":"Daet Talisay","fgisRegion":"Region V","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2024:157623","title":"Construction of Concrete Road - Concreting of Sitio Rawis, Brgy. Amandayehan to Brgy. San Antonio (Coastal Road) FMR, Basey, Samar","region":null,"distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2025:24718","title":"Construction of Concrete Road - Concreting of Brgy. Camanchiles FMR, Brgy. Camanchiles, Matanao, Davao del Sur","region":null,"distanceM":2824.7,"system":"Padada","fgisRegion":"Region XI","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"},{"id":"da-fmr-2025:75575","title":"Construction of Concrete Road - Concreting of Sitio Palacasam to Sitio Alnamang, Brgy. Palkan FMR, Brgy. Palkan, \rPolomolok, South Cotabato","region":null,"distanceM":null,"system":"","fgisRegion":"","source":"FGIS canal network · straight-line source route to mapped canal; local coverage only"}],"niaLineItems":[{"id":"house_only:ib:p910:r14","title":"Dupitac CIS: Construction of Sabo Dam","psgc":"0102818010","municipality":"Piddig","province":"Ilocos Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p910:r13","title":"Estancia CIS: Construction of Sabo Dam","psgc":"0102818011","municipality":"Piddig","province":"Ilocos Norte","program":"","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p924:r12","title":"Cagayan-River Jones Clustered PIP: construction of pump house, pump sump, irrigation facilities","psgc":"0203115000","municipality":"Jones","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y407:ib:p933:r7","title":"Libmanan PIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0501718000","municipality":"Libmanan","province":"Camarines Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y235:ib:p924:r10","title":"Alibad CPIP: Conversion to Solar-Powered with AI Monitoring System","psgc":"0203131001","municipality":"San Mariano","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p899:r1","title":"Bonga Pump No. 2 PIS: Construction of Protection Works (Groundsill)","psgc":"0102812000","municipality":"City of Laoag","province":"Ilocos Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y327:ib:p935:r13","title":"Catubig PIS: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0804806000","municipality":"Catubig","province":"Northern Samar","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 8/RESTONIS-CATUBIG-21.250M.pdf","matchedTerms":["catubig"]}]},{"id":"house_only:ib:p919:r2","title":"LIBMANAN PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote","psgc":"0501718000","municipality":"Libmanan","province":"Camarines Sur","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["libmanan","pump"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r2","title":"Labangan RIS: Installation of Interlocking Concrete Blocks (I-Blocks) Downstream of Bokong Dam and Construction of Slope Protection along the Left Bank, Upstream and Downstream portion of Bokong Dam","psgc":"0907312000","municipality":"Labangan","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 9/1. REPAIRNIS-LABRIS-200M/LABANGAN-REPAIR NIS.jpg","matchedTerms":["labangan"]}]},{"id":"pair:nep-nia-p20-y214:ib:p924:r9","title":"Lapogan CPIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0203137024","municipality":"Tumauini","province":"Cagayan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y213:ib:p938:r15","title":"Mamil Pump Irrigation Project, Cagayan","psgc":"0201512001","municipality":"Enrile","province":"Cagayan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y166:ib:p898:r13","title":"Maridagao River Irrigation System Improvement Project: Construction of Flood Road Dike along Pulangui River, Irrigation and Drainage Facilities, Access Roads, and Solar Pumps","psgc":"1908816000","municipality":"Pagalungan","province":"Maguindanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y115:ib:p905:r10","title":"PDRIS (Cong Dadong Dam): Improvement of Diversion Works and Embankment Formation upstream area of Cong Dadong Dam","psgc":"0305403000","municipality":"Arayat","province":"Pampanga","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/RESTONIS-PDRIS VIRGEN DAM-P200M/POW Virgen 200M.pdf","matchedTerms":["dam","pdris"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/RESTONIS-PDRIS VIRGEN DAM-P200M/Picture/Pictures - PDRIS Virgen Dam 200m.pdf","matchedTerms":["dam","pdris"]}]},{"id":"pair:nep-nia-p07-y147:ib:p905:r11","title":"PDRIS (Virgen Dam): Repair and Rehabilitation of Virgen Dam and Improvement of Irrigation Facilities","psgc":"0305405000","municipality":"Candaba","province":"Pampanga","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/RESTONIS-PDRIS VIRGEN DAM-P200M/POW Virgen 200M.pdf","matchedTerms":["dam","pdris","virgen"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/RESTONIS-PDRIS VIRGEN DAM-P200M/Picture/Pictures - PDRIS Virgen Dam 200m.pdf","matchedTerms":["dam","pdris","virgen"]}]},{"id":"house_only:ib:p903:r4","title":"Pulangui RIS: Sedimentation Control and Irrigaion Project","psgc":"1001310001","municipality":"Lantapan","province":"Bukidnon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y234:ib:p938:r16","title":"Santa Maria Pump Irrigation Project, Cagayan","psgc":"0203134000","municipality":"Santa Maria","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p907:r8","title":"Lambayong RIS: 1. Construction of Check and weir and 4 km lined canal at New Sebu Area 2. Remove and Replace of 4 intake gate of Lambayong RIS Main Canal 3. Construction of 1.5KM Protection Dike at New Sebu area 4. Installation of 4 units solar powered pump with complete accessories 5. Construction of Canal Lining at Pidtiguian Area Sta. 0+000 - 2+400 (L= 2.4 km)","psgc":"1206508015","municipality":"Lambayong","province":"Sultan Kudarat","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p916:r16","title":"Gappal CPIS: Construction of 7.5 HP solar PV submersible pumping system (Phase 03)","psgc":"0203108037","municipality":"City of Cauayan","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p16-y297:ib:p918:r19","title":"BONGA PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"0102821000","municipality":"Sarrat","province":"Ilocos Norte","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p924:r11","title":"Dibuluan RIP: Solar pumping irrigation project and rehabilitation of irrigation facilities","psgc":"0203127000","municipality":"San Agustin","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/Annexes_rev06.pdf","score":1.0,"matchedTerms":["dibuluan","rip"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p916:r17","title":"Gappal CPIS: Construction of 7.5 HP solar PV submersible pumping system (Phase 04)","psgc":"0203108037","municipality":"City of Cauayan","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p926:r9","title":"Magat RIS: Water-use Optimization and Restoration Initiative along the Ganano River thru CONSTRUCTION OF ONE (1) UNIT(S) (250 HP) SOLAR POWERED IRRIGATION PROJECT WITH IRRIGATION FACILITIES at Brgy. Buneg, Echague, Isabela Augmented Area=(800 Ha)","psgc":"0203112008","municipality":"Echague","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y666:ib:p899:r14","title":"Mallig RIS: Construction of Slope Protection at Mallig Dam Intake and Construction of Slope Protection at Casili Dam Intake","psgc":"0203119000","municipality":"Mallig","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y214:ib:p904:r7","title":"Sta. Felomina CIS: Repair & Completion of Dam with its Appurtenant Structures","psgc":"1606819000","municipality":"City of Tandag","province":"Surigao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r6","title":"Pulangi RIS: Pulangi River Sedimentation Control and Irrigation Project Phase 2 Package A","psgc":"1001310001","municipality":"Lantapan","province":"Bukidnon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r7","title":"Pulangi RIS: Pulangi River Sedimentation Control and Irrigation Project Phase 2 Package B","psgc":"1001310001","municipality":"Lantapan","province":"Bukidnon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r5","title":"Roxas Kuya RIS: Rehabilitation of Roxas Kuya Main Diversion Structure","psgc":"1001315000","municipality":"Maramag","province":"Bukidnon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 1 - INVENTORY OF IRRIGATION SYSTEMS (BUKIDNON IMO).pdf","score":1.0,"matchedTerms":["kuya","roxas"]},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 10 - IRRIGATION SYSTEM MAINTENANCE PLAN.pdf","score":1.0,"matchedTerms":["kuya","roxas"]},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 2- NIS SYSTEM DATA SHEET AND ASSESSMENT.pdf","score":1.0,"matchedTerms":["kuya","roxas"]},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 8 - 5 YEAR O&M DEVELOPMENT PLAN.pdf","score":1.0,"matchedTerms":["kuya","roxas"]},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X- ANNEX 7.xlsx","score":1.0,"matchedTerms":["kuya","roxas"]},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/R10-RIMP-WORKING FILE-0726.pdf","score":1.0,"matchedTerms":["kuya","roxas"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y643:ib:p912:r5","title":"San Martin CIS: Construction of Slope Protection and Improvement of Intake Structure including various facilities","psgc":"0306905034","municipality":"Concepcion","province":"Tarlac","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y208:ib:p900:r8","title":"Aliaga IS: Repair of Scoured Embankment @ Santiago Dam, Construction of Concrete Lining @ Lateral Am and Lateral Am Supply Canal","psgc":"0304901036","municipality":"Aliaga","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/UPRIIS/REPAIR OF NIS/RNIS-ALIAGA IS- SANTIAGO-ALIAGA-100M.pdf","matchedTerms":["aliaga","santiago"]}]},{"id":"pair:nep-nia-p04-y82:ib:p900:r2","title":"Angat Maasim RIS: Improvement of Bitukang Manok Creek, Lateral C, Lateral C-Extra and various irrigation facilities","psgc":"0305405000","municipality":"Candaba","province":"Pampanga","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["angat","maasim"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y254:ib:p938:r17","title":"Catugan Pump Irrigation Project, Cagayan","psgc":"0201516012","municipality":"Lal-Lo","province":"Cagayan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r1","title":"Jicontol IS: Repair/Rehab of Irrigation Facilities and Solar-Powered Pump Irrigation System","psgc":"0802606013","municipality":"Dolores","province":"Eastern Samar","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y683:ib:p936:r15","title":"KIBUNGSOD, CABANTIAN, CABUBUHAN, CALIN-UBAN, LILO & BINALBALAN SPIP: Establishment of Ten (10) Units of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1004317000","municipality":"Magsaysay","province":"Misamis Oriental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p899:r19","title":"Magat RIS: Furnish and Installation of type II U-shaped Sheet Pile through Rehabilitation of Scoured Embankment along Approach Channel of PS No. 1 Left and Right Side","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p901:r3","title":"PRIS-SDC PH2: Construction of Re-Use Check Structure and Desilting of Ambassador Creek","psgc":"0304918002","municipality":"Nampicuan","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r8","title":"Pulangi RIS: Pulangi River Sedimentation Control and Irrigation Project Phase 2 Package C","psgc":"1001321000","municipality":"City of Valencia","province":"Bukidnon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p901:r4","title":"Quipot IS: Construction of Canal Lining, Canal Structures and Other Irrigation Faciities","psgc":"0405608000","municipality":"Candelaria","province":"Quezon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y197:ib:p898:r14","title":"Rehabilitation and Protection of Watershed Management","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r6","title":"STRIS (Cavite Dam): Repair/Improvement of Cavite Diversion Dam and Canal Lining and Service Road at Main Canal Sta. 0+000-0+700","psgc":"0307104000","municipality":"Castillejos","province":"Zambales","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y193:ib:p904:r6","title":"Tago RIS: Repair of Irrigation Canal","psgc":"1606818000","municipality":"Tago","province":"Surigao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r4","title":"MCIS: Construction of Solar-Powered Pump and Appurtenant Structures","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p16-y541:ib:p919:r1","title":"DAMBO PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"0403414000","municipality":"Mabitac","province":"Laguna","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r13","title":"Balingasag RIS: Extension of Slope Protection, Left Side, Sta. 0+046 to 0+500","psgc":"1004302000","municipality":"Balingasag","province":"Misamis Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-NIS/Resto-NIS_Balingasag-RIS_12.5M_POW.pdf","matchedTerms":["balingasag"]}]},{"id":"house_only:ib:p903:r14","title":"Balingasag RIS: Extension of Slope Protection, Left Side, Sta. 0+500 to 1+015","psgc":"1004302001","municipality":"Balingasag","province":"Misamis Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-NIS/Resto-NIS_Balingasag-RIS_12.5M_POW.pdf","matchedTerms":["balingasag"]}]},{"id":"house_only:ib:p903:r12","title":"Balingasag RIS: Rehabilitation of Slope Protection, Left Downstream, Sta. 0+000 to 0+100","psgc":"1004302002","municipality":"Balingasag","province":"Misamis Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-NIS/Resto-NIS_Balingasag-RIS_12.5M_POW.pdf","matchedTerms":["balingasag"]}]},{"id":"pair:nep-nia-p18-y539:ib:p921:r14","title":"Buduan PCIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0102806007","municipality":"Burgos","province":"Ilocos Norte","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y502:ib:p925:r3","title":"CPPL PILOT SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203116005","municipality":"Luna","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y234:ib:p922:r6","title":"Canit SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1401113000","municipality":"Tuba","province":"Benguet","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p935:r14","title":"Gandara-San Jorge SPIP: Construction/ Installation of Solar Pump Irrigation System and Its Irrigation Facilities","psgc":"0806007000","municipality":"Gandara","province":"Samar","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y204:ib:p922:r5","title":"Maniana SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y173:ib:p925:r15","title":"Ramon Ragsak SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p916:r4","title":"Sta. Felomina Cis: Completion of Diversion Dam","psgc":"1606819000","municipality":"City of Tandag","province":"Surigao del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r3","title":"VCIS/LTRIS: Construction of Solar-Powered Pump and Appurtenant Structures","psgc":"0304930000","municipality":"Talavera","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/FINAL REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["ltris","vcis"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r15","title":"ALIAGA IS: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System in Brgy. Macabucod","psgc":"0304901016","municipality":"Aliaga","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p915:r7","title":"Altubo-guinotang CIS: Repair & Extension of Slope Protection (L/D)","psgc":"1004301000","municipality":"Alubijid","province":"Misamis Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 9 - 3 YEAR IMPLEMENTATION PLAN FOR CIS.pdf","score":1.0,"matchedTerms":["altubo","guinotang"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p938:r14","title":"BITOON SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p915:r5","title":"Bal-ason CIS: Construction of Protection Dike along Main Canal, Sta. 0+100 to 0+225","psgc":"1004308006","municipality":"City of Gingoog","province":"Misamis Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 9 - 3 YEAR IMPLEMENTATION PLAN FOR CIS.pdf","score":1.0,"matchedTerms":["ason","bal"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p915:r6","title":"Bal-ason CIS: Construction of Protection Dike along Main Canal, Sta. 0+225 to 0+350","psgc":"1004308006","municipality":"City of Gingoog","province":"Misamis Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 9 - 3 YEAR IMPLEMENTATION PLAN FOR CIS.pdf","score":1.0,"matchedTerms":["ason","bal"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r9","title":"Balingasag RIS: Dam Revetment and Improvement with slope protection (Rosario Dam)","psgc":"1004302000","municipality":"Balingasag","province":"Misamis Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-NIS/Resto-NIS_Balingasag-RIS_12.5M_POW.pdf","matchedTerms":["balingasag"]}]},{"id":"house_only:ib:p903:r10","title":"Balingasag RIS: Rehabilitation of Slope Protection, Right Downstream, Sta. 0+000 to 0+100","psgc":"1004302000","municipality":"Balingasag","province":"Misamis Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-NIS/Resto-NIS_Balingasag-RIS_12.5M_POW.pdf","matchedTerms":["balingasag"]}]},{"id":"house_only:ib:p903:r11","title":"Balingasag RIS: Rehabilitation of Slope Protection, Right Downstream, Sta. 0+000 to 0+100","psgc":"1004302000","municipality":"Balingasag","province":"Misamis Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-NIS/Resto-NIS_Balingasag-RIS_12.5M_POW.pdf","matchedTerms":["balingasag"]}]},{"id":"pair:nep-nia-p12-y596:ib:p913:r13","title":"Cawayan CIS-BGTP: Rehabilitation of Diversion, Repair of 300 meters Embankment Protection, and Repair/Rehabiliration of Damaged Canals, and Concreting of Earth Canals","psgc":"0506216005","municipality":"City of Sorsogon","province":"Sorsogon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r10","title":"Construction of Concrete Canal Lining at lateral B-7, SDA, and Improvement of Drainage Waterway at Brgy. 1 & Pulong Bahay: Construction of Concrete Canal Lining at lateral B-7, SDA, and Improvement of Drainage Waterway at Brgy. 1 & Pulong Bahay","psgc":"0304922012","municipality":"Quezon","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y464:ib:p926:r10","title":"Dumatata PIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r3","title":"Gaulan IP: Construction of Irrigation Structure","psgc":"0908303006","municipality":"Diplahan","province":"Zamboanga Sibugay","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p936:r17","title":"KAPAI SPIP: Construction of solar power pump, canal lining, and its solar panel facilities and other structures","psgc":"1903610000","municipality":"Kapai","province":"Lanao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y557:ib:p938:r6","title":"Kalipapa SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1908807009","municipality":"Datu Piang","province":"Maguindanao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y668:ib:p903:r17","title":"Kipaliku RIS: Repair and Rehabilitation of Existing Embankment in Lunga-og Dam Upstream Left Side","psgc":"1102318007","municipality":"Santo Tomas","province":"Davao del Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y330:ib:p898:r20","title":"Laoag-Vintar RIS: Improvement of Bacsil North Water Impounding System","psgc":"0102812003","municipality":"City of Laoag ","province":"Ilocos Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y617:ib:p903:r15","title":"Lasang RIS: Repair and Rehabilitation of Existing Embankment in Tuganay Creek Junction Drainage 60 Structure","psgc":"1102315021","municipality":"City of Panabo","province":"Davao del Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y648:ib:p903:r16","title":"Libuganon RIS: Repair and Rehabilitation of Existing Embankment in Magcreek Brgy. Salvacion","psgc":"1102303023","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y357:ib:p926:r4","title":"Licaray PIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y537:ib:p938:r5","title":"Liong SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y101:ib:p932:r18","title":"Lubang Island SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705104000","municipality":"Lubang","province":"Occidental Mindoro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p899:r15","title":"Mallig River Irrigation System: Construction of Gabion Slope Protection and CHB Canal Lining at Lateral D1; Construction of Concrete Slope Protection at Casili Diversion Dam and Lateral B; Construction of Concrete Canal Lining at Main Canal, Lateral A, and Lateral D; Construction of CHB Canal Lining at Lateral B2; Construction of Pipeline at Main Canal; and Construction of Canal Structures at Lateral A and Lateral B2","psgc":"0203119003","municipality":"Mallig","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p915:r8","title":"Mat-I CIS: Repair & Extension of Slope Protection (L/D)","psgc":"1705912000","municipality":"San Andres","province":"Romblon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p912:r6","title":"Natividad CIS: Improvement of irrigation facilities","psgc":"0305407008","municipality":"Guagua","province":"Pampanga","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r14","title":"PBRIS EXTN: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System in Brgy. San Isidro","psgc":"0304932020","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/FINAL REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["extn","pbris"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y401:ib:p926:r6","title":"Patanad PIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0203129006","municipality":"San Isidro","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y569:ib:p921:r15","title":"Pulangi SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y380:ib:p926:r5","title":"Quitbayag PIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p932:r4","title":"San Vicente SPIP: Establishment of Solar-Powered Pump Irrigation Project","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y172:ib:p938:r13","title":"TARUSAN PCIS: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1606809038","municipality":"Hinatuan","province":"Surigao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y145:ib:p900:r4","title":"TASMORIS (Tarlac RIS): Improvement of Facilities of TASMORIS-Lacson Canal and Road improvement along Lacson Canal, Lacson Creek & Lateral B","psgc":"0306916000","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r7","title":"TASMORIS (Tarlac RIS): Improvement of Irrigation Facilities of TASMORIS – Lacson Canal (Sta. 0+326 – 0+636); Slope Protection at Lacson Creek (Sta. 0+000 – 1+046); and Road Improvement along Lacson Canal (Sta. 0+150 – 0+636), Lacson Creek (Sta. 0+000 – 0+414), and Latent B (Sta. 5+650 – 6+550)","psgc":"0306916000","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y151:ib:p938:r12","title":"TISIBONPA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y554:ib:p899:r10","title":"Visitacion IS: Construction of Embankment Protection with Steel Sheet Pile","psgc":"0201523003","municipality":"Santa Ana","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y610:ib:p921:r17","title":"Cabatuan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y82:ib:p922:r4","title":"Carusipan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0102905010","municipality":"Cabugan","province":"Ilocos Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y630:ib:p922:r1","title":"Ingunglo SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y550:ib:p929:r14","title":"PBRIS EXTN SPIP III: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p929:r15","title":"PBRIS EXTN SPIP IV: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y611:ib:p929:r16","title":"PBRIS EXTN SPIP V: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y651:ib:p922:r2","title":"Sangil SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y590:ib:p921:r16","title":"Sta. Elena SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y671:ib:p922:r3","title":"Tanap Avis Terruv SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0102806014","municipality":"Burgos","province":"Ilocos Norte","program":"R","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y530:ib:p911:r18","title":"Tanato CIS: Improvement of Canal System and Slope Protection Works (Main Canal Sta. 1+000 to Sta. 1+700)","psgc":"0300803000","municipality":"City of Balanga","province":"Bataan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p940:r16","title":"Cagaycay RIS: Construction of Palale Checkgate (Sta. 0+000.00), Main Canal (Sta. 0+000.00 - 1+000.00), and other Appurtenant Structures; Supply/Delivery/Installation/Testing/Commissioning of 2-units Solar Powered Pump, Engine, and Accessories and other Appurtenant Structures","psgc":"0501733016","municipality":"San Jose","province":"Camarines Sur","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y398:ib:p915:r1","title":"Kuguita Baylao Lumad CIS: Rehabilitation of Dam 0+000, Construction of Canal Lining and Structures","psgc":"1001804007","municipality":"Mambajao ","province":"Camiguin","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p914:r18","title":"LANAWAN SIP: Rehabilitation of Diversion Works, Canalization and Canal Structures","psgc":"0907213000","municipality":"Salug","province":"Zamboanga del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y618:ib:p938:r8","title":"MALINGON SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1206510012","municipality":"President Quirino","province":"Sultan Kudarat","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"house_only:ib:p920:r15","title":"Magat RIS: Construction of 4-units 10hp Solar Powered Submersible Pumps at Cauayan City","psgc":"0203108000","municipality":"City of Cauayan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r1","title":"Magat RIS: Furnish and Install of Type II U shaped sheetpile through rehabilitation of Scoured Embankment along Macanao Creek, Cabatuan Isabela (Total Length= 102M)","psgc":"0203107000","municipality":"Cabatuan","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p937:r10","title":"Pantud CIS:Provision of Three (3) units Solar Powered Pump and Irrigation Facilities","psgc":"1108209000","municipality":"Nabunturan ","province":"Davao de Oro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y411:ib:p924:r18","title":"Sta. Luciana SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203108064","municipality":"City of Cauayan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r14","title":"Aliaga IS: Construction of Concrete Lining @ Lateral AM-5 Sta. 2+960 - 5+896","psgc":"0304901000","municipality":"Aliaga","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y713:ib:p936:r16","title":"KAPAI SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1903610000","municipality":"Kapai","province":"Lanao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y81:ib:p912:r13","title":"Lobo CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401015000","municipality":"Lobo","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y361:ib:p907:r3","title":"Lasang RIS: Embankment of Protection Dike along Lateral G, Establishment of Pump Irrigation Project, Concreting of Existing Earth Canal at Lateral G Sta. 0+000 - 2+600","psgc":"1102315021","municipality":"City of Panabo","province":"Davao del Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y380:ib:p924:r17","title":"BRD Irrigators SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p928:r1","title":"Bonifacio SPIP: Construction of Two (2) Units 15hp Drilled Solar-Powered Pump System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y193:ib:p927:r6","title":"Bonifacio SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p928:r3","title":"Colosboa SPIP: Construction of Two (2) Units 15hp Drilled Solar-Powered Pump System","psgc":"0304906015","municipality":"Cuyapo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y254:ib:p927:r8","title":"Colosboa SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304906015","municipality":"Cuyapo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y600:ib:p933:r14","title":"Dinapa SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p932:r3","title":"Guinhalinan CIP: Establishment of Solar-Powered Pump Irrigation Project","psgc":"1606801027","municipality":"Barobo","province":"Surigao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y423:ib:p926:r7","title":"Ingud Norte PIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0203102030","municipality":"Angadanan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y764:ib:p935:r4","title":"Jumangpas SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702240009","municipality":"Samboan","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p940:r13","title":"Magat-RIS: Construction of Canal Extension and Appurtenant Structures at RM3 Extension (620 meters), including the Provision and Installation of 1 Unit Modernized Submersible Pumping System","psgc":"0000000000","municipality":"","province":"","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y427:ib:p915:r2","title":"Mahinog CIS: Repair of Dam Sta. 0+000, Desiltation and Provision of Steel Gates and Repair of Canal Lining","psgc":"1001803000","municipality":"Mahinog","province":"Camiguin","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y561:ib:p911:r19","title":"Manimas CIS: Improvement of Canal System and Slope Protection Works (Lateral Canal Sta. 0+000 to Sta. 1+100)","psgc":"0300803000","municipality":"City of Balanga ","province":"Bataan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y285:ib:p929:r7","title":"PBRIS EXTN SPIP II: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y254:ib:p929:r6","title":"PBRIS EXTN SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y204:ib:p929:r5","title":"PRIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r6","title":"PRIS-SDC PH2: Construction of Solar Power Pump (Lennec)","psgc":"0304911031","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r3","title":"PRIS-SDC PH2: Construction of Solar Power Pump (Narvacan, Casongsong, Cavite)","psgc":"0304911043","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r4","title":"PRIS-SDC PH2: Construction of Solar Power Pump (San Miguel, Manggang Marikit)","psgc":"0304911054","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r5","title":"PRIS-SDC PH2: Construction of Solar Power Pump (San Rafael, Galvan, Partida I)","psgc":"0304911055","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p928:r2","title":"Paitan Sur SPIP: Construction of Two (2) Units 15hp Drilled Solar-Powered Pump System","psgc":"0304906037","municipality":"Cuyapo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y224:ib:p927:r7","title":"Paitan Sur SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304906037","municipality":"Cuyapo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y488:ib:p933:r10","title":"Pulanduta SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0504103020","municipality":"Balud","province":"Masbate","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y285:ib:p933:r3","title":"RIIS-RIDA SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0501706000","municipality":"Bula","province":"Camarines Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p926:r8","title":"RM5: Conversion to Solar-Powered with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p912:r4","title":"Repair and Rehabilitation of Diversion Works and Slope Protection Works Upstream and Downstream of Irrigation System at Brgy. Cupang","psgc":"0300803008","municipality":"City of Balanga","province":"Bataan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p907:r1","title":"Rugnan RIS: Construction of Lateral G-1 @ Sta. 0+000 - 1+200 and its Appurtenant Structures","psgc":"1903634000","municipality":"Maguing","province":"Lanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y347:ib:p935:r15","title":"SAN ISIDRO SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y356:ib:p927:r12","title":"Sabit PIP: Conversion to Solar-Powered with AI Monitoring System","psgc":"0304906041","municipality":"Cuyapo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y255:ib:p934:r5","title":"Sumacawe Murcia SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1804520000","municipality":"Murcia","province":"Negros Occidental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y375:ib:p919:r18","title":"Talifugo CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408102017","municipality":"Conner","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y296:ib:p926:r2","title":"Timek-Ti Mannalon SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"Ilocos Norte","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y621:ib:p933:r15","title":"Tiris SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0506208041","municipality":"Gubat","province":"Sorsogon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p899:r16","title":"Upper Chico RIS: Improvement of Irrigation Facilities","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y288:ib:p898:r18","title":"Upper Chico River Irrigation System: Protection works","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r17","title":"Zaragosa SPIP: Construction of 3-units Solar-Powered Pump with AI Satellite-Assisted Monitoring","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p901:r1","title":"PRIS-SDC PH2: Repair of Lateral S (Construction of Concrete Lining at Sta. 0+324.00 - Sta. 1+320.00, Sta. 2+200.00 - Sta. 3+265.95)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y558:ib:p920:r6","title":"Salvacion Maclit CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408105009","municipality":"Luna","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p907:r16","title":"Addalam River Irrigation System (ADRIS): Establishment of SMS Telemetered Rainfall/River Gauges and Sensors/Monitoring Equipment/Subscription, Supply and Installation of CCTV, IP Radio/VHF/Steel Gates","psgc":"0205701000","municipality":"Aglipay","province":"Quirino","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p30-y658:ib:p941:r2","title":"Alip RIS: Construction of Check Gate (Sedada), 1.175-km Canal Lining at Sta. 0+000 - 1+175 and 4-unit Canal Structures","psgc":"1908806000","municipality":"Datu Paglas","province":"Maguindanao del Sur","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y235:ib:p908:r2","title":"Dicamay CIS: Rehabilitation of Dam and Construction of Slope Protection","psgc":"0203115013","municipality":"Jones","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y689:ib:p941:r3","title":"Kabulnan RIS: Construction of stream check, 1.5 km Canal Lining at Sta. 0+000-1+500 and 5 unit Canal Structures","psgc":"1908803000","municipality":"Datu Abdullah Sangki","province":"Maguindanao del Sur","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r13","title":"PBRIS EXTN: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System in Brgy. H. Romero","psgc":"0304932009","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/FINAL REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["extn","pbris"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y702:ib:p930:r2","title":"PRIS SDC SPIP III: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p901:r2","title":"PRIS-SDC PH2: Repair of Sub-Lateral P-2 (Construction of Concrete Lining at Sta. 0+560 - Sta. 1+920.50)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y239:ib:p900:r9","title":"PRIS-SDC: Construction of Slope Protection at Nagpandayan Reservoir","psgc":"0304911042","municipality":"Guimba","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p906:r12","title":"Bayawan NIS: Repair of Main Canal (Sta. 1+350 - 1+780), Lateral A (Sta. 0+000 - 1+700), Lateral C (Sta. 0+000 - 2+130), Lateral B (Sta. 0+000 - 1+060) and Construction of Protection Works at Main Canal","psgc":"1804606000","municipality":"City of Bayawan","province":"Negros Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y677:ib:p905:r5","title":"Baligatan-DD: Modernization and Improvement of Existing Irrigation System","psgc":"0203124000","municipality":"Ramon","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y195:ib:p906:r14","title":"Catubig IS: Construction of Canal Lining and Appurtenant Structures along Catubig Right Main Canal (CRMC) Lateral 1 and Lateral 5","psgc":"0804810000","municipality":"Las Navas","province":"Northern Samar","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 8/RESTONIS-CATUBIG-21.250M.pdf","matchedTerms":["catubig"]}]},{"id":"pair:nep-nia-p08-y162:ib:p906:r13","title":"Jicontol IS: Repair/Improvement of the Dilapidated Canal Lining along the Trapezoidal Main, including the Removal and Replacement of Deteriorated CHB Canal Lining along Lateral A","psgc":"0802606013","municipality":"Dolores","province":"Eastern Samar","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p905:r6","title":"Baligatan DD: Restoration of Area thru Improvement of Irrigation Facility (Construction of Concrete Canal Lining at Lateral 9 Sta. 3+391 - 3+724 L=333m)","psgc":"0203124000","municipality":"Ramon","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y725:ib:p908:r14","title":"Balong Norte CIS: Concreting of Service Road w/ protection works","psgc":"1403213000","municipality":"City of Tabuk ","province":"Kalinga","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y472:ib:p899:r6","title":"Ambayoan RIS: Repair of Canal Lining @ ADRIS Main Canal (Sta. 4+000 - 4+585)","psgc":"0105539000","municipality":"Santa Maria","province":"Pangasinan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/REPAIRNIS-AMBAYOAN RIS-20.255M.pdf","matchedTerms":["ambayoan"]}]},{"id":"pair:nep-nia-p30-y463:ib:p940:r12","title":"Addalam River Irrigation System (ADRIS): Construction of Canal Lining and Canal Structures along J Extension","psgc":"0205701000","municipality":"Aglipay","province":"Quirino","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p12-y265:ib:p912:r22","title":"Angib CIS: Construction of Canal Lining and Repair of Dam","psgc":"0405606000","municipality":"Burdeos","province":"Quezon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y225:ib:p912:r20","title":"Ayuti CIS: Repair of Canal System","psgc":"0405623004","municipality":"Lucban","province":"Quezon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y490:ib:p936:r5","title":"BALANAGAN DIMATALING SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907305032","municipality":"Dimataling","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y408:ib:p936:r1","title":"BOGWAC CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907343000","municipality":"Guipos","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y754:ib:p912:r12","title":"Balimbing CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401020000","municipality":"Padre Garcia","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y326:ib:p927:r11","title":"Bibiclat CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304901004","municipality":"Aliaga","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p928:r6","title":"Bibiclat CIS: Modification of Aliaga Solar-Powered Pump System and Improvement of Canal System along Sta. 1+200 of M.C.","psgc":"0304901004","municipality":"Aliaga","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p912:r7","title":"Binagbag CIS: Repair of Slope Protection (Sta. 0+321 to 0+473.25)","psgc":"0301401003","municipality":"Angat","province":"Bulacan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p910:r15","title":"Bucao CIS: Modification of Dam, Repair of Canal Lining w/ Cover @ Sta. 2+850 - 4+390.00, MC","psgc":"0103315007","municipality":"San Gabriel","province":"La Union","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p932:r2","title":"Buenavista CIS: Establishment of Solar-Powered Pump Irrigation Project","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p923:r1","title":"Bulala SPIP: Construction of 2-units Solar-Powered Pump with AI Satellite-Assisted Monitoring","psgc":"1401112000","municipality":"Sablan","province":"Benguet","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y102:ib:p935:r6","title":"Cabungahan SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p927:r20","title":"Calancuasan PIS: Construction of Two (2) Units 10hp Drilled Solar-Powered Pump System","psgc":"0304906013","municipality":"Cuyapo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y600:ib:p932:r10","title":"Calapan City SPIP 2: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705205000","municipality":"City of Calapan ","province":"Oriental Mindoro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y569:ib:p932:r9","title":"Calapan City SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705205000","municipality":"City of Calapan ","province":"Oriental Mindoro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y683:ib:p935:r1","title":"Cambigong SPIP Extension: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702240005","municipality":"Samboan","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 2/MPIS_Extension NIS 5m.pdf","matchedTerms":["extension"]}]},{"id":"pair:nep-nia-p26-y744:ib:p935:r3","title":"Camburoy SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702240010","municipality":"Samboan","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y255:ib:p923:r2","title":"Capissayan Sur SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0201513016","municipality":"Gattaran","province":"Cagayan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y461:ib:p913:r6","title":"Centro Occidental CIS: Repair/Rehabilitation of Dam (Sta. 0+000.00) and Canalization works at Main Canal (Sta. 1+506.8 - 2+008)","psgc":"0500514013","municipality":"Polangui","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["centro","occidental"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_2 Summary of Identified Irrigation Projects per Municipality.xlsx","score":1.0,"matchedTerms":["centro","occidental"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_4. Detailed Damage_Losses_Recovery and Reconstruction Needs Agriculture and Fisheries Subsector.xlsx","score":1.0,"matchedTerms":["centro","occidental"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["polangui"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/PHOTOS-Cabangan-CIS-Polangui.pdf","matchedTerms":["polangui"]}]},{"id":"pair:nep-nia-p17-y426:ib:p920:r1","title":"Cuba SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1401108006","municipality":"Kapangan","province":"Benguet","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y561:ib:p936:r8","title":"DAGUM TIGUHA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907313029","municipality":"Lapuyan","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y302:ib:p919:r15","title":"Emilia SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408106025","municipality":"Pudtol","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p927:r19","title":"Gapumaca CIS: Construction of Two (2) Units 10hp Drilled Solar-Powered Pump System","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y619:ib:p920:r8","title":"Guinaang CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408102019","municipality":"Conner","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y485:ib:p926:r11","title":"Ibuna Planters SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0307705007","municipality":"Dingalan","province":"Aurora","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y478:ib:p915:r4","title":"Itom CIS: Repair of Dam and Construction of Canal Lining","psgc":"1001801000","municipality":"Catarman","province":"Camiguin","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y205:ib:p912:r19","title":"Kulapi CIS: Repair of Canal System","psgc":"0405623020","municipality":"Lucban","province":"Quezon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y388:ib:p935:r17","title":"LACIRA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907344000","municipality":"Tigbao","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y564:ib:p913:r9","title":"Lower Talisay CIS: Repair/Rehabilitation of Diversion Works and Slope Protection at downstream of Dam","psgc":"0500507014","municipality":"Libon","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["lower","talisay"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_4. Detailed Damage_Losses_Recovery and Reconstruction Needs Agriculture and Fisheries Subsector.xlsx","score":1.0,"matchedTerms":["lower","talisay"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/CY 2027 POW-DAET-TALISAY RIS- 5.2M.pdf","matchedTerms":["talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/PHOTOS-DTRIS-SERVICE ROADSNIS-5.2M.pdf","matchedTerms":["talisay"]}]},{"id":"house_only:ib:p919:r3","title":"Lungkuyab CIS: Pipeline Repair (1500m), Improvement of Solar Pumping System with Battery","psgc":"0730600000","municipality":"City of Cebu","province":"Cebu","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y540:ib:p936:r7","title":"MALA A TIGUHA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907313029","municipality":"Lapuyan","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y438:ib:p927:r16","title":"Macarse CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304932011","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y81:ib:p927:r2","title":"Macarse SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304932011","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y673:ib:p912:r8","title":"Matala CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401010012","municipality":"Ibaan","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y442:ib:p940:r11","title":"NVBIS: Construction of Canal Lining & Canal Structures","psgc":"0205003000","municipality":"Bagabag","province":"Nueva Vizcaya","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y164:ib:p912:r17","title":"Nagtaluntong CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401015000","municipality":"Lobo","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y734:ib:p912:r11","title":"Namuco CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401021025","municipality":"Rosario","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y641:ib:p934:r16","title":"Napo SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0701222026","municipality":"Garcia Hernandez","province":"Bohol","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y681:ib:p932:r13","title":"Naujan SPIP 2: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705208000","municipality":"Naujan","province":"Oriental Mindoro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y742:ib:p932:r15","title":"Naujan SPIP 4: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705208000","municipality":"Naujan","province":"Oriental Mindoro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y723:ib:p935:r2","title":"Nug-as III SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702202004","municipality":"Alcoy","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y112:ib:p938:r10","title":"PALASAO SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1606805013","municipality":"Cantilan","province":"Surigao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y132:ib:p938:r11","title":"PARMATICA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1606805000","municipality":"Cantilan","province":"Surigao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y672:ib:p930:r1","title":"PRIS SDC SPIP II: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304911000","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y641:ib:p929:r17","title":"PRIS SDC SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304911000","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r7","title":"PRIS-SDC PH2: Construction of Solar Power Pump (San Agustin)","psgc":"0304911050","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r18","title":"PRIS-SDC: Construction of Solar-Powered Pump at Brgy. Calem (BM Capuso IA)","psgc":"0304911017","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r16","title":"PRIS-SDC: Construction of Solar-Powered Pump at Brgy. Cavite (MTG Pliviriscaf IA)","psgc":"0304911022","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r17","title":"PRIS-SDC: Construction of Solar-Powered Pump at Brgy. Subol (BM Capuso IA)","psgc":"0304911064","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r2","title":"PRIS-SDC: Construction of Solar-Powered Pump at Bunol (Glorya sa Bagong Milenyo IA)","psgc":"0304911070","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r1","title":"PRIS-SDC: Construction of Solar-Powered Pump at Culong (Glorya sa Bagong Milenyo IA)","psgc":"0304911025","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y630:ib:p932:r11","title":"Pola SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y714:ib:p912:r10","title":"Quilo-Quilo CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401020024","municipality":"Padre Garcia","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y367:ib:p935:r16","title":"REGLA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907343015","municipality":"Guipos","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y162:ib:p927:r5","title":"Rio Chico SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y649:ib:p920:r9","title":"Ripang CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408102015","municipality":"Conner","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y520:ib:p936:r6","title":"SEKABADA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907343000","municipality":"Guipos","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y694:ib:p912:r9","title":"San Ignacio CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401021040","municipality":"Rosario","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y142:ib:p927:r4","title":"San Joseph PIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y539:ib:p932:r8","title":"San Teodoro SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0401006038","municipality":"Bauan","province":"Batangas","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p917:r15","title":"San Vicente Balingbing CIS: Restoration of Lead Canal damaged by Typhoon Kristine (Pipeline) (STA. 0+000.00 to STA.0+304.00) with Slope Protection Works","psgc":"0501725023","municipality":"Ocampo","province":"Camarines Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y662:ib:p934:r17","title":"Siningbahan SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p919:r4","title":"Sinsin CIS: Repair of Pipelines (600m), Improvement of Solar Pumping System with Battery","psgc":"0730600073","municipality":"City of Cebu","province":"Cebu","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y468:ib:p927:r17","title":"Sitio Alurma SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304919016","municipality":"City of Palayan","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["sitio","spip"]}]},{"id":"house_only:ib:p900:r13","title":"TRIS Lower: Improvement of Cojuangco Dam and Lateral G-2 (Sta. 1+438.10+635.49)","psgc":"0304930000","municipality":"Talavera","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p897:r9","title":"Tigman-Hinagyanan-Inarihan RIS: Concreting of Service Road along Lateral C1 (Sta.1+519 - 3+237)","psgc":"0501704000","municipality":"Bombon","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_2 Summary of Identified Irrigation Projects per Municipality.xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/R5_ANNEX D - INVESTMENT PROGRAM [Annex 5 v Main Document Write Up] (1).xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y184:ib:p912:r18","title":"Tinamnan CIS: Repair of Canal System","psgc":"0405623032","municipality":"Lucban","province":"Quezon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y557:ib:p906:r5","title":"Barit RIS: Restoration of Canal Lining and Canal Structures (RAMC 27B, RALAT A2-13, RALAT A2-14) Sta. 0+000.00 - Sta. 0+500.00, RAMC 27A or Lateral I Sta. 0+000.00 - 0+500.00","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p907:r7","title":"Lambayong: 1. Construction of 1 km Canal Lining at Pasamic (Sta. 4+691 - 5+691) 2. Supply and Installation of Pasamic 3 - Units Sluice Gates 3. Construction of 5 units Canal Structures and 6 Terminal Facilities","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p905:r18","title":"Baco-Bucayao RIS: Proposed Concreting of Earth Canal (Sta. 3+753 - 4+540) Lateral B2a & Proposed concreting of earth canal (0+980 - 1+633) Lateral C3","psgc":"1705208000","municipality":"Naujan","province":"Oriental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 6_FSDE-MASTERPLAN_JULY-25-2024.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 10 Maintenance-Plan-Actual.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 12.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 2.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 23-27.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y601:ib:p934:r14","title":"Moabog SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702236007","municipality":"Pilar","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p898:r16","title":"Hapid Irrigation System: Repair/Rehabilitation of Canal Lining","psgc":"1402705004","municipality":"Lamut","province":"Ifugao","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y216:ib:p898:r15","title":"Abra River Irrigation System: Repair of Canal Lining along the Diversion Canal, Sub-lateral Canal along the Lateral Canal and Appurtenant Structures","psgc":"1400124000","municipality":"Tayum","province":"Abra","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r11","title":"TRIS Lower: Concrete Canal Lining at Lateral F-1A, SDA @ Sta. 2+455.26 - 3+473.87 and Rehabilitation of Steel Gates","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y716:ib:p918:r11","title":"Kidampas-Ampianga CIS: Construction of Damage Elevated Flume with Protection Structure Dam Repair Sta 0+000, Canal Repair, and Desiltation of Dam","psgc":"1004323002","municipality":"Sugbongcogon","province":"Misamis Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 9 - 3 YEAR IMPLEMENTATION PLAN FOR CIS.pdf","score":1.0,"matchedTerms":["ampianga","kidampas"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-CIS/Resto-CIS_KIDAMPAS-AMPIANGA CIS_16.6M_PHOTOS.pdf","matchedTerms":["ampianga","kidampas"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-CIS/Resto-CIS_KIDAMPAS-AMPIANGA CIS_16.6M_POW.pdf","matchedTerms":["ampianga","kidampas"]}]},{"id":"pair:nep-nia-p29-y515:ib:p939:r10","title":"Tayabas SIP: Construction of Diversion Works and Canal System","psgc":"0405647000","municipality":"City of Tayabas","province":"Quezon","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p907:r4","title":"Maridagao RIS: 1. Concreting of Canal along lateral E 0+000 - 0+700 (UMSA at DALFIA) 2. Desilting at Lateral Drainage from Pulangi River to Lateral A1 (BAGONABATI IA)","psgc":"1204712000","municipality":"Pikit","province":"Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y379:ib:p902:r9","title":"Can-asujan SRIS: Repair of Siphon at Lateral D with a total length of 729 meters at Sta. 0+000 to 0+160 & Sta. 0+951 to 1+020 & lateral canal at along Sta. 0+000 to 0+500","psgc":"0702214004","municipality":"City of Carcar","province":"Cebu","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p935:r11","title":"Cerdeña SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702229005","municipality":"Malabuyoc","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y747:ib:p908:r15","title":"Dodoan CIS: Road Opening and Construction of PCCP","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p908:r12","title":"Nakidol Creek-Poblacion CIS: Concreting of the 0.410 KM Service Road and Protection Structure from the Poblacion Provincial Road leading to the diversion structure of the Nakidol Creek Poblacion CIS and Construction of culvert","psgc":"1401105013","municipality":"Buguias","province":"Benguet","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y645:ib:p908:r11","title":"Consuelo CIS: Concreting of Service Road","psgc":"1408107000","municipality":"Santa Marcela","province":"Apayao","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/CAR/SERVICEROADSCIS-CONSUELO CIS-15.4M/PICTURES/Consuelo CIS Picture 1.jpg","matchedTerms":["consuelo"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/CAR/SERVICEROADSCIS-CONSUELO CIS-15.4M/PICTURES/Consuelo CIS Picture 2.jpg","matchedTerms":["consuelo"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/CAR/SERVICEROADSCIS-CONSUELO CIS-15.4M/POW/SERVICEROADSCIS-CONSUELO CIS-15.4M.pdf","matchedTerms":["consuelo"]}]},{"id":"pair:nep-nia-p21-y698:ib:p926:r19","title":"Abo-Baras SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y729:ib:p927:r1","title":"Abo-Ibayo SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y284:ib:p921:r3","title":"Alibangbang Liwan West: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403211007","municipality":"Rizal","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y357:ib:p923:r6","title":"Aneg SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203118003","municipality":"Delfin Albano","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y693:ib:p924:r2","title":"Antagan 1st SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203137002","municipality":"Tumauini","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p936:r9","title":"BALAKAN PIP: Construction of Mounting Structures, Control Room, Security Fence, Pipeline and Canal Structures, Installation of Solar Pump System, Fertigation System and AI Satellite Assisted Monitoring System","psgc":"0907213002","municipality":"Salug","province":"Zamboanga del Norte","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y316:ib:p933:r4","title":"Bagadion SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0501718004","municipality":"Libmanan","province":"Camarines Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p910:r18","title":"Bakes-Balbalayang CIS: Construction of Elevated Flume @ Sta. 0+833.00 - 0+938.60, MC","psgc":"0103315004","municipality":"San Gabriel","province":"La Union","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y112:ib:p924:r5","title":"Bantug Lungkot SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203137009","municipality":"Tumauini","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y203:ib:p931:r19","title":"Barangay Bislian Munti SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0405636006","municipality":"Polillo","province":"Quezon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y233:ib:p931:r20","title":"Barangay Camohaguin SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0405619014","municipality":"Gumaca","province":"Quezon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y264:ib:p931:r21","title":"Barangay Mabunga SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0405619027","municipality":"Gumaca","province":"Quezon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-MABUNGA-15M-PERTCPM.pdf","matchedTerms":["mabunga"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-MABUNGA-15M-PIC1.jpg","matchedTerms":["mabunga"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-MABUNGA-15M-PIC2.jpg","matchedTerms":["mabunga"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-MABUNGA-15M.pdf","matchedTerms":["mabunga"]}]},{"id":"pair:nep-nia-p24-y295:ib:p932:r1","title":"Barangay Talaan Aplaya SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0405645042","municipality":"Sariaya","province":"Quezon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p913:r5","title":"Basud Magurang (HRISIA) CIS: Repair/Rehabilitation of Right Main Canal (Sta. 0+514 - 1+323), Lateral A of Right Main Canal (Sta. 0+200 - 0+260) and Left Main Canal (Sta. 0+146 - 0+350)","psgc":"0500514031","municipality":"Polangui","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["basud","hrisia","magurang"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["polangui"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/PHOTOS-Cabangan-CIS-Polangui.pdf","matchedTerms":["polangui"]}]},{"id":"pair:nep-nia-p18-y447:ib:p921:r10","title":"Bawac SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403214015","municipality":"Tanudan","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y632:ib:p923:r16","title":"Bubug SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203136008","municipality":"Santo Tomas","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p913:r7","title":"Buhay na Kudos CIS: Repair/Rehabilitation of Diversion Works (Falling Shutter Dam at Sta. 0+000), Slope Protection works at Upstream, Left and Right Side of Dam, and Canalization Works at Lateral A of Right Main Canal (Sta. 0+200 - 0+250)","psgc":"0500514000","municipality":"Polangui","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["buhay","kudos"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_4. Detailed Damage_Losses_Recovery and Reconstruction Needs Agriculture and Fisheries Subsector.xlsx","score":1.0,"matchedTerms":["buhay","kudos"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["polangui"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/PHOTOS-Cabangan-CIS-Polangui.pdf","matchedTerms":["polangui"]}]},{"id":"pair:nep-nia-p21-y647:ib:p926:r17","title":"Bunay SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y570:ib:p933:r13","title":"Burabod SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y519:ib:p933:r11","title":"Butag SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0506203014","municipality":"Butag","province":"Sorsogon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y617:ib:p926:r16","title":"Cabago SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y398:ib:p913:r4","title":"Cabangan CIS: Repair/rehabilitation of Slope Protection at Upstream, Right side (Sta. 0+010.30 - 0+141.00)","psgc":"0307102000","municipality":"Cabangan","province":"Zambales","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/CABANGAN-CIS-CY-2027-POW-15M.pdf","matchedTerms":["cabangan"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["cabangan"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/PHOTOS-Cabangan-CIS-Polangui.pdf","matchedTerms":["cabangan"]}]},{"id":"house_only:ib:p938:r18","title":"Cabunga-an CIS: Establishment of Pump (Augmentation)","psgc":"0701225007","municipality":"Jagna","province":"Bohol","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y427:ib:p921:r9","title":"Cagwayan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r8","title":"Cahigam SPIP: Construction of a Water Source and Pump Facilities","psgc":"0401021008","municipality":"Rosario","province":"Batangas","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p914:r15","title":"Calambis-Mapula CIS: Repair/Improvement of Diversion works & canal system","psgc":"0807804000","municipality":"Caibiran","province":"Biliran","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/ANNEX 5 (2.7.25).xlsx","score":1.0,"matchedTerms":["calambis","mapula"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y378:ib:p923:r7","title":"Calinigan Sur SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203136032","municipality":"Santo Tomas","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y560:ib:p934:r12","title":"Calmante SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702253002","municipality":"Tudela","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y176:ib:p905:r12","title":"Camiling RIS: Improvement of Canal System (Sta. 0+100 - 1+994.35), Canal Structures at Lateral H","psgc":"0306903000","municipality":"Camiling","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y81:ib:p935:r5","title":"Can-abujon SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702239002","municipality":"Ronda","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y622:ib:p934:r15","title":"Candulawan SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0504105005","municipality":"Cataingan","province":"Masbate","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y499:ib:p934:r11","title":"Cansalo-ay SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702235009","municipality":"Oslob","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y590:ib:p928:r10","title":"Cansinala SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0305402004","municipality":"Apalit","province":"Pampanga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p923:r8","title":"Carmencita SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0305406008","municipality":"Floridablanca","province":"Pampanga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y459:ib:p923:r10","title":"Casalatan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203108019","municipality":"City of Cauayan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y346:ib:p933:r5","title":"Catalotoan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0501733008","municipality":"San Jose","province":"Camarines Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y428:ib:p933:r8","title":"Cawayan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0504106000","municipality":"Cawayan","province":"Masbate","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y163:ib:p907:r15","title":"Colocol INIS: Improvement of Intake","psgc":"0205005000","municipality":"Bayombong","province":"Nueva Vizcaya","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 2/Climate Change-NIS_Colocol INIS_15M.pdf","matchedTerms":["colocol","inis"]}]},{"id":"pair:nep-nia-p20-y143:ib:p924:r6","title":"Concepcion SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y80:ib:p920:r12","title":"Curiwet Banaba SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203122011","municipality":"Quezon","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y581:ib:p934:r13","title":"Daan Secante SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702253003","municipality":"Tudela","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y173:ib:p934:r2","title":"Dalid SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y406:ib:p921:r8","title":"Dugpa SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403209011","municipality":"Pinukpuk","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p937:r1","title":"Establishment of Solar Pump Irrigation Project in Brgy. Balubal","psgc":"1030500004","municipality":"City of Cagayan de Oro","province":"Misamis Oriental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p937:r2","title":"Establishment of Solar Pump Irrigation Project in Brgy. Puerto","psgc":"1030500063","municipality":"City of Cagayan de Oro","province":"Misamis Oriental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y652:ib:p923:r17","title":"Gapal SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203108037","municipality":"City of Cauayan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y172:ib:p920:r16","title":"Green Valley SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0201517000","municipality":"Lasam","province":"Cagayan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p902:r16","title":"Guinarona RIS - Tabontabon: Repair of irrigation facilities","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y377:ib:p933:r6","title":"HARBFA SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1804518000","municipality":"Manapla","province":"Negros Occidental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y681:ib:p907:r11","title":"Iguig Alcala Amulung Pump Irrigation System: Improvement of Amulung Intake Pilot Channel","psgc":"0201504000","municipality":"Amulung","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y202:ib:p920:r17","title":"Kapayapaan Liwan West SPIP: : Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403211007","municipality":"Rizal","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y586:ib:p926:r15","title":"Kaypian SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y467:ib:p921:r11","title":"Kilong Tubod SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y122:ib:p935:r7","title":"Kulansihan SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1001310000","municipality":"Lantapan","province":"Bukidnon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y621:ib:p928:r11","title":"Lab CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y314:ib:p921:r4","title":"Lacnog SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403213038","municipality":"City of Tabuk","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y224:ib:p934:r4","title":"Langca SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y417:ib:p927:r15","title":"Laur PIP: Conversion to Solar-Powered with AI Monitoring System","psgc":"0304913000","municipality":"Laur","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y498:ib:p921:r12","title":"Lay-asan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403214016","municipality":"Tanudan","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y479:ib:p934:r10","title":"Lingatong SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y233:ib:p921:r1","title":"Liwan West SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403211007","municipality":"Rizal","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y539:ib:p933:r12","title":"Lumbang SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0504111021","municipality":"City of Masbate ","province":"Masbate","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r10","title":"Lumbangan SPIP: Construction of a Water Source and Pump Facilities","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y335:ib:p921:r5","title":"MBF SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r6","title":"MCIS: Construction of Solar-Powered Pump with AI Satellite-Assisted Monitoring System at Brgy. Bibiclat","psgc":"0304901004","municipality":"Aliaga","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r7","title":"MCIS: Construction of Solar-Powered Pump with AI Satellite-Assisted Monitoring System at Brgy. Bucot","psgc":"0304901005","municipality":"Aliaga","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y612:ib:p912:r2","title":"Magsaysay CIS (Tabon ng Bayan): Construction of Canal Lining (Main Canal Sta. 0+310 to Sta. 1+110)","psgc":"0300811000","municipality":"Pilar","province":"Bataan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y355:ib:p921:r6","title":"Malagnat Pinukpuk SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403209016","municipality":"Pinukpuk","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y141:ib:p920:r14","title":"Maleq Farmers SPIP 2: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203122008","municipality":"Quezon","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y110:ib:p920:r13","title":"Maleq Farmers SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203122008","municipality":"Quezon","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y668:ib:p926:r18","title":"Maligaya SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0307708000","municipality":"San Luis","province":"Aurora","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y489:ib:p923:r11","title":"Manaog SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0105525000","municipality":"Manaoag","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y428:ib:p923:r9","title":"Manaring SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203114054","municipality":"City of Ilagan ","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y515:ib:p926:r12","title":"Mandiweng SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y669:ib:p920:r10","title":"Mangga Farmers SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y306:ib:p923:r4","title":"Maui SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203118010","municipality":"Delfin Albano","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r9","title":"Mayuro SPIP: Construction of a Water Source and Pump Facilities","psgc":"0401021024","municipality":"Rosario","province":"Batangas","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r11","title":"Molino CIS: Construction of a Water Source and Pump Facilities","psgc":"0401011000","municipality":"Laurel","province":"Batangas","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y458:ib:p933:r9","title":"Nabongsoran SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0504101027","municipality":"Aroroy","province":"Masbate","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y534:ib:p913:r8","title":"Nagas-Maramba CIS: Repair/Rehabilitation of Canal Structures & Canalization Works at Main Canal (Sta. 0+259.7 - 0+362.50)","psgc":"0500512030","municipality":"Oas","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["maramba","nagas"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_2 Summary of Identified Irrigation Projects per Municipality.xlsx","score":1.0,"matchedTerms":["maramba","nagas"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y224:ib:p935:r10","title":"Nangka SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r15","title":"PBRIS EXTN: Repair of Lateral A-7 Sta. 0+226 - 0+927","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/FINAL REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["extn","pbris"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r5","title":"PRIS-SDC PHS: Construction of Solar Power Pump","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r11","title":"PRIS: Construction of Solar-Powered Pump with AI Satellite-Assisted Monitoring System at Brgy. Minabuyoc","psgc":"0304930041","municipality":"Talavera","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r12","title":"PRIS: Construction of Solar-Powered Pump with AI Satellite-Assisted Monitoring System at Brgy. San Ricardo","psgc":"0304930052","municipality":"Talavera","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r12","title":"Pinagbayanan CIS: Construction of a Water Source and Pump Facilities","psgc":"0401023000","municipality":"San Juan","province":"Batangas","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r13","title":"Quilo-Quilo CIS: Construction of a Water Source and Pump Facilities","psgc":"0401020024","municipality":"Padre Garcia","province":"Batangas","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y520:ib:p923:r12","title":"Rang Ayan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y672:ib:p924:r1","title":"Rizal SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p906:r15","title":"Salug RIS: Construction of a 50-meter Protection Dike along Salug Diut River for the Protection of the Lateral E Canal Lining serving 1,000 hectares","psgc":"0907328000","municipality":"Tambulig","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y82:ib:p924:r4","title":"San Antonio SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y421:ib:p904:r13","title":"San Fabian RIS: Construction of Canal Lining @ Lateral AF (Sta. 0+552.5 - 0+800)","psgc":"0105533000","municipality":"San Fabian","province":"Pangasinan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p920:r11","title":"San Juan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p923:r13","title":"San Juan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y723:ib:p924:r3","title":"San Juan, Ilagan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203114083","municipality":"City of Ilagan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y163:ib:p924:r7","title":"San Ramon SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0501706028","municipality":"San Ramon","province":"Camarines Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p933:r16","title":"San Roque Malbog SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0506206000","municipality":"Castilla","province":"Sorsogon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y581:ib:p923:r14","title":"Santo Rosario SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p928:r5","title":"Simimbaan SWIS: Construction of One (1) Unit 15hp Drilled Solar-Powered Pump System","psgc":"0304906048","municipality":"Cuyapo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y305:ib:p927:r10","title":"Simimbaan SWIS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0304906048","municipality":"Cuyapo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y763:ib:p931:r14","title":"Sitio Kalaanan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0402112005","municipality":"Magallanes","province":"Cavite","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["kalaanan","sitio","spip"]}]},{"id":"pair:nep-nia-p26-y367:ib:p934:r9","title":"Sitio Lantawan 2 SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1003519017","municipality":"Sapad","province":"Lanao del Norte","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["sitio","spip"]}]},{"id":"pair:nep-nia-p26-y194:ib:p934:r3","title":"Sitio Paradise SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["sitio","spip"]}]},{"id":"pair:nep-nia-p22-y396:ib:p927:r14","title":"Sitio Saranay PIP: Conversion to Solar-Powered with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r17","title":"Sta. Cruz RIS - Pila Area: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System in Brgy. Bulilan Norte","psgc":"0403422004","municipality":"Pila","province":"Laguna","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r15","title":"Sta. Cruz RIS: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System in Brgy. San Miguel","psgc":"0403422015","municipality":"Pila","province":"Laguna","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y326:ib:p923:r5","title":"Sunrise Farmers SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203136019","municipality":"Santo Tomas","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y702:ib:p928:r14","title":"TARLAC GROUND WATER (CONCEPCION): Conversion to Solar-Powered with AI Monitoring System","psgc":"0306905000","municipality":"Concepcion","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y682:ib:p928:r13","title":"TARLAC GROUND WATER (PURA): Conversion to Solar-Powered with AI Monitoring System","psgc":"0306911000","municipality":"Pura","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y732:ib:p928:r15","title":"TARLAC GROUND WATER (VICTORIA): Conversion to Solar-Powered with AI Monitoring System","psgc":"0306917000","municipality":"Victoria","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r3","title":"TASMORIS (O'donnell Side): Construction of Canal Lining at Lateral B-1 and Concreting of Service Road at Lateral B in Brgy. Calingcuan","psgc":"0306916024","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r5","title":"TASMORIS (O'donnell Side): Construction of Canal Lining at Lateral B-1 and Concreting of Service Road at Lateral B in Brgy. Calingcuan","psgc":"0306916024","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y651:ib:p928:r12","title":"TASMORIS RIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0306916000","municipality":"City of Tarlac","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r2","title":"Tipor CIS: Repair of Impounding Dam and Repair of Canal Lining (Sta. 0+000 - 0+750)","psgc":"0105508024","municipality":"Bani","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y143:ib:p934:r1","title":"Tuburan - Aganan RIS: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y254:ib:p921:r2","title":"United Calaocan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403211002","municipality":"Rizal","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r10","title":"VCIS: Construction of Solar-Powered Pump with AI Satellite-Assisted Monitoring System at Brgy. Bantug Hacienda","psgc":"0304930010","municipality":"Talavera","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r8","title":"VCIS: Construction of Solar-Powered Pump with AI Satellite-Assisted Monitoring System at Brgy. Dimasalang Sur","psgc":"0304930021","municipality":"Talavera","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r9","title":"VCIS: Construction of Solar-Powered Pump with AI Satellite-Assisted Monitoring System at Brgy. Sampaloc","psgc":"0304930049","municipality":"Talavera","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y611:ib:p923:r15","title":"Villa Pereda SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203118028","municipality":"Delfin Albano","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y458:ib:p898:r2","title":"Malaig RIS: Repair and Improvement of Service Roads @ Main Canal Sta. 0+000-2+501","psgc":"1903607000","municipality":"Butig","province":"Lanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y629:ib:p906:r8","title":"Jalaur RIS: Repair/Rehabilitation (Concreting) of Canal @ Main Canal","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p901:r14","title":"Libmanan-Cabusao PIS: Repair/Rehabilitation of Trapezoidal Canal Embankment (Main Canal Sta. 0+000.00 - 0+720.00, Sta. 0+542.00 - 0+562.00, 4+471.00 - 4+862.00, 5+000.00 - 5+200.00), Headgate Lateral B (Sta. 5+550.00) and Headgate Lateral C (Sta. 6+920.00)","psgc":"0501718000","municipality":"Libmanan","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_3. DPWH Convergence Program to NIA FY 2025.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 7_1. Identfied Areas and Systems for NIA Contract Farming.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["cabusao","libmanan"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y581:ib:p909:r21","title":"Nibangon CIS: Improvement of Service Road (Main Canal Sta. 0+000 - 1+240)","psgc":"0307114000","municipality":"Subic","province":"Zambales","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y470:ib:p902:r13","title":"Dagutan RIS: Repair/Improvement of Diversion Dam (Downstream Apron)","psgc":"0803710000","municipality":"Burauen","province":"Leyte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y414:ib:p901:r9","title":"Batang-Batang RIS: Construction of Canal Lining and Canal Structures at Sta. 4+276.00- 4+676, BBMain Canal and Sta. 0+200.00 - 0+250.00, BBmain Canal","psgc":"1705315000","municipality":"Narra","province":"Palawan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y340:ib:p907:r2","title":"Balingasag RIS: Repair of Damaged Canal Lining along A 0-000 - 3+320","psgc":"1004302000","municipality":"Balingasag","province":"Misamis Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 10/Resto-NIS/Resto-NIS_Balingasag-RIS_12.5M_POW.pdf","matchedTerms":["balingasag"]}]},{"id":"pair:nep-nia-p29-y670:ib:p939:r16","title":"CALPI SIP: Improvement of Existing Brush Dam, Construction of Canal Structures and Canalization Works at Sta. 0+000 - 1+390 of Main Canal","psgc":"0000000000","municipality":"","province":"","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p915:r16","title":"Dinganen CIS: Repair of Stream Check at Delatina, concreting of 0.635 -km lined canal at Main Canal Station 0 +105 - 0+740, 0.500- km lined canal at Supplemental Canal Station 1+200 - 1+700 and 3-unit canal structure","psgc":"1908702005","municipality":"Buldon","province":"Maguindanao del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y306:ib:p904:r10","title":"Hapid Irrigation System: Restoration of Concrete Canals","psgc":"1402705004","municipality":"Lamut","province":"Ifugao","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p918:r13","title":"Lamkot CIS: Continuation of Canal Lining of Right Main Canal, 130 meters Canal Cover of Right Main Canal, Desilting/Repair of Diversion Dam, Remove and Replace of Structure of Right Main Canal and Left Main Canal","psgc":"1206302000","municipality":"Banga","province":"South Cotabato","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y265:ib:p935:r12","title":"Tubod-Dugoan SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702224000","municipality":"Dumanjug","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y275:ib:p904:r9","title":"West Apayao Abulug Irrigation System: Restoration of Damaged/Deteriorated Canal Structures, Construction of Canal Lining Protection Wall & Project Facilities","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y670:ib:p906:r10","title":"Bago RIS: Concreting of Bench Flume and Canal Structure","psgc":"1804502000","municipality":"City of Bago","province":"Negros Occidental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y400:ib:p896:r12","title":"MAGAT-RIS: Concreting of Canal Service Road Along - MMC, Sta. 24+130 - 24+880 (0.750 km)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p916:r11","title":"Cayungnan CIS: Repair of Dam and Construction of Canal Lining and Structures (Sta. 0+000 - 1+000)","psgc":"0105501006","municipality":"Agno","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y625:ib:p908:r10","title":"Manabo CIS: Concreting of Service Road","psgc":"1400116000","municipality":"Manabo","province":"Abra","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r6","title":"Masidem SRIP: Repair of Intake Gate and Canal Lining and Structures (Sta. 0+518 - 2+565)","psgc":"0105508014","municipality":"Bani","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r7","title":"Pau Tupa CIS: Construction of Canal Lining (Sta. 0+050 - 0+920)","psgc":"0105501017","municipality":"Agno","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r5","title":"Siwasiw CIS: Repair of Canal Lining (Sta. 0+000 - 1+200)","psgc":"0105542000","municipality":"Sual","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r8","title":"Tanobong CIS: Modification of Dam and Canal Lining (Sta. 0+742 - 1+315)","psgc":"0105514000","municipality":"Bolinao","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y450:ib:p902:r12","title":"Tibak RIS: Repair/Improvement of Kilot Checkgate & Tahaw Diversion Canal Sta. 0+000-0+600","psgc":"0803744017","municipality":"Santa Fe","province":"Leyte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p904:r8","title":"Abra River Irrigation System: Restoration of Canal Lining along the Supplemental Source of Upper Primary Canal and Construction of Appurtenant structures. Replacement of Delapidated Steel Gates along the Upper Primary Canal and Construction of Appurtenant Structures","psgc":"1400124000","municipality":"Tayum","province":"Abra","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y716:ib:p899:r18","title":"Addalam River Irrigation System (ADRIS): Improvement of MC Canal Lining @ Station 13+145.50 - Station 13+187, Sta. 13+400 - Station 13+494","psgc":"0205701000","municipality":"Aglipay","province":"Quirino","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p25-y672:ib:p933:r17","title":"Agcawilan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0600408001","municipality":"Lazo","province":"Aklan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y102:ib:p904:r3","title":"Ala RIS: Repair of Lateral C Sta. 1+523 - 1+533; and Repair/Replacement of 10 Steelgates along Main Canal","psgc":"1206313000","municipality":"Surallah","province":"South Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y306:ib:p934:r7","title":"Alangilan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y406:ib:p919:r19","title":"Allig SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408103001","municipality":"Flora","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y204:ib:p935:r9","title":"Anislag CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0500503003","municipality":"Daraga","province":"Albay","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y166:ib:p919:r9","title":"Aurelia SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y581:ib:p936:r10","title":"BALMS SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1004202000","municipality":"Baliangao","province":"Misamis Occidental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y754:ib:p937:r3","title":"BASAK SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y774:ib:p937:r4","title":"BATUTU RIVER SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1108201000","municipality":"Compostela","province":"Davao de Oro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y82:ib:p937:r5","title":"BAWANI SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1108206002","municipality":"Mawab","province":"Davao de Oro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y497:ib:p938:r3","title":"BUAYAN SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y449:ib:p936:r3","title":"BUBURAY PUROK 1 SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907305007","municipality":"Dimataling","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y469:ib:p936:r4","title":"BUBURAY PUROK 10 SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907305007","municipality":"Dimataling","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y428:ib:p936:r2","title":"BUBURAY PUROK 8 SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0907305007","municipality":"Dimataling","province":"Zamboanga del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p927:r18","title":"Bakod Bayan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304903007","municipality":"City of Cabanatuan","province":"Cabanatuan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p927:r3","title":"Bakod Bayan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304903007","municipality":"City of Cabanatuan","province":"Cabanatuan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y560:ib:p928:r9","title":"Balanayaw-Calusa-Caballada SPIP : Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0305405000","municipality":"Candaba","province":"Pampanga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y143:ib:p929:r3","title":"Balaybay SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0307104001","municipality":"Castillejos","province":"Zambales","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y720:ib:p939:r18","title":"Balunos CIP: Construction of Diversion Works and Canal Structures","psgc":"0603003004","municipality":"Anilao","province":"Iloilo","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r1","title":"Banog Sur CIS: Repair of Impounding Dam","psgc":"0105508006","municipality":"Bani","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y478:ib:p932:r6","title":"Bantay Oksi SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705110000","municipality":"San Jose","province":"Occidental Mindoro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y316:ib:p929:r8","title":"Bigkis Patubigan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0301421019","municipality":"San Miguel","province":"Bulacan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y245:ib:p912:r21","title":"Bislian Malaki CIS: Repair of Dam, Construction of Canal Lining and Provision of Pump","psgc":"0405636006","municipality":"Polillo","province":"Quezon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y346:ib:p929:r9","title":"Buga Sapang SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0301421013","municipality":"San Miguel","province":"Bulacan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r4","title":"Bugarin CIS: Repair of Dam","psgc":"0105503000","municipality":"City of Alaminos","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y458:ib:p915:r3","title":"Bugwak CIS: Repair of Diversion Dam at Sta. 0+000 and Repair of Canal Lining","psgc":"1001303002","municipality":"Dangcagan","province":"Bukidnon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y81:ib:p932:r17","title":"Bulalacao SPIP 2: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y508:ib:p932:r7","title":"Bulalacao SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p913:r11","title":"Buyo CIS: Repair/Rehabilitation of Diversion Works (Sta. 0+000), Slope Protection Works at Downstream & Upstream Leftside (10 meters) & Canalization Works at Main Canal (Sta. 1+152 - 1+829.5)","psgc":"0500511004","municipality":"Manito","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y602:ib:p936:r11","title":"CASUSAN SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1004201006","municipality":"Aloran","province":"Misamis Occidental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y436:ib:p937:r18","title":"CEBUZA CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1102410008","municipality":"Matanao","province":"Davao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y471:ib:p925:r2","title":"CEE Lower Council SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203108000","municipality":"City of Cauayan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y622:ib:p936:r12","title":"CKLP SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1004212000","municipality":"Plaridel","province":"Misamis Occidental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y247:ib:p919:r13","title":"Caba SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y629:ib:p941:r1","title":"Cagaycay RIS: Construction of Diversion Works (Sta. 0+000.00), Main Canal (Sta. 0+000.00 - 0+755.00), and other Appurtenant Structures","psgc":"0501733016","municipality":"San Jose","province":"Camarines Sur","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y277:ib:p940:r6","title":"Candiis SIP: Construction of Diversion Structure, Canalization and Canal Structures","psgc":"1108202000","municipality":"Laak","province":"Davao de Oro","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y132:ib:p932:r19","title":"Capinaan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0205002022","municipality":"Aritao","province":"Nueva Vizcaya","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y288:ib:p924:r14","title":"Carndenas SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0205705008","municipality":"Saguday","province":"Quirino","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p03-y697:ib:p899:r17","title":"Colocol INIS: Construction of Bench Flume","psgc":"0205005000","municipality":"Bayombong","province":"Nueva Vizcaya","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 2/Climate Change-NIS_Colocol INIS_15M.pdf","matchedTerms":["colocol","inis"]}]},{"id":"pair:nep-nia-p17-y207:ib:p919:r11","title":"Compra SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0907206009","municipality":"Liloy","province":"Zamboanga del Norte","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r14","title":"Concreting of Canal Lining at Brgy. Balete CIS, Diadi","psgc":"0205006002","municipality":"Diadi","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service  Road Along - OC-4, Sta. 0+000 (Start) - 0+332 (Ending).pdf","matchedTerms":["canal","concreting"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service Road along MMC Sta. MMC Sta. 24+126 -24+951.pdf","matchedTerms":["canal","concreting"]}]},{"id":"house_only:ib:p911:r11","title":"Concreting of Canal Lining at Brgy. Bugnay Daldalayap CIS, Diadi","psgc":"0205006003","municipality":"Diadi","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service  Road Along - OC-4, Sta. 0+000 (Start) - 0+332 (Ending).pdf","matchedTerms":["canal","concreting"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service Road along MMC Sta. MMC Sta. 24+126 -24+951.pdf","matchedTerms":["canal","concreting"]}]},{"id":"house_only:ib:p911:r13","title":"Concreting of Canal Lining at Brgy. Duraarong CIS, Diadi","psgc":"0205006005","municipality":"Diadi","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service  Road Along - OC-4, Sta. 0+000 (Start) - 0+332 (Ending).pdf","matchedTerms":["canal","concreting"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service Road along MMC Sta. MMC Sta. 24+126 -24+951.pdf","matchedTerms":["canal","concreting"]}]},{"id":"house_only:ib:p911:r12","title":"Concreting of Canal Lining at Brgy. Poblacion Inalangan CIS, Diadi","psgc":"0205006010","municipality":"Diadi","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service  Road Along - OC-4, Sta. 0+000 (Start) - 0+332 (Ending).pdf","matchedTerms":["canal","concreting"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service Road along MMC Sta. MMC Sta. 24+126 -24+951.pdf","matchedTerms":["canal","concreting"]}]},{"id":"house_only:ib:p911:r15","title":"Concreting of Canal Lining at Upper and Lower Decabacan CIS, Diadi","psgc":"0205006004","municipality":"Diadi","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service  Road Along - OC-4, Sta. 0+000 (Start) - 0+332 (Ending).pdf","matchedTerms":["canal","concreting"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/Concreting of Canal Service Road along MMC Sta. MMC Sta. 24+126 -24+951.pdf","matchedTerms":["canal","concreting"]}]},{"id":"pair:nep-nia-p20-y563:ib:p925:r5","title":"DPT IA SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y532:ib:p925:r4","title":"Dadap San Carlos SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y105:ib:p919:r7","title":"Dilan Neighborhood SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0105530012","municipality":"Pozorrubio","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y258:ib:p924:r13","title":"Ditabuan Balete SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0205701014","municipality":"Aglipay","province":"Quirino","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"house_only:ib:p910:r21","title":"Dolaoan CIS: Repair of Dam","psgc":"0105505000","municipality":"Anda","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y592:ib:p912:r1","title":"Duale-alangan: Improvement of Canal System (Main Canal Sta. 0+310 to Sta. 1+110)","psgc":"0300806013","municipality":"Limay","province":"Bataan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/FINAL REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["alangan","duale"]},{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["alangan","duale"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y556:ib:p926:r14","title":"Edilita Garcia Maronquillo SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0301422015","municipality":"San Rafael","province":"Bulacan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y594:ib:p925:r6","title":"Faustino SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203108035","municipality":"City of Cauayan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y624:ib:p925:r7","title":"Gaddasan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y468:ib:p929:r13","title":"Garlang Anyatam SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0301419000","municipality":"San Ildefonso","province":"Bulacan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y715:ib:p925:r10","title":"Golden Fields SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y655:ib:p925:r8","title":"Golden Grain SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1606818005","municipality":"Tago","province":"Surigao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y685:ib:p925:r9","title":"Golden Hope SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y173:ib:p929:r4","title":"Guring-Guro SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0307110006","municipality":"San Felipe","province":"Zambales","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/EGPIP-SOLAR GURUNG-GURO SPIP 10M/POW GURUNG-GURO SPIP 10M.pdf","matchedTerms":["guro","spip"]}]},{"id":"pair:nep-nia-p23-y407:ib:p929:r11","title":"Hacienda Kab SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y517:ib:p938:r4","title":"KAYAKAYA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1908803004","municipality":"Datu Abdullah Sangki","province":"Maguindanao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y377:ib:p929:r10","title":"Kadaluyan-Pag-Asa SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0301421000","municipality":"San Miguel","province":"Bulacan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y286:ib:p912:r23","title":"Kawayan - Alitap CIS: Construction of Canal Lining","psgc":"0405627002","municipality":"Mauban","province":"Quezon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y258:ib:p906:r16","title":"Labangan RIS: Construction of Canal Lining at Lateral A3, Lateral A2","psgc":"0907312000","municipality":"Labangan","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 9/1. REPAIRNIS-LABRIS-200M/LABANGAN-REPAIR NIS.jpg","matchedTerms":["labangan"]}]},{"id":"pair:nep-nia-p27-y163:ib:p935:r8","title":"Laum Tabay CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702239000","municipality":"Ronda","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/ANNEX 6-2. 10- Year Irrigation Development Program.xlsx","score":1.0,"matchedTerms":["laum","tabay"]},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/RIMP FINAL/RIMP_CENTRAL VISAYAS_2024 (Updated October 12).pdf","score":1.0,"matchedTerms":["laum","tabay"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y234:ib:p933:r1","title":"Looc SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y482:ib:p908:r7","title":"Lower Nagbitin CIS: Retrofitting of Diversion Dam","psgc":"0205014004","municipality":"Villaverde","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y746:ib:p925:r11","title":"Luzon SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y82:ib:p925:r12","title":"M2N2 Liwanag SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y375:ib:p937:r15","title":"MABUNGA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0405642016","municipality":"San Francisco","province":"Quezon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PHOTOS-SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PROJECT LAYOUT- SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/SERVICEROADNIS-SAN FRANCISCO RIS-1.25M.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-MABUNGA-15M-PERTCPM.pdf","matchedTerms":["mabunga"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-MABUNGA-15M-PIC1.jpg","matchedTerms":["mabunga"]}]},{"id":"pair:nep-nia-p28-y456:ib:p938:r1","title":"MAL RIS: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1102410000","municipality":"Matanao","province":"Davao del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y335:ib:p937:r13","title":"MINTAO BACALI SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0502003014","municipality":"Bato","province":"Catanduanes","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y663:ib:p936:r14","title":"MISOM SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1004202007","municipality":"Baliangao","province":"Misamis Occidental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y535:ib:p926:r13","title":"MMMB SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p27-y642:ib:p936:r13","title":"MOHON SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y112:ib:p925:r13","title":"Macanao Pilot SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203116011","municipality":"Luna","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p928:r4","title":"Macarse PIS (STW): Construction of One (1) Unit 10hp Water Surface Solar-Powered Pump System","psgc":"0304932011","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y285:ib:p927:r9","title":"Macarse PIS (STW): Conversion to Solar-Powered with AI Monitoring System","psgc":"0304932011","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y534:ib:p940:r14","title":"Magat-RIS: Construction of Canal Extension and Appurtenant Structures at Burgos, Isabela","psgc":"0203105000","municipality":"Burgos","province":"Isabela","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y554:ib:p940:r15","title":"Magat-RIS: Construction of Canal Extension and Appurtenant Structures at Quirino, Isabela","psgc":"0203123000","municipality":"Quirino","province":"Isabela","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p04-y445:ib:p901:r10","title":"Malatgao RIS: Construction of Canal Lining at Canal Structures at Sta. 2+670.00 - 2+793.00, Lateral BS and Sta. 1+000.00- 1+315.00, Lateral CS and Sta. 0+250.00 - 0+550.00, Lateral DS","psgc":"1705315000","municipality":"Narra","province":"Palawan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y656:ib:p905:r4","title":"Mallig River Irrigation System: Improvement of Irrigation Facilities at Lateral B","psgc":"0203119000","municipality":"Mallig","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y112:ib:p907:r14","title":"Mallig River Irrigation System: Supply, Delivery and Installation of Telemetry and Automatic Weather Station at Casili Dam and Construction of Slope Protection","psgc":"0203119003","municipality":"Mallig","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p26-y275:ib:p934:r6","title":"Matanguilon SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1804515004","municipality":"City of Kabankalan","province":"Negros Occidental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y227:ib:p919:r12","title":"Matobato SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p906:r1","title":"Matogdon RIS: Restoration of Lateral A (Sta 1+005 - 1+117); Improvement/Rehabilitation of Canal Structure and Canalization Works at Sta. 0+005-0+390, 1+888 - 1+998.50 Lat. C, Sta. 1+420 - 1+646.50 Lat. C-1; Installation of Diesel Engine Pump at the Tail End of Lateral A1c","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y396:ib:p937:r16","title":"NEW SILAY SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y102:ib:p937:r6","title":"NUEVO ILOCO SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1108206006","municipality":"Mawab","province":"Davao de Oro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p19-y286:ib:p923:r3","title":"Naganacan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p910:r16","title":"Nagsabaran CIS: Repair of Downstream Apron","psgc":"0103316025","municipality":"San Juan","province":"La Union","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y143:ib:p925:r14","title":"Nagsil Pilot SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y712:ib:p932:r14","title":"Naujan SPIP 3: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705208000","municipality":"Naujan","province":"Oriental Mindoro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y651:ib:p932:r12","title":"Naujan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705208000","municipality":"Naujan","province":"Oriental Mindoro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p25-y254:ib:p933:r2","title":"Odiongan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y187:ib:p919:r10","title":"Olilicon SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1402704018","municipality":"Lagawe","province":"Ifugao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r18","title":"PRIS-SDC PH2: Repair of Sub-Lateral L-6a (Construction of Concrete Lining at Sta. 0+000 - Sta. 0+817)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p930:r19","title":"PRIS-SDC: Construction of Solar-Powered Pump at Brgy. Sinulatan (Kasangga ng Rang Ay IA)","psgc":"0304911063","municipality":"Guimba","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y518:ib:p921:r13","title":"Pangol SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403214010","municipality":"Tanudan","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y702:ib:p907:r12","title":"Pasa SRIS: Supply, Delivery and Installation of Intermediate Monitoring System and Construction of Slope Protection","psgc":"0203114070","municipality":"City of Ilagan","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y537:ib:p920:r5","title":"Patayan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p18-y386:ib:p921:r7","title":"Pinococ SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1403209023","municipality":"Pinukpuk","province":"Kalinga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y135:ib:p919:r8","title":"Purok 2 Salamague SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1402705015","municipality":"Lamut","province":"Ifugao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y172:ib:p931:r18","title":"Purok 3 San Benito SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y507:ib:p920:r4","title":"Rang-ay Ti Panay SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p913:r12","title":"Rapu Rapu CIS: Repair/Rehabilitation of Diversion Works (Sta. 0+000), Slope Protection at Dam, Canal Structures and Canalization Works at Main Canal #2 (Sta. 0+705) & Lateral (Sta. 0+000 - 0+200)","psgc":"0500515000","municipality":"Rapu-Rapu","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y204:ib:p925:r16","title":"Reina Salvacion SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203120012","municipality":"Naguilian","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y772:ib:p932:r16","title":"Roxas SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y416:ib:p937:r17","title":"SAN JOSE SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y123:ib:p937:r7","title":"SAN MIGUEL AGUIBAWA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702218000","municipality":"Compostela","province":"Davao de Oro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y355:ib:p937:r14","title":"SAN MIGUEL DUJALI SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1102323000","municipality":"Braulio E. Dujali","province":"Davao del Norte","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y295:ib:p937:r11","title":"SAN MIGUEL SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y153:ib:p937:r8","title":"SAN MIGUEL UPPER TINGALE SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702218000","municipality":"Compostela","province":"Davao de Oro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y184:ib:p924:r8","title":"SANMANVILFER SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203112048","municipality":"Echague","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y638:ib:p938:r9","title":"SIGAYAN SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p928:r7","title":"Salagusog PIP: Construction of Pump Irrigation System","psgc":"0304906042","municipality":"Cuyapo","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y377:ib:p927:r13","title":"Salagusog PIP: Conversion to Solar-Powered with AI Monitoring System","psgc":"0304906042","municipality":"Cuyapo","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y235:ib:p925:r17","title":"Salucag SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1400107013","municipality":"Dolores","province":"Abra","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r3","title":"Sampaloc CIS: Repair of Dam and Construction of Canal Lining (Sta. 0+000 - 0+500)","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y476:ib:p938:r2","title":"Sampao SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y577:ib:p938:r7","title":"San Felipe - Calalima SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1206315011","municipality":"Tantangan","province":"South Cotabato","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y462:ib:p908:r6","title":"San Francisco CIS: Retrofitting of Diversion Dam","psgc":"0500514031","municipality":"Polangui","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["francisco","san"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PHOTOS-SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PROJECT LAYOUT- SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/SERVICEROADNIS-SAN FRANCISCO RIS-1.25M.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["polangui"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/PHOTOS-Cabangan-CIS-Polangui.pdf","matchedTerms":["polangui"]}]},{"id":"pair:nep-nia-p21-y265:ib:p926:r1","title":"San Francisco Pilot SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PHOTOS-SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PROJECT LAYOUT- SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/SERVICEROADNIS-SAN FRANCISCO RIS-1.25M.pdf","matchedTerms":["francisco","san"]}]},{"id":"pair:nep-nia-p17-y477:ib:p920:r3","title":"San Isidro Norte SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408105011","municipality":"Luna","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p20-y441:ib:p925:r1","title":"San Isidro SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y355:ib:p919:r17","title":"San Jose SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y325:ib:p919:r16","title":"San Mariano SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y635:ib:p905:r3","title":"San Pablo-Cabagan IS: Improvement of Irrigation Facilities at Main Canal","psgc":"0203133000","municipality":"San Pablo","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/[RIMP-R2] FINAL CONSOLIDATED RIMP -MAIN REPORT - JULY 15, 2024.pdf","score":1.0,"matchedTerms":["cabagan","pablo","san"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y733:ib:p907:r13","title":"San Pablo-Cabagan IS: Supply, Delivery and Installation of Sluice Gates and Construction of Slope Protection","psgc":"0203133000","municipality":"San Pablo","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/[RIMP-R2] FINAL CONSOLIDATED RIMP -MAIN REPORT - JULY 15, 2024.pdf","score":1.0,"matchedTerms":["cabagan","pablo","san"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y437:ib:p929:r12","title":"Sanitab SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304925012","municipality":"San Isidro","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y268:ib:p919:r14","title":"Santa Maria-Cabaggaoan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203134000","municipality":"Santa Maria","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y299:ib:p906:r18","title":"Sibuguey Valley IS: Construction of Canalization at Lateral 7","psgc":"0908303003","municipality":"Diplahan","province":"Zamboanga Sibugay","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y529:ib:p928:r8","title":"Sinipit Malaki SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0305405029","municipality":"Candaba","province":"Pampanga","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p17-y447:ib:p920:r2","title":"Sitio Culilimtao SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408104000","municipality":"Kabugao","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["sitio","spip"]}]},{"id":"pair:nep-nia-p26-y337:ib:p934:r8","title":"Sitio Lantawan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1804526010","municipality":"City of Silay","province":"Negros Occidental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["sitio","spip"]}]},{"id":"pair:nep-nia-p17-y589:ib:p920:r7","title":"Sitio Panawagan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1408103016","municipality":"Flora","province":"Apayao","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["sitio","spip"]}]},{"id":"pair:nep-nia-p25-y702:ib:p933:r18","title":"Sition Dalipe SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0603007018","municipality":"Barotac Nuevo","province":"Iloilo","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p931:r16","title":"Sta. Cruz RIS - Pila Area: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System in Brgy. Pinagbayanan","psgc":"0403422012","municipality":"Pila","province":"Laguna","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p24-y447:ib:p932:r5","title":"Sta. Cruz SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y315:ib:p937:r12","title":"TALOMO SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"1102318015","municipality":"Santo Tomas","province":"Davao del Norte","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y122:ib:p929:r2","title":"TARLAC GROUND WATER (ANAO): Conversion to Solar-Powered with AI Monitoring System","psgc":"0306901000","municipality":"Anao","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y773:ib:p928:r17","title":"TARLAC GROUND WATER (LA PAZ): Conversion to Solar-Powered with AI Monitoring System","psgc":"0306907000","municipality":"La Paz","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y81:ib:p928:r18","title":"TARLAC GROUND WATER (MONCADA): Conversion to Solar-Powered with AI Monitoring System","psgc":"0306909000","municipality":"Moncada","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p22-y753:ib:p928:r16","title":"TARLAC GROUND WATER (PANIQUI): Conversion to Solar-Powered with AI Monitoring System","psgc":"0306910000","municipality":"Paniqui","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p23-y102:ib:p929:r1","title":"TARLAC GROUND WATER (RAMOS): Conversion to Solar-Powered with AI Monitoring System","psgc":"0306912000","municipality":"Ramos","province":"Tarlac","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p28-y183:ib:p937:r9","title":"UPPER TINGALE-SAN MIGUEL SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring System","psgc":"0702218000","municipality":"Compostela","province":"Davao de Oro","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y420:ib:p908:r5","title":"Upper Decabacan CIS: Improvement of Diversion Dam","psgc":"0205006004","municipality":"Diadi","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p21-y326:ib:p926:r3","title":"Viga Region SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0203102059","municipality":"Angadanan","province":"Isabela","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["region","spip"]}]},{"id":"pair:nep-nia-p20-y349:ib:p924:r16","title":"Villa Santiago SPIP 2: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0205701017","municipality":"Aglipay","province":"Quirino","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/UPRIIS/REPAIR OF NIS/RNIS-ALIAGA IS- SANTIAGO-ALIAGA-100M.pdf","matchedTerms":["santiago"]}]},{"id":"pair:nep-nia-p20-y319:ib:p924:r15","title":"Villa Santiago SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0205701017","municipality":"Aglipay","province":"Quirino","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/UPRIIS/REPAIR OF NIS/RNIS-ALIAGA IS- SANTIAGO-ALIAGA-100M.pdf","matchedTerms":["santiago"]}]},{"id":"pair:nep-nia-p08-y630:ib:p907:r9","title":"Zinundungan River Irrigation System: Improvement of Tulong Intake Structure and Gates","psgc":"0201517023","municipality":"Lasam","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y461:ib:p896:r15","title":"TASMORIS (Tarlac RIS): Concreting of Service Road at Lateral ABC-1 (Amucao East FIA) Sta. 0+000 to Sta. 1+000","psgc":"0306916004","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y465:ib:p939:r8","title":"Columbitin SWIP: Construction of Small Water Impounding Project","psgc":"0304906016","municipality":"Cuyapo","province":"Nueva Ecija","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y291:ib:p905:r16","title":"Caguray RIS: Construction of Canal Lining and Canal Structure from Sta. 1+708 to Sta. 2+100 Lateral B1-A, and Sta. 3+279 to 3+479 B1-1","psgc":"1705105000","municipality":"Magsaysay","province":"Occidental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p908:r3","title":"Masipi West CIS: Replacement of Trash Rack at Intake Sta. 0+000; Propose Steel Gate at Intake Sta. 0+000, and at Inlet of Combined Thresher Crossing and Headgate of Lateral A along Main Canal Sta. 0+436; Construction of Pipeline at Sta. 0+236 - 0+284 along Main Canal; Repair of RC Pipe of Siphon at Sta. 1+360 - 1+440 along Main Canal; Construction of Canal Lining at Sta. 0+474 - 0+633, Sta. 0+658 - 0+845, Sta. 0+858 - 0+996, Sta. 1+300 - 1+360, Sta. 1+680 -1+800 along Main Canal","psgc":"0203106026","municipality":"Cabagan","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p908:r4","title":"Simanu CIS: Propose Steel Gate & Lifting Mechanism at Intake Sta. 0+000 Rehabilitation/Dredging & Clearing of Ogee Dam Construction of Structured Wall Pipe at Sta. 4+360.00 - 4+560.00 along Main Canal; Canal Lining at Sta. 4+580.00 - 4+797.00 and Sta. 4+800.00 - 5+092.50 along Main Canal, Sta. 0+006.20 - 0+568.80 along Lateral A, and Sta. 0+005.00 - 0+690.00 along Lateral B; Canal Structures at various locations (Road Crossing at Sta. 4+797.00 along Main Canal and Drainage Culvert at Sta. 0+054.00 along Lateral A); and Canal Desilting","psgc":"0203133015","municipality":"San Pablo","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y256:ib:p940:r5","title":"Tabion CIP: Protection Works of Cut & Cover (Sta. 0+000 - 0+200)","psgc":"0803729000","municipality":"Leyte","province":"Leyte","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y163:ib:p904:r5","title":"Tacurong RIS: Damaged Protection Dike Downstream Remove and Replace at Buenacosa C&W (Sta. 0+000 - 0+020)","psgc":"1206511000","municipality":"City of Tacurong","province":"Sultan Kudarat","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p902:r1","title":"Tigman-Hinagyanan-Inarihan RIS: Repair/Rehabilitation of Canalization at MC-1 Canal (Sta. 0+000.00 - 0+100.00) at Tigman Main Canal, Canal Lining at Inarihan Line-Main Canal (Sta. 9+320.00 - 9+652.00), Construction of Outfall Structure at Sta. 9+562.00 (Inarihan Main Canal), Rehabilitation of Outfall B-3 Structure, MC-SP2 Outfall Structure-Replacement of Steelgate, TO1 (Sta. 0+200.00 - 0+300.00), TO2 (Sta. 0+030.00 - 0+080.00), Turnout 11 (Sta. 0+050.00 - 0+100.00) along Hinagyanan line, Lateral A (raising of canal) (Sta. 1+040 - 1+240) at Inarihan Line, and Replacement of turnoutgates at MC7A-1, Lateral D4, TO A1-1 and A1-2 within Inarihan Line","psgc":"0501704000","municipality":"Bombon","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_2 Summary of Identified Irrigation Projects per Municipality.xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/R5_ANNEX D - INVESTMENT PROGRAM [Annex 5 v Main Document Write Up] (1).xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y343:ib:p939:r4","title":"Nongob -Fanayan SIP: Construction of Intake, Canal Structures and Canal Lining","psgc":"0000000000","municipality":"","province":"","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y411:ib:p916:r10","title":"Estanza CIS: Repair of Canal Lining (Sta. 0+000 - 0+855)","psgc":"0105514010","municipality":"Bolinao","province":"Pangasinan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y268:ib:p898:r17","title":"Upper Chico River Irrigation System: Repair of Canal Lining, Protection Works & Canal Structure","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y326:ib:p904:r11","title":"Upper Chico River Irrigation System: Restoration of Canal Lining & Canal Structure","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y175:ib:p902:r6","title":"Aganan RIS: Repair/ Rehabilitation (Concreting) of Canal @ Main Canal","psgc":"0603041000","municipality":"San Miguel","province":"Iloilo","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y347:ib:p897:r16","title":"Bao RIS: Road Concreting along Lateral D","psgc":"0803738000","municipality":"Ormoc City","province":"Leyte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y534:ib:p902:r17","title":"Das-ay RIS: Repair/Improvement of Diversion Works & Canal System","psgc":"0806403000","municipality":"Hinunangan","province":"Southern Leyte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p901:r13","title":"Libmanan-Cabusao PIS: Repair/Rehabilitation of Trapezoidal Canal Left and Right Embankment (Main Canal Sta. 7+642 - 8+300), Headgates (MC-1 Sta. 8+593.00, MC-2 Sta. 9+393.00, and F1-1 Sta. 9+844), and Construction of Waste Way (Sta. 11+145)","psgc":"0501718000","municipality":"Libmanan","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_3. DPWH Convergence Program to NIA FY 2025.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 7_1. Identfied Areas and Systems for NIA Contract Farming.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["cabusao","libmanan"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y718:ib:p914:r4","title":"Lumpan CIS: Construction of 1 unit Sumptank, Solar Pumping System, 1 unit Intake, and Repair of Pipeline A (0+000 - 0+500)","psgc":"0702203000","municipality":"Alegria","province":"Cebu","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y132:ib:p904:r4","title":"Marbel 2 RIS: Repair of Structure and Construction of Bank Protection Works at Agura Structure; and Repair/Replacement of 5 Steelgates along Main Canal, Lateral C","psgc":"1206306000","municipality":"City of Koronadal ","province":"South Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p913:r14","title":"Naagtan CIS: Repair/Rehabilitation of Canal lining at Sta. 0+152.40 - 0+282.60 MC01, Sta. 0+923.90 - 0+950.40 MC01, Sta. 0+959.00 - 1+125.80 MC01, 1+135.00 - 1+697.80 MC01, Sta. 0+94.00 - 0+150.40 MC02, Sta. 0+543.30 - 0+957.80 MC02, Sta. 0+988.35 - 1+068.60 MC02, Sta. 1+078.15 - 1+160.00 MC02 including installation of Steelgates at Diversion","psgc":"0506208023","municipality":"Gubat","province":"Sorsogon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y346:ib:p904:r12","title":"Papa RIS: Construction of Canal Lining at Sta. 3+000-4+000 OGF PR-2","psgc":"0102813000","municipality":"Marcos","province":"Ilocos Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y478:ib:p909:r16","title":"Pulang Lupa SWIS: Construction of Service Road along Brgy. Rio Chico (Sta. 0+000 - Sta. 0+800)","psgc":"0304910014","municipality":"General Tinio","province":"Nueva Ecija","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["general"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["general"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/RESTOCIS-TINDOG CIS-10M/TINDOG CIS GENERAL LAYOUT.jpg","matchedTerms":["general"]}]},{"id":"house_only:ib:p940:r2","title":"Habangan-Lower Cang-apa SIP: Construction of Diversion Works, Canal Structures and Concrete Canal Lining Check Dam - 1 unit & Intake - 2 units Canalization (MC at Sta. 0+000 to Sta. 0+060, MC-1 at Sta. 0+000 to Sta. 0+240, Lateral A at MC-1 Sta. 0+000 to Sta. 0+240, Lateral B at MC-1 Sta. 0+000 to Sta.0+240, MC-2 Sta. 0+000 to Sta. 0+258, Sta. 0+270 to Sta. 0+500, Sta. 0+512 to Sta. 0+523, Sta. 0+534 to Sta. 0+640, Sta. 0+660 to Sta. 0+700 and Lateral A1 at MC-2 Sta. 0+000 to Sta. 0+100) Canal Structures (Turn-out - 2 units, Stilling Basin - 3 units, Turn-in - 1 unit, Road Crossing - 1 unit, Cut & Cover - 1 unit and Concrete Elevated Flume from Sta.0+258 to Sta.0+270, Sta.0+523 to Sta.0+534)","psgc":"1806102010","municipality":"Larena","province":"Siquijor","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y279:ib:p906:r17","title":"Dipolo RIS: Repair of Dipolo MC2 Siphon","psgc":"0907308000","municipality":"Dumingag","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y374:ib:p901:r7","title":"Pula RIS: Repair of Downstream Apron","psgc":"1705209000","municipality":"Pinamalayan","province":"Oriental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y340:ib:p910:r19","title":"Bucao CIS: Repair of Canal Lining w/ Cover @ Sta. 2+850 - 2+990.00, MC","psgc":"0103315007","municipality":"San Gabriel","province":"La Union","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r17","title":"PRIS-SDC PH2: Repair of Sub-Lateral P-2a (Construction of Concrete Lining at Sta. 0+330 - Sta. 1+070.00)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p913:r10","title":"Padang CIS: Repair/Rehabilitation of Left Main Canal (Sta. 0+310.50 - 0+342) and Canalization Works at Main Canal (0+101 - 0+885)","psgc":"0500506061","municipality":"City of Legazpi ","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y377:ib:p909:r12","title":"Partida CIS: Road Concreting (Sta. 0+000 to 0+350)","psgc":"0301421035","municipality":"San Miguel","province":"Bulacan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y397:ib:p909:r13","title":"Sibul CIS: Road Concreting (Sta. 0+698 to 1+048)","psgc":"0301421052","municipality":"San Miguel","province":"Bulacan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y485:ib:p939:r9","title":"Siminublan CIP: Construction of Diversion Works and Canal System Brgy. Siminublan, San Narciso, Zambales","psgc":"0307112016","municipality":"San Narciso","province":"Zambales","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y357:ib:p909:r11","title":"Sta. Catalina CIS: Road Concreting (Sta. 0+360 to 0+660)","psgc":"1804618000","municipality":"Santa Catalina","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y316:ib:p897:r15","title":"Tubigon (Ilihan) SRIS: Repair and Improvements of Service Roads from Sta. 0+100 to Sta. 0+530 leading to Ilihan Brgy. Road","psgc":"0701245000","municipality":"Tubigon","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/SERVICEROADNIS-TUBIGON(ILIHIAN)-7M/ISR-TUBIGON(ILIHAN)-7M-POW...pdf","matchedTerms":["ilihan","tubigon"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/SERVICEROADNIS-TUBIGON(ILIHIAN)-7M/ISRNIS-TUBIGON(ILIHAN) - 7.0M - PICTURES.pdf","matchedTerms":["ilihan","tubigon"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/SERVICEROADNIS-TUBIGON(ILIHIAN)-7M/ISRNIS-TUBIGON(ILIHAN)-7.0M - GEN. LAYOUT.pdf","matchedTerms":["ilihan","tubigon"]}]},{"id":"pair:nep-nia-p02-y367:ib:p897:r17","title":"Hindang-Hilongos IS: Road Concreting of Main Canal","psgc":"0803719000","municipality":"Hilongos","province":"Leyte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/ANNEX 5 (2.7.25).xlsx","score":1.0,"matchedTerms":["hilongos","hindang"]},{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/EASTERN VISAYAS-RIMP-2023-2030 (1).pdf","score":1.0,"matchedTerms":["hilongos","hindang"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y706:ib:p908:r13","title":"Camandag CIS: Construction of Service Road","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y435:ib:p939:r7","title":"Ditabuan River - San Ramon SIP: Construction of Intake, Pump House, Canal Lining and Canal Structures; Furnishing and Installation of Solar Panels","psgc":"0205701014","municipality":"Aglipay","province":"Quirino","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p29-y536:ib:p939:r11","title":"MAMARA SIP: Construction of Canal Lining and Canal Structures from 0+000 to Sta. 0+500","psgc":"0000000000","municipality":"","province":"","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p16-y215:ib:p918:r15","title":"Magallanes CIS: Repair of Canal Structures","psgc":"0600414009","municipality":"Nabas","province":"Aklan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y297:ib:p940:r7","title":"Moradje-Ebarle SIP: Continuation of the Construction of Canal Lining and Canal Structures","psgc":"0907337009","municipality":"Josefina","province":"Zamboanga del Sur","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y700:ib:p939:r17","title":"Palala Daku CIP: Construction of Canal and Canal Structures","psgc":"0000000000","municipality":"","province":"","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 6/SIP - PALALA DAKU - 6.6M./FINAL PALALA DAKU CIS SIP CY 2027.pdf","matchedTerms":["daku","palala"]}]},{"id":"pair:nep-nia-p15-y338:ib:p917:r17","title":"Sipalay CIS: Replacement of Main Canal Siphon, Construction of Bench Flume and Canal Structures","psgc":"1804527012","municipality":"City of Sipalay","province":"Negros Occidental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 6/RESTO CIS - SIPALAY CIS - 6.6M/POW CY2027-SIPALAY CIS 6-6M.pdf","matchedTerms":["sipalay"]}]},{"id":"pair:nep-nia-p10-y560:ib:p909:r20","title":"Castillo CIS: Concreting of Service Road at Castillo CIS","psgc":"0306905008","municipality":"Concepcion","province":"Tarlac","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/SERVICE ROADS-CIS (CASTILLO CIS) - 6.5M/Improvement of Service Road at Castillo CIS ( Sta. 0+000 - Sta. 0+500).pdf","matchedTerms":["castillo"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/SERVICE ROADS-CIS (CASTILLO CIS) - 6.5M/Pictures/CASTILLO CIS.png","matchedTerms":["castillo"]}]},{"id":"pair:nep-nia-p07-y240:ib:p905:r14","title":"TASMORIS (Tarlac RIS): Repair of Steel Gates, Improvement of Canal System at Sub-Lateral B3a Sta. 0+000 to Sta. 0+500","psgc":"0306916000","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y347:ib:p913:r2","title":"Tigman CIS: Construction of Elevated Flume, Canal Lining and Canal Structure at Sta. 2+100.00 - 2+900.00, Main Canal","psgc":"1705301000","municipality":"Aborlan","province":"Palawan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y84:ib:p905:r9","title":"Angat-Maasim RIS: Rehabilitation of Canal System - Canalization - Lat. J-5-A-1 Sta. (0+000 to 0+500)","psgc":"0301407000","municipality":"Calumpit","province":"Bulacan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["angat","maasim"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p902:r7","title":"Bago RIS: Rehabilitation/Improvement of Bench Flume and Drainage Canal","psgc":"1804502000","municipality":"City of Bago","province":"Negros Occidental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y368:ib:p917:r18","title":"Basak CIS: Repair of Pipelines, Solar Pumping System","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y532:ib:p918:r4","title":"Basiao CIS: Contruction of Canal Lining and its Irrigation Structures","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p939:r6","title":"Mapalyao SIP: Phase 2: Construction of Supplemental Diversion Works, Canalization Work (Sta. 4+298 - Sta. 6+110 MC & Lateral canals), Canal Structures, Cable Pipelines and Proc. & Instal. of HDPE Pipelines (Sta. 4+750 - Sta. 4+980 MC)","psgc":"0205011000","municipality":"Quezon","province":"Nueva Vizcaya","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r16","title":"PRIS-SDC PH2: Repair of Sub-Lateral O-1 (Construction of Concrete Lining at Sta. 0+120 - Sta. 0+700)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y689:ib:p906:r11","title":"Pangiplan RIS: Concreting of Bench Flume and Canal Structure @ Lateral D-1","psgc":"1804510000","municipality":"City of Himamaylan","province":"Negros Occidental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y81:ib:p917:r6","title":"Sandoval CIS: Construction of Canal Lining and Elevated Flume at Sta. 1+244.00 - 1+280.00, Main Canal","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y649:ib:p906:r9","title":"Sibalom RIS: Repair/Rehabilitation (Concreting) of Canal @ Main Canal","psgc":"0603028000","municipality":"Leon","province":"Iloilo","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y194:ib:p914:r12","title":"Naga CIS: Repair/Improvement and Construction of Additional Pipeline and Concrete Canal","psgc":"0806003106","municipality":"City of Calbayog","province":"Samar","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y194:ib:p897:r12","title":"Bago RIS: Concreting of Service Roads","psgc":"1804502000","municipality":"City of Bago","province":"Negros Occidental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p903:r19","title":"Malasila RIS: Construction of Protection Works at New Barbaza Downstream 35meters","psgc":"1204710021","municipality":"M'Lang","province":"Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y725:ib:p917:r4","title":"Baluguhan CIS: Re-installation of HDPE Pipe at Sta. 0+000 to Sta. 0+000 2+000 to Lateral A and Sta. 0+000 to 2+000","psgc":"1705101000","municipality":"Abra De Ilog","province":"Occidental Mindoro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y329:ib:p896:r9","title":"Colocol INIS: Construction of Concrete Road S","psgc":"0205005000","municipality":"Bayombong","province":"Nueva Vizcaya","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 2/Climate Change-NIS_Colocol INIS_15M.pdf","matchedTerms":["colocol","inis"]}]},{"id":"house_only:ib:p915:r17","title":"Lambusong CIS: Lateral A - Gardose area - 1,210 meters (remove and replace) & Continuation of Canal Lining 400 meters (drainage), Flume - Lateral B - 500 meters (remove and replace), Terruvian Dam - 536 meters HDPE","psgc":"1206311000","municipality":"Norala","province":"South Cotabato","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 12/REPAIRCIS-LAMBUSONGCIS-5.5M/LAMBUSONG CIS - ANNEX B.pdf","matchedTerms":["lambusong"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 12/REPAIRCIS-LAMBUSONGCIS-5.5M/LAMBUSONG CIS PHOTO.pdf","matchedTerms":["lambusong"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 12/REPAIRCIS-LAMBUSONGCIS-5.5M/Lambusong CIS CY 2027.pdf","matchedTerms":["lambusong"]}]},{"id":"pair:nep-nia-p13-y214:ib:p914:r13","title":"Rosario CIS: Repair and Improvement of Existing Supplemental Dam and Construction of Damaged CHB Canal","psgc":"0804816000","municipality":"Rosario","province":"Northern Samar","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p900:r12","title":"TRIS Lower: CHB Canal Lining at Lateral B-3, SDA @ Sta. 2+080.23 - 2+805.03","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y499:ib:p909:r17","title":"San Miguel PIS: Improvement of Service Road (Along Main Canal)","psgc":"0305418000","municipality":"San Simon","province":"Pampanga","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y316:ib:p916:r7","title":"Agcuyo CIS: Restoration of Canal Lining","psgc":"1404404000","municipality":"Bontoc ","province":"Mountain Province","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y364:ib:p910:r20","title":"Ngayaongaoan CIS: Repair of Canal Lining (Sta. 0+000 - 0+800)","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y81:ib:p897:r6","title":"Daet-Talisay RIS: Concreting of Service Road South Main Canal Sta. 0+000-0+430","psgc":"0501603000","municipality":"Daet ","province":"Camarines Norte","program":"National Irrigation System Sub-Program","nimpMatches":[{"plan":"NIMP","region":"NATIONAL","file":"NATIONAL IRRIGATION MASTER PLAN (NIMP)/NIMP Abridged_per page.pdf","score":1.0,"matchedTerms":["daet","talisay"]}],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["daet","talisay"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/CY 2027 POW-DAET-TALISAY RIS- 5.2M.pdf","matchedTerms":["daet","talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["daet","talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/PHOTOS-DTRIS-SERVICE ROADSNIS-5.2M.pdf","matchedTerms":["daet","talisay"]}]},{"id":"pair:nep-nia-p01-y247:ib:p896:r6","title":"Agno RIS: Concreting of Service Road @ Lateral L (Sta. 6+500 - 7+000)","psgc":"0105524000","municipality":"Malasiqui","province":"Pangasinan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p902:r5","title":"Aklan RIS: Rehabilitation of Aklan RIS - West Side","psgc":"0600413000","municipality":"Malinao","province":"Aklan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y432:ib:p916:r12","title":"Allay Nangcalapan CIS: Construction of Diversion Dam (Sta. 0+000) and Canal Structures","psgc":"0205004000","municipality":"Bambang","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y441:ib:p896:r14","title":"Amro RIS: Construction of Service Road along Brgy. Calantas (Sta. 0+000 - Sta. 0+500)","psgc":"0307702011","municipality":"Casiguran","province":"Aurora","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y123:ib:p912:r15","title":"Apar CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401015001","municipality":"Lobo","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r15","title":"Asingan SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0105506000","municipality":"Asingan","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p913:r15","title":"Bagacay CIS: Repair/Rehabilitation of Canal lining at Sta. 0+235.00 - 0+264.90 Lat. B., Sta. 0+935.50 - 1+572.60 MC, including installation of Sluicegate and Embankment Protection at Diversion","psgc":"0501606004","municipality":"Labo","province":"Camarines Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r16","title":"Balungao SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0105507000","municipality":"Balungao","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y705:ib:p897:r4","title":"Bansud RIS: Concreting of Service Road (N. Lateral C Sta. 0+000.00 - 0+300.00)","psgc":"1705202000","municipality":"Bansud","province":"Oriental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y494:ib:p902:r14","title":"Bao RIS: Repair/Improvement of Canal Lining at Lateral A Sta. 0+528 - 1+188","psgc":"0803738000","municipality":"Ormoc City","province":"Leyte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y685:ib:p897:r3","title":"Batang-Batang RIS: Concreting of Service Road at Lateral C Supply Canal, 0+000.00 - 0+400.00","psgc":"1705315000","municipality":"Narra","province":"Palawan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p16-y235:ib:p918:r16","title":"Bayoyo-ay CIS: Repair of Canal Lining (Modification of Damaged Trapezoidal Canal to Rectangular Canal Sta. 0+511.12 - 0+847.84)","psgc":"1606806001","municipality":"Carmen","province":"Surigao del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y244:ib:p914:r14","title":"Biliran CIS: Repair/Improvement of Downstream Apron and Retaining Wall of Dam","psgc":"0807802000","municipality":"Biliran","province":"Biliran","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p914:r1","title":"Bon-Ot CIS: Repair/Rehabilitation of Canal Lining at Sta 0+481.90 - 0+795.00 of Main Canal, Sta. 0+829.40 - 1+180.00 of MC, and Modification of Aux. Dam from Falling Shutter Type to Ogee Type Dam","psgc":"0506216041","municipality":"City of Sorsogon ","province":"Sorsogon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r8","title":"Bracbac SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y726:ib:p905:r7","title":"CLBRIS (Colo RIS): Canalization of Colo Main Canal","psgc":"0300804007","municipality":"Dinalupihan","province":"Bataan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["clbris","colo"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y381:ib:p905:r19","title":"Cantingas RIS: Construction of Canal Lining & Structures at Sta. 2+000 to 2+300","psgc":"1705913000","municipality":"San Fernando","province":"Romblon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y79:ib:p908:r16","title":"Casala Del Pilar CIS: Construction of Concrete Road at Sta. 1+720.00 - 2+000.00 along Casala Main Canal and Sta. 0+000.00 - 0+280.00 along Del Pilar Main Canal","psgc":"0203131000","municipality":"San Mariano","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y520:ib:p909:r18","title":"Caulaman CIS: Improvement of Service Road","psgc":"0305406000","municipality":"Floridablanca","province":"Pampanga","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y568:ib:p916:r19","title":"Cordero CIS: Improvement of Diversion, and Protection Works","psgc":"0304926000","municipality":"San Jose City","province":"Nueva Ecija","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p910:r17","title":"Dasay CIS: Construction of Canal Protection Works @ Sta. 0+100.00 - 0+140.00, MC and Canal Lining Cover @ Sta. 0+200.00 - 0+400.00, MC","psgc":"0103316016","municipality":"San Juan","province":"La Union","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y387:ib:p897:r18","title":"Dipolo RIS: Concreting of existing Service Road at Dipolo MC1 Sta. 5+165-6+000 and Guitran MC Sta. 1+226-1+440","psgc":"0907308013","municipality":"Dumingag","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y651:ib:p907:r10","title":"East Apayao Abulug Irrigation System: Dam Retrofitting and Strengthening of Gattu Dam (Sluice and Intake)","psgc":"0201518011","municipality":"Pamplona","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y175:ib:p896:r4","title":"Hapid Irrigation System: Construction of Service Road at Barangay Magulon area","psgc":"1402705008","municipality":"Lamut","province":"Ifugao","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p902:r15","title":"Hindang-Hilongos IS: Repair/Improvement of Diversion Works (Slope Protection Uptream)","psgc":"0803719000","municipality":"Hilongos","province":"Leyte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/ANNEX 5 (2.7.25).xlsx","score":1.0,"matchedTerms":["hilongos","hindang"]},{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/EASTERN VISAYAS-RIMP-2023-2030 (1).pdf","score":1.0,"matchedTerms":["hilongos","hindang"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y234:ib:p897:r13","title":"Jalaur RIS: Concreting of NIA Service Road (Extension Area)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y143:ib:p912:r16","title":"Jaybanga CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401015010","municipality":"Lobo","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y405:ib:p911:r10","title":"Lamoy Ubbog CIS: Repair of Intake, Canal Lining (Sta. 0+000 - 1+370 MC) & Canal Structures","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y316:ib:p917:r16","title":"Langca CIS: Restoration of Diversion Dam and Installation of PVC Pipe","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y327:ib:p913:r1","title":"Lapog CIS: Repair of Dam","psgc":"1705214000","municipality":"Socorro","province":"Oriental Mindoro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y234:ib:p916:r3","title":"Libertad CIS: Repair and Construction of Canal","psgc":"1206502015","municipality":"Columbio","province":"Sultan Kudarat","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y272:ib:p905:r15","title":"Lumintao RIS: Construction of Canal Lining and Canal Structure from Sta. 1+782 to Sta. 1+882","psgc":"1705108000","municipality":"Rizal","province":"Occidental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y322:ib:p901:r5","title":"Lumintao RIS: Repair of Canal Lining and Canal Structure from Sta. 0+165 to 0+365 Matabiaga-Malawaan IA","psgc":"1705108004","municipality":"Rizal","province":"Occidental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p908:r9","title":"MBCIIS (Binalawan): Repair of Steelgates, dam mechanization and enclosure of dam mechanization area","psgc":"1804513002","municipality":"Ilog","province":"Negros Occidental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y309:ib:p898:r19","title":"Madongan RIS: Construction of Canal Lining at MR-1 Extension Canal at Sta. 0+000 - 0+650","psgc":"0102809020","municipality":"Dingras","province":"Ilocos Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y402:ib:p940:r9","title":"Magapit Pump Irrigation System: Construction of Canal Lining and Canal Structures","psgc":"0201516023","municipality":"Lal-Lo","province":"Cagayan","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p912:r3","title":"Magsaysay CIS (Panikian Irrigation System): Improvement of Irrigation Facilities of Panikian Check","psgc":"0300811000","municipality":"Pilar","province":"Bataan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y102:ib:p912:r14","title":"Malitlit CIS: Construction / Repair of Irrigation Structures and Canal System","psgc":"0401015000","municipality":"Lobo","province":"Batangas","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y384:ib:p911:r9","title":"Manamtam CIS: Improvement and Repair of Canal Lining & Canal Structures","psgc":"0205004016","municipality":"Bambang","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y110:ib:p908:r17","title":"Masipi East CIS: Construction of Concrete Road at Sta. 0+000 - 0+600 along Main Canal","psgc":"0203106025","municipality":"Cabagan","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p915:r10","title":"Mat-i CIS: Construction of Bench Flume and Other Irrigation Structures","psgc":"1004306015","municipality":"Claveria","province":"Misamis Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y353:ib:p901:r6","title":"Mongpong RIS: Repair of Canal Lining and Canal Structure from Sta. 3+400 to 3+600 MC-8","psgc":"1705109001","municipality":"Sablayan","province":"Occidental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r10","title":"Natividad SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0304909000","municipality":"General Mamerto Natividad","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["general"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["general"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/RESTOCIS-TINDOG CIS-10M/TINDOG CIS GENERAL LAYOUT.jpg","matchedTerms":["general"]}]},{"id":"pair:nep-nia-p07-y322:ib:p905:r17","title":"Pagbahan RIS: Construction of Canal Lining and Canal Structure from Sta. 1+887 to Sta. 2+000 Lateral D1","psgc":"1705111000","municipality":"Santa Cruz","province":"Occidental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y609:ib:p906:r7","title":"Panakuyan RIS: Restoration of Lateral K Canal and Canal Structures and Provision of Gate","psgc":"0600406000","municipality":"Ibajay","province":"Aklan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 6/RESTO-NIS PANAKUYAN RIS - 5M/FINAL RESTO-NIS PANAKUYAN RIS-Copy.pdf","matchedTerms":["panakuyan"]}]},{"id":"pair:nep-nia-p01-y349:ib:p896:r10","title":"Pasa SRIS: Construction of Concrete Road at Sta. 1+680.00 - 2+080.00 along main Canal","psgc":"0203114070","municipality":"City of Ilagan ","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r7","title":"Resureccion SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0105544049","municipality":"Umingan","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r11","title":"Rosales SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y438:ib:p898:r1","title":"Salug RIS: Concreting of Existing Service Roads along Lateral A (Balogo) Sta. 0+000 - 0+214","psgc":"0907328000","municipality":"Tambulig","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y452:ib:p916:r13","title":"Salvacion CIS: Improvement and Repair Canal Lining & Canal Structures","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y540:ib:p909:r19","title":"San Juan CIS: Improvement of Service Road","psgc":"0306905033","municipality":"Concepcion","province":"Tarlac","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r12","title":"San Nicolas SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0105536000","municipality":"San Nicolas","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r14","title":"San Quintin SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0105537000","municipality":"San Quintin","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r13","title":"Santa Maria SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0105539000","municipality":"Santa Maria","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p915:r9","title":"Sigbulan CIS: Construction of Canal Lining and Other Irrigation Structure","psgc":"1004306000","municipality":"Claveria","province":"Misamis Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p09-y574:ib:p908:r8","title":"Sto. Rosario I CIS: Repair of Canal Structures","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y651:ib:p917:r2","title":"Sumucab CIS: Construction of Concrete Canal Lining","psgc":"0403407018","municipality":"Cavinti","province":"Laguna","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y208:ib:p905:r13","title":"TASMORIS (Tarlac RIS): Improvement of Canal Structures at Lateral F Headgate Sta. 0+000 (15°30'59.74\"N, 120°36'7.40\"E) (Repair of Headgate and Declogging of Check)","psgc":"0306916087","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p16-y266:ib:p918:r17","title":"Tagbina CIS: Repair of Closed Conduit Sta. 4+328 - 4+480","psgc":"1606817000","municipality":"Tagbina","province":"Surigao del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y754:ib:p917:r5","title":"Tagumpay CIS: Construction of Canal Lining and its Appurtenant Structures (Sta. 3+603.93 - 4+098 MC)","psgc":"1705208064","municipality":"Naujan","province":"Oriental Mindoro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y747:ib:p905:r8","title":"Tangilad SRIS (Samal): Improvement of Canal System","psgc":"0300812000","municipality":"Samal","province":"Bataan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y284:ib:p939:r2","title":"Taya SIP: Procurement/Delivery/Installation of Pipelines and Construction of Canal & Terminal Structures","psgc":"1401112010","municipality":"Sablan","province":"Benguet","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p922:r9","title":"Tayug SPIP: Procurement/Installation of 1-unit Solar-Powered Pump/Solar Power Driven Pump","psgc":"0105543000","municipality":"Tayug","province":"Pangasinan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y601:ib:p910:r1","title":"Tondo Alusiis CIS: Improvement of Service Road (Main Canal Sta. 0+000 - 0+857)","psgc":"0307104000","municipality":"Castillejos","province":"Zambales","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/FINAL REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["alusiis","tondo"]},{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["alusiis","tondo"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y422:ib:p940:r10","title":"Zinundungan River Irrigation System: Construction of Canal Lining and Canal Structures","psgc":"0201517000","municipality":"Lasam","province":"Cagayan","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y534:ib:p899:r9","title":"Chico River Pump Irrigation System: Improvement of Siphon Along Lateral E","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y286:ib:p897:r14","title":"Bohol Integrated Irrigation System (Malinao IS): Repair and Improvements of Service Road with a length of 300 meters along Main Canal (0+420~0+720)","psgc":"0701234017","municipality":"Pilar","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y736:ib:p897:r5","title":"Pagbahan RIS: Construction of Service Road from Sta. 0+173 to Sta. 0+353 Main Canal","psgc":"1705111000","municipality":"Santa Cruz","province":"Occidental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y418:ib:p897:r19","title":"Salug RIS: Concreting of Existing Service Roads along Lateral A1 West Sta. 0+000 - 0+200","psgc":"0907328000","municipality":"Tambulig","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y644:ib:p897:r2","title":"Sta. Maria RIS: Construction of Service Road","psgc":"0403427000","municipality":"Santa Maria","province":"Laguna","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p16-y194:ib:p918:r14","title":"Busok CIS: 1. Repair of Main Canal Sta. 0+000 - Sta. 0+241","psgc":"1401101000","municipality":"Atok","province":"Benguet","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y589:ib:p916:r20","title":"Pasama CIS: Improvement Canal System","psgc":"0305411000","municipality":"Magalang","province":"Pampanga","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p910:r8","title":"Coog CIS: Repair of Diversion structure of Main Pipeline 01; Concreting of the Canal Lining; Installation of HDPE Pipeline, Construction of Canal Structures & Terminal Facilities (reservoir tank)","psgc":"1401106006","municipality":"Itogon","province":"Benguet","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y631:ib:p898:r8","title":"Mlang RIS: Road Concreting of Service Road at Main Canal Sta. 0+370 - 0+620","psgc":"1204710000","municipality":"M'Lang","province":"Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y685:ib:p915:r14","title":"Raradangan CIS: Construction of Canal Lining at Main Canal Sta. 0+340 - 0+420 and Lateral A Sta. 0+000 - 0+270","psgc":"1204701017","municipality":"Alamada","province":"Cotabato","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y286:ib:p916:r6","title":"Elengan CIS: Installation of Pipeline and Construction of Tower and Anchor for the Suspended Pipelines","psgc":"1401105006","municipality":"Buguias","province":"Benguet","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y369:ib:p896:r11","title":"Addalam River Irrigation System (ADRIS): Construction of Concrete Road along Lateral A at Station 6+500.00 - Station 7+150","psgc":"0205701000","municipality":"Aglipay","province":"Quirino","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p15-y153:ib:p917:r10","title":"Baniaga CIS: Restoration of Steel Pipe Siphon at Main Canal Sta. 0+815.00 - 0+827.00","psgc":"0502003000","municipality":"Bato","province":"Catanduanes","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y255:ib:p916:r5","title":"Barangay Nawal CIS: Replacement the old and deteriorated ordinary pipeline into HDPE pipe; Construction of Canal Lining","psgc":"1401104007","municipality":"Bokod","province":"Benguet","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p939:r5","title":"Basco SIP: Construction of 1 Unit Rain Collector, HDPE Pipe Lining, Painting Works and Waterproofing (Phase 2)","psgc":"0000000000","municipality":"","province":"","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y240:ib:p910:r9","title":"Bedbed CIS: Repair of the Dilapidated Pipeline; Construction of Reservoir Tank","psgc":"1401111002","municipality":"Mankayan","province":"Benguet","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y152:ib:p909:r1","title":"Benay Wangeon CIS: Construction of Concrete Road","psgc":"0205007013","municipality":"Dupax del Norte","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y172:ib:p909:r2","title":"Bone CIS: Construction of Concrete Road","psgc":"0205002003","municipality":"Aritao","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y381:ib:p916:r9","title":"Bued #1 CIS: Construction of Canal Lining and Slope Protection Works @ Sta. 0+760.00 - 0+820.00, MC","psgc":"0103313000","municipality":"Rosario","province":"La Union","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y236:ib:p940:r4","title":"Burabod-Anibongon CIP: Construction/Improvement of Canal System","psgc":"0803723000","municipality":"Jaro","province":"Leyte","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y705:ib:p910:r3","title":"Cabidianan CIS: Concreting of Service Roads along Lateral B1 Sta. 0+000 to Sta. 0+400 to provide easy access for the delivery of agricultural products","psgc":"1108209000","municipality":"Nabunturan ","province":"Davao de Oro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y367:ib:p914:r22","title":"Catituan CIS: Repair of Cut and Cover and Road Crossing at Main Canal Construction of Canalization at Main Canal (Unlined 500m)","psgc":"0908308006","municipality":"Malangas","province":"Zamboanga Sibugay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y275:ib:p909:r7","title":"Gabriela Silang CIS: Construction of Concrete Road (Station 0+000.00 - Station 0+610.00)","psgc":"0205703013","municipality":"Diffun","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p14-y214:ib:p916:r2","title":"Kamalig CIS: Repair of Lateral Canal","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y102:ib:p897:r7","title":"Libmanan-Cabusao PIS: Concreting of Service Road along Main Canal (Sta. 2+718.00 - 2+754.00)","psgc":"0501718000","municipality":"Libmanan","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_3. DPWH Convergence Program to NIA FY 2025.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 7_1. Identfied Areas and Systems for NIA Contract Farming.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["cabusao","libmanan"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y609:ib:p916:r21","title":"Lower Prenza CIS: Improvement of Canal System of Lower Prenza CIS Sta. (0+000 - 0+300)","psgc":"0307105012","municipality":"Iba","province":"Zambales","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p906:r4","title":"Lower-Lalo RIS: Restoration of Canal Lining at RAMC 16 (Sta. 0+018.5 - 0+586.5, RAMC 16 A 0+067 - 0+308, RAMC 17 0+150 - 0+506, RAMC 17A 1+853.5 - 2+120, RAMC 14-1 0+000 - 0+109.5, RAMC 15-A 0+886.2 - 0+994.5","psgc":"0501723000","municipality":"Nabua","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y493:ib:p899:r7","title":"Magapit Pump Irrigation System: Improvement of Canals and Canal Structures","psgc":"0201516023","municipality":"Lal-Lo","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y132:ib:p908:r18","title":"Matuno Sto. Domingo CIS: Construction of PCCP Service Road","psgc":"0205004000","municipality":"Bambang","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y135:ib:p910:r7","title":"Miral SRIS: Concreting of Service Road along LMC2-Road 1 at Sta. 0+000.00 - 0+500 to provide easy access for the delivery of agricultural products","psgc":"1102401000","municipality":"Bansalan","province":"Davao del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 3_Irene_09222023 - Irene Separa.xlsx","score":1.0,"matchedTerms":["miral","sris"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 4_Irene_09222023 - Irene Separa.xlsx","score":1.0,"matchedTerms":["miral","sris"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 6_Irene_09222023 - Irene Separa.xlsx","score":1.0,"matchedTerms":["miral","sris"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex-5_Irene_01302024_basis-for-June-13-2024-presentation_FINAL-DATA.xlsx","score":1.0,"matchedTerms":["miral","sris"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 7_Irene_edited.xlsx","score":1.0,"matchedTerms":["miral","sris"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y687:ib:p914:r3","title":"Natuyay CIS: Typhoon Tino: Construction of Dam, Slope Protection, Repair of Siphon and Construction","psgc":"1804524000","municipality":"City of San Carlos","province":"Negros Occidental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p940:r1","title":"Owacan - Pacuan SIP: Construction Canal and Canal Structures (Sta. 0+440 - 1+190)","psgc":"1804612020","municipality":"Jimalalud","province":"Negros Oriental","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y570:ib:p898:r6","title":"Padada RIS: Concreting of Service Road along Parat RMC at Sta. 0+000.00 - 0+300 to provide easy access for the delivery of agricultural products","psgc":"1102411000","municipality":"Padada","province":"Davao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p899:r11","title":"Pasa SRIS: Repair of Canal Lining at Sta. 2+246-2+280 and 2+930-2+960 along lateral A Sta. 0+107 - 0+529 along Lateral D","psgc":"0203114070","municipality":"City of Ilagan","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y761:ib:p939:r20","title":"Samac-Abis SIP: Construction of Canal & Canal Structures (Sta. 0+114 - 0+820)","psgc":"1804614000","municipality":"Mabinay","province":"Negros Oriental","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y667:ib:p914:r2","title":"San Florentino CIS: Repair and Construction of Canal and Dam Structures","psgc":"0603042009","municipality":"San Rafael","province":"Iloilo","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y285:ib:p914:r17","title":"Upper Bobongan CIS: Rehabilitation of Diversion Works","psgc":"0907205005","municipality":"Labason","province":"Zamboanga del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y513:ib:p899:r8","title":"Zinundungan River Irrigation System: Improvement of Canals and Canal Structures","psgc":"0201517000","municipality":"Lasam","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y216:ib:p902:r8","title":"Pangiplan RIS: Construction of Slope Protection, Concreting of Bench flume Lareral D-2","psgc":"1804510000","municipality":"City of Himamaylan","province":"Negros Occidental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y314:ib:p939:r3","title":"Alang Bayoyo SIP: Procurement/Delivery/Installation of Pipelines; Construction of Pumphose and Installation of Pumpset and Construction of Terminal Structures","psgc":"1401105014","municipality":"Buguias","province":"Benguet","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y155:ib:p896:r3","title":"West Apayao Abulug Irrigation System: Concreting of Existing Service Road","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y420:ib:p896:r13","title":"MAGAT-RIS: Concreting of Canal Service Road Along - OC-4, Sta. 0+000 - 0+200 (0.200 km)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y644:ib:p918:r8","title":"Baking CIS: Repair of Canal Lining","psgc":"0907333001","municipality":"Lakewood","province":"Zamboanga del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p30-y216:ib:p940:r3","title":"Langit CIP: Improvement of Canal System","psgc":"0803702026","municipality":"Alangalang","province":"Leyte","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y316:ib:p909:r9","title":"Lower Villahermosa CIS: Construction of Concrete Road (Station 0+000.00 - Station 0+550.00)","psgc":"0205704029","municipality":"Maddela","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"house_only:ib:p917:r13","title":"PANDAN SWIS: Restoration of Canal Structures along Sta. 2+939.00 - 2+977.50 of MC, Sta. 3+734.20 - 3+794.50 of MC, and Sta. 0+219.60 - 0+231.00 of MC","psgc":"0600611000","municipality":"Pandan","province":"Antique","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y473:ib:p916:r14","title":"South Balligui CIS: Improvement of HDPE Pipelines, and Construction of Protection Works along HDPE Pipelines at Station 4+375.00 - Station 5+215.00","psgc":"0205704003","municipality":"Maddela","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p12-y306:ib:p912:r24","title":"Tanyag CIS: Construction of Canal Lining and Canal 0+000 to 0+030","psgc":"1705102007","municipality":"Calintaan","province":"Occidental Mindoro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y465:ib:p907:r5","title":"Alip RIS: Improvement of Intake","psgc":"1908806000","municipality":"Datu Paglas","province":"Maguindanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y193:ib:p909:r3","title":"Ditabuan SPIS: Construction of Concrete Road at (Station 0+000.00 - Station 0+550.00)","psgc":"0205701014","municipality":"Aglipay","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p11-y260:ib:p910:r10","title":"Gayang CIS: Repair of Canal Structures and Installation of Pipeline","psgc":"1404406000","municipality":"Paracelis","province":"Mountain Province","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y544:ib:p904:r19","title":"Iguig Alcala Amulung Pump Irrigation System: Improvement and Repair of Canal Lining and Canal Structures","psgc":"0201504000","municipality":"Amulung","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p08-y485:ib:p907:r6","title":"Kabulnan RIS: Repair of 0.300-km Concrete Canal at Lateral RH-2 Sta. 5+086 - 5+386 and 1- unit Canal Structure","psgc":"1908803000","municipality":"Datu Abdullah Sangki","province":"Maguindanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p906:r2","title":"Lower-Lalo RIS: Restoration of 5 Intake Gates and Forebay Intake Structure Fence and Concrete Slab, RALCC A-3 Extension (Sta. 0+234 - 0+650), Replacement of Road Crossing at RALCCA-3 (Sta. 0+000 - 0+006), Replacement of Road crossing at RALCCA (Sta. 0+030 - 0+050)","psgc":"0501723000","municipality":"Nabua","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p902:r4","title":"San Francisco RIS: Repair of Canal Lining along Sta. 0+522.70-1+720.00, Canal Structure along Sta. 0+377.50, 0+52270, 1+900.00 of Main Canal, Sta. 0+000 - 0+400.00 of Sublateral A","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PHOTOS-SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PROJECT LAYOUT- SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/SERVICEROADNIS-SAN FRANCISCO RIS-1.25M.pdf","matchedTerms":["francisco","san"]}]},{"id":"house_only:ib:p902:r3","title":"San Ramon RIS: Repair of Canal Structures along Sta. 6+204.90 - 6+207.90, Sta 2+408.16 CL of Main Canal, Concreting of Sublateral Canals 0+000.00-0+300 including Electrification for Diversion's Water Master's Quarter and Automated Gates","psgc":"0506203000","municipality":"Bulan","province":"Sorsogon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y430:ib:p902:r11","title":"Sta. Agueda-Datagon IS: Repair of Lined Canal at Naga Intake (Sta. 0+300 - 0+650)","psgc":"1804616000","municipality":"Pamplona","province":"Negros Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[{"plan":"NIMP","region":"NATIONAL","file":"NATIONAL IRRIGATION MASTER PLAN (NIMP)/NIMP Abridged_per page.pdf","score":1.0,"matchedTerms":["agueda","datagon"]}],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y672:ib:p917:r3","title":"Sta. Isabel CIS: Rehabilitation of Existing Check Structure and Construction of Concrete Canal Lining","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y121:ib:p915:r18","title":"Blingkong CIS: 3. Levelling of Canal Outlet to Palavilla CIS 4. Remove and replace of Lateral Canal (L=300 m)","psgc":"1206507003","municipality":"Lutayan","province":"Sultan Kudarat","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r16","title":"Dabobo CIS: Repair of Canal Lining along Lateral A at Station 0+000 - 0+525.00; Repair of Canal Structures along Main Canal at Station 0+000.00 (Intake), along Lateral A at Station 0+160.00 (Thr. Crossing), Station 0+330.00 (Thr. Crossing)","psgc":"0205704000","municipality":"Maddela","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p02-y530:ib:p898:r4","title":"Saug RIS: Road Concreting along Lateral A West Sta. 0+300-1+000","psgc":"1102301000","municipality":"Asuncion","province":"Davao del Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y689:ib:p903:r18","title":"Kabacan RIS: Concreting of Canal at PACD2 Sta. 0+425 - 0+635","psgc":"0000000000","municipality":"","province":"Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y729:ib:p903:r20","title":"Libungan RIS: Construction of Slope Protection @ Sadaan Glad MD (35m)","psgc":"1204705000","municipality":"Libungan","province":"Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p906:r3","title":"Lower-Lalo RIS: Restoration of Main Canal (5+982.80 - 6+022.80, 9+595.60 -9+780.60) and Repair of Canal Lining (RAMC 16 Sta. 0+018.5 - 0+100.00)","psgc":"0501723000","municipality":"Nabua","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y629:ib:p917:r1","title":"Cavinti CIS: Rehabilitation of Existing Check Structure and Construction of Concrete Canal Lining","psgc":"0403407000","municipality":"Cavinti","province":"Laguna","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y124:ib:p896:r2","title":"Abra River Irrigation System: Construction of Service Road w/ Protection Works and Appurtenant Structures; Drainage Crossing","psgc":"1400124000","municipality":"Tayum","province":"Abra","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y391:ib:p899:r3","title":"Amburayan RIS: Repair of Canal Lining @Sta. 12+681.00 - 12+751.00, MC","psgc":"0103319000","municipality":"Sudipen","province":"La Union","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y442:ib:p904:r14","title":"Baggao Irrigation System: Construction of Canal Lining along Main Canal","psgc":"0201506000","municipality":"Baggao","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y523:ib:p904:r18","title":"Banurbur Creek Irrigation System: Improvement and Repair of Canal Lining and Canal Structures","psgc":"0201516000","municipality":"Lal-Lo","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/Annexes_rev06.pdf","score":1.0,"matchedTerms":["banurbur","creek"]},{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/[RIMP-R2] FINAL CONSOLIDATED RIMP -MAIN REPORT - JULY 15, 2024.pdf","score":1.0,"matchedTerms":["banurbur","creek"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y503:ib:p904:r17","title":"Baua River Irrigation System: Improvement and Repair of Canal Lining and Canal Structures","psgc":"0201514000","municipality":"Gonzaga","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/Annexes_rev06.pdf","score":1.0,"matchedTerms":["baua","river"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y512:ib:p918:r3","title":"Capul CIS: Repair and Improvement of Canals and Structures","psgc":"0804804000","municipality":"Capul","province":"Northern Samar","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y573:ib:p918:r5","title":"Davuy CIS: Proposed Construction and Repair of Canals and Canal Structures","psgc":"0931700078","municipality":"City of Zamboanga","province":"Zamboanga del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y193:ib:p916:r1","title":"Diaz CIS: Repair of Canal and Repair of Protection Works at Siphon","psgc":"1608507005","municipality":"Tubajon","province":"Surigao del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y717:ib:p915:r15","title":"Dinganen CIS: Concreting 0.54-km Earth Canal at Supplemental Canal Station 0 + 643.48 - 1+ 200 and 3-unit Canal Structures","psgc":"1908702005","municipality":"Buldon","province":"Maguindanao del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y336:ib:p909:r10","title":"Disolon CIS: Construction of Service Road along Brgy. Ditinigyan (Sta. 0+000 - Sta. 0+300)","psgc":"0307702022","municipality":"Casiguran","province":"Aurora","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y153:ib:p915:r19","title":"Dona Helene CIS: Repair of Canal","psgc":"1608501006","municipality":"Basilisa","province":"Dinagat Islands","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y575:ib:p904:r20","title":"Dummun River Irrigation System: Improvement and Repair of Canal Lining and Canal Structures","psgc":"0201513025","municipality":"Gattaran","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y462:ib:p904:r15","title":"East Apayao Abulug Irrigation System: Construction of Canal Lining and Canal Structures","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y665:ib:p918:r9","title":"Guilawa CIS: Installation of Steel Gates at Diversion Dam and Repair of Main Canal","psgc":"0908308011","municipality":"Malangas","province":"Zamboanga Sibugay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y736:ib:p910:r4","title":"Kidawa CIS: Concreting of Service Road at Main Canal of Tagmanok Dam from Sta. 0+351 to Sta. 0+751 to provide easy access for the delivery of agricultural products","psgc":"1108202008","municipality":"Laak","province":"Davao de Oro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y337:ib:p916:r8","title":"Lichan Tumhar CIS: Restoration of Canal Lining","psgc":"1404405001","municipality":"Natonin","province":"Mountain Province","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y594:ib:p905:r1","title":"Lower Chico River Irrigation System: Improvement and Repair of Canal Lining and Canal Structures","psgc":"0201528005","municipality":"Tuao","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p899:r13","title":"Mallig River Irrigation System: Construction of Structured Wall Pipe at Station 1+970.55-2+000.5 along Main Canal","psgc":"0203119000","municipality":"Mallig","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p899:r5","title":"Masalip RIS: Canal Lining @ Sta. 3+070.00 - 3+150.00, Sta. 3+829.00 - 3+925.50, Sta. 3+968.40 - 4+031.40, Sta. 4+061.50 - 4+126.50, Sta. 4+602.30 - 4+617.60, Lat. A-Extra and Repair of Road Crossing @ Sta. 3+240.00+3+269.00","psgc":"0103320000","municipality":"Tubao","province":"La Union","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/(Service-Road) MASALIP RIS.pdf","matchedTerms":["masalip"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/299c02e2-6629-41d2-9fa1-2085887bb504.jpg","matchedTerms":["masalip"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/ca05457f-18a1-4b44-99af-2090d72ef4da.jpg","matchedTerms":["masalip"]}]},{"id":"pair:nep-nia-p11-y301:ib:p910:r12","title":"Natonin CIS: Repair of intake and Canal Lining with Canal Protection","psgc":"1404405000","municipality":"Natonin","province":"Mountain Province","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y492:ib:p918:r2","title":"Palanit CIS: Repair and Improvement of Canals and Structures","psgc":"0804818009","municipality":"San Isidro","province":"Northern Samar","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y266:ib:p914:r16","title":"San Isidro Bunguiao CIS: Proposed Construction and Repair of Canals and Canal Structures","psgc":"0931700013","municipality":"City of Zamboanga","province":"Zamboanga del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y605:ib:p899:r12","title":"San Pablo-Cabagan IS: Construction of Concrete Canal Lining at Stations 2+612.97 - 2+780.00 along Main Canal","psgc":"0203133000","municipality":"San Pablo","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/[RIMP-R2] FINAL CONSOLIDATED RIMP -MAIN REPORT - JULY 15, 2024.pdf","score":1.0,"matchedTerms":["cabagan","pablo","san"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y594:ib:p918:r6","title":"San Pedro Gutayan CIS: Restoration and Construction of Canalization (2 + 734.91 - 4 + 000) and Canal Structures","psgc":"0907225014","municipality":"Godod","province":"Zamboanga del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p916:r15","title":"Sangbay 1 CIS: Improvement of Canal Lining along MC at Station 0+155.00 - 0+160.00, 0+518.00 - 0+525.00, 2+392.00 - 2+692.00; Improvement of Canal Structures along MC at Station 0+118.00 - 0+145.00 (Siphon), 1+762.00 - 1+789.00 (Road Crossing)","psgc":"0205706014","municipality":"Nagtipunan","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p14-y547:ib:p916:r18","title":"Sapang Dayap: Improvement of Canal System (0+000 to 0+100)","psgc":"0301419031","municipality":"San Ildefonso","province":"Bulacan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y615:ib:p905:r2","title":"Solana Pump Irrigation System: Improvement and Repair of Canal Lining and Canal Structures","psgc":"0201527019","municipality":"Solana","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y122:ib:p897:r8","title":"Tigman-Hinagyanan-Inarihan RIS: Concreting of Service Road along Turnout #10 Sta. 0+000.00 - 0+270.00","psgc":"0501704000","municipality":"Bombon","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_2 Summary of Identified Irrigation Projects per Municipality.xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/R5_ANNEX D - INVESTMENT PROGRAM [Annex 5 v Main Document Write Up] (1).xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y195:ib:p896:r5","title":"Upper Chico River Irrigation System: Construction of Protection Works and Portland Cement Concrete Pavement (PCCP) with Embankment","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p911:r17","title":"Villarose CIS: Repair of Canal Lining along Main Canal at Station 0+000.00 - 0+300.00; Construction of Canal Cover at Station 0+149.00 - 0+175.00, Station 0+235.00, Station 1+400.00 - 1+518.00, Station 1+700.00 - 2+025.00; Repair of Canal Structures at Station 0+030.80 (Spillway), Station 0+175.00 (Overhead Drainage), Station 0+235.00 (Overhead Drainage), Station 0+790.00 (Overhead Drainage); Desilting at Station 1+400.00 - 1+518.00, Station 1+700.00 - 2+200.00","psgc":"0205702012","municipality":"Cabarroguis ","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p06-y482:ib:p904:r16","title":"Visitacion Irrigation System: Construction of Canal Lining along Main Canal and Lateral A","psgc":"0201523003","municipality":"Santa Ana","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y266:ib:p896:r7","title":"Amburayan RIS: Concreting of Canal Service Road w/ Pavement Protection @ Sta. 6+000.00 - Sta. 6+070.00, MC","psgc":"0103319000","municipality":"Sudipen","province":"La Union","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p07-y588:ib:p906:r6","title":"Cabilogan-San Juan RIS: Restoration of Sub-Lateral C-2-1 (Sta. 0+000 - 0+250)","psgc":"0500508000","municipality":"City of Ligao","province":"Albay","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_4. Detailed Damage_Losses_Recovery and Reconstruction Needs Agriculture and Fisheries Subsector.xlsx","score":1.0,"matchedTerms":["cabilogan","juan","san"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p909:r4","title":"Lower Nagbitin CIS: Construction of Concrete Road (Station 0+000.00 - Station 0+400.00)","psgc":"0205014004","municipality":"Villaverde","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y254:ib:p909:r6","title":"Mangandingay CIS: Construction of Concrete Road (Station 0+000.00 - Station 0+400.00)","psgc":"0205702008","municipality":"Cabarroguis ","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p10-y234:ib:p909:r5","title":"Maria Clara CIS: Construction of Concrete Road (Station 0+000.00 - Station 0+400.00)","psgc":"0806407041","municipality":"City of Maasin ","province":"Southern Leyte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y393:ib:p901:r8","title":"Bansud RIS: Concreting of Canal Lining Lateral AX Sta. 0+000.00 - 0+300.00)","psgc":"1705202000","municipality":"Bansud","province":"Oriental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y674:ib:p910:r2","title":"Cang-atuyom CIS: Repair and Improvements of Service Roads from Sta. 0+000 to Sta. 0+156.00 leading to barangay road","psgc":"1806106006","municipality":"Siquijor","province":"Siquijor","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y615:ib:p897:r1","title":"PRIS-SDC PH2: Construction of Portland Cement Concrete Pavement (PCCP) at Sub-Lateral L-5 (Sta. 0+000 - STA. 0+440)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p896:r18","title":"PRIS-SDC: Improvement of Irrigation Canal Roadways (Science City of Muñoz area) PCCP Lateral E Sta.5+870-6+040","psgc":"0304917000","municipality":"Science City of Muñoz","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y491:ib:p896:r16","title":"Penaranda RIS: Construction of PCCP as Solar Dryer @ Lateral C Extension, Sta. 0+000-0+260","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y512:ib:p896:r17","title":"TRIS Lower: Construction of PCCP at Lateral G3b TRIS Lower at Sta. 1+237.78 - 1+404.28","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y580:ib:p915:r13","title":"Dakinus CIS: Repair/Rehabilitation of Existing Dilapidated Canal at Sta. 0+661.00 to Sta. 0+671.00 along Main Canal","psgc":"1102407000","municipality":"Magsaysay","province":"Davao del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y438:ib:p909:r15","title":"Cadaclan CIS: Construction of Service Road along Brgy. Cadaclan (Sta. 0+000 - Sta. 0+210)","psgc":"0304920001","municipality":"Pantabangan","province":"Nueva Ecija","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p03-y370:ib:p899:r2","title":"Amburayan RIS: Repair of Canal Lining @ Sta.15+963.00 - 15+993.00, MC","psgc":"0103319000","municipality":"Sudipen","province":"La Union","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y193:ib:p917:r12","title":"BURACAN CIS: Restoration of Irrigation Facilities, Concrete Canal Lining of Earth Canal at Main Canal Sta. 5+172 - 5+372","psgc":"0504108005","municipality":"Dimasalang","province":"Masbate","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p902:r2","title":"Barit RIS: Repair/Rehabilitation of Canal Embankment at Sta. 0+048.20 - 0+117.25, Repair of Steel Gates and Intake Gates #2, #3, and #4, and Installation of Sluice Gate's Llifting Cable","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y81:ib:p910:r5","title":"Bunawan-Kipalili CIS: Road Concreting along Main Canal Sta. 0+000 - 0+155","psgc":"1102301000","municipality":"Asuncion","province":"Davao del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 4_Irene_09222023 - Irene Separa.xlsx","score":1.0,"matchedTerms":["bunawan","kipalili"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 9_Nice_01032024 - 3Yr Implementation Program CIS - NIA XI Operation and Maintenance Section.xlsx","score":1.0,"matchedTerms":["bunawan","kipalili"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/R11 RIMP 2023-2030_07262024.pdf","score":1.0,"matchedTerms":["bunawan","kipalili"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 11/3. Service Road CIS/Bunawan Kipalili CIS_2M/BUNAWAN KIPALILI CIS_2M_service road CIS_POW.pdf","matchedTerms":["bunawan","kipalili"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 11/3. Service Road CIS/Bunawan Kipalili CIS_2M/Bunawan Kipalili CIS_service road cis_photo.jpg","matchedTerms":["bunawan","kipalili"]}]},{"id":"house_only:ib:p917:r9","title":"Cotmon CIS: Restoration of Damaged Main Canal (Sta. 0+610.00–0+910.00)","psgc":"0500502014","municipality":"Camalig","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y133:ib:p917:r8","title":"Cotmon CIS: Restoration of Main Canal (Sta. 0+310.10 - 0+610.00)","psgc":"0500502014","municipality":"Camalig","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y624:ib:p918:r7","title":"Dagohoy CIS Extension: Repair of Damage Canal Lining","psgc":"0907343006","municipality":"Guipos","province":"Zamboanga del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 2/MPIS_Extension NIS 5m.pdf","matchedTerms":["extension"]}]},{"id":"pair:nep-nia-p13-y326:ib:p914:r20","title":"Dawa CIS: Repair of Pipeline at Main Canal 1 Sta. 4+305.98-4+703.41","psgc":"0907337002","municipality":"Josefina","province":"Zamboanga del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y280:ib:p910:r11","title":"Favarey CIS: Repair of Canal Lining and Canal Structures","psgc":"1404408008","municipality":"Sadanga","province":"Mountain Province","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y173:ib:p917:r11","title":"JAMORAWON CIS: Restoration of Canal at Lateral A Sta. 0+415 - 0+615","psgc":"0504112010","municipality":"Milagros","province":"Masbate","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y768:ib:p914:r6","title":"Kalumboyan CIS: Repair of Main Canal Cut and Cover (Sta. 0+060 - 0+180)","psgc":"1804606010","municipality":"City of Bayawan","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y746:ib:p918:r12","title":"Kidawa CIS: Repair of Damaged 200m Lined Canal along Main Canal of Tagmanok Dam and Repair of Existing Drainage at Koo Creek","psgc":"1108202008","municipality":"Laak","province":"Davao de Oro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y685:ib:p918:r10","title":"La Dicha CIS: Construction of Canalization and Canal Structures at Lateral B (Sta. 0+000-0+033; 0+041-0+071;0+290-0+368)","psgc":"0908308014","municipality":"Malangas","province":"Zamboanga Sibugay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y652:ib:p898:r9","title":"Lambayong RIS: Road Surfacing 1. Lateral D4 (Sta. 0+000-1+300) L=1,300 mts","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p11-y101:ib:p910:r6","title":"Lanuro CIS: Concreting of Service Road along main canal to provide easy access for the delivery of agricultural products","psgc":"1102404011","municipality":"Hagonoy","province":"Davao del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y305:ib:p914:r19","title":"Limas CIS: Repair of Teruvian Intake","psgc":"0907344009","municipality":"Tigbao","province":"Zamboanga del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y600:ib:p898:r7","title":"Mal RIS: Concreting of Service Road along RMC and RMC Supplementary at Sta. 0+000.00 - 0 + 150 to provide easy access for the delivery of agricultural products","psgc":"1102410000","municipality":"Matanao","province":"Davao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p01-y297:ib:p896:r8","title":"Masalip RIS: Concreting of Canal Service Road w/ Pavement Protection @ Sta. 4+830.00 to Sta. 4+880.00, MCA","psgc":"0103320000","municipality":"Tubao","province":"La Union","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/(Service-Road) MASALIP RIS.pdf","matchedTerms":["masalip"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/299c02e2-6629-41d2-9fa1-2085887bb504.jpg","matchedTerms":["masalip"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/ca05457f-18a1-4b44-99af-2090d72ef4da.jpg","matchedTerms":["masalip"]}]},{"id":"pair:nep-nia-p03-y411:ib:p899:r4","title":"Masalip RIS: Repair of Canal Lining @ Sta. 0+127.00-0+224.70, Sta. 0+242.70-0+351.00, Lat. A","psgc":"0103320000","municipality":"Tubao","province":"La Union","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/(Service-Road) MASALIP RIS.pdf","matchedTerms":["masalip"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/299c02e2-6629-41d2-9fa1-2085887bb504.jpg","matchedTerms":["masalip"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/ca05457f-18a1-4b44-99af-2090d72ef4da.jpg","matchedTerms":["masalip"]}]},{"id":"house_only:ib:p915:r11","title":"Nuevo Iloco CIS: Repair of Damaged Elevated Flume along Main Canal of Hijo Dam from Station 1+450 to 1+556","psgc":"1108206006","municipality":"Mawab","province":"Davao de Oro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 9_Nice_01032024 - 3Yr Implementation Program CIS - NIA XI Operation and Maintenance Section.xlsx","score":1.0,"matchedTerms":["iloco","nuevo"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex-5_Irene_01302024_basis-for-June-13-2024-presentation_FINAL-DATA.xlsx","score":1.0,"matchedTerms":["iloco","nuevo"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 7_Irene_edited.xlsx","score":1.0,"matchedTerms":["iloco","nuevo"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/R11 RIMP 2023-2030_07262024.pdf","score":1.0,"matchedTerms":["iloco","nuevo"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y112:ib:p917:r7","title":"SS MISAN CIS: Restoration of Diversion Works at Dam #1 (Sta. 0+000)","psgc":"0500516023","municipality":"Santo Domingo","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y586:ib:p939:r12","title":"Sigamot CIP: Construction of Checkgate (Sta. 0+000.00) - (Phase 2)","psgc":"0501718065","municipality":"Libmanan","province":"Camarines Sur","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y418:ib:p909:r14","title":"Sta. Lucia Old CIS: Construction of Service Road along Brgy. Sta. Lucia Old (Sta. 0+000 - Sta. 0+200)","psgc":"0304932024","municipality":"Zaragoza","province":"Nueva Ecija","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y560:ib:p915:r12","title":"Upper Tuganay CIS: Canal Heightening at Main Canal Sta. 0+000-0+170","psgc":"1102303022","municipality":"Carmen","province":"Davao del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 4_Irene_09222023 - Irene Separa.xlsx","score":1.0,"matchedTerms":["tuganay","upper"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 9_Nice_01032024 - 3Yr Implementation Program CIS - NIA XI Operation and Maintenance Section.xlsx","score":1.0,"matchedTerms":["tuganay","upper"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 11/2. Repair CIS/Upper Tuganay CIS- 2M/UPPER TUGANAY CIS_2M_POW.pdf","matchedTerms":["tuganay","upper"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 11/2. Repair CIS/Upper Tuganay CIS- 2M/Upper Tuganay CIS_repair CIS_photos.JPG","matchedTerms":["tuganay","upper"]}]},{"id":"pair:nep-nia-p02-y550:ib:p898:r5","title":"Lasang RIS: Road Concreting along Lateral A4 Sta. 0+000-0+150","psgc":"1102315021","municipality":"City of Panabo","province":"Davao del Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p05-y750:ib:p904:r1","title":"Alip RIS: Concreting of 0.250 km Earth Canal Sedada MC Sta. 1+390 - 1+640","psgc":"1908806000","municipality":"Datu Paglas","province":"Maguindanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p06-y81:ib:p904:r2","title":"Kabulnan RIS: Repair of 0.100-km Main Canal at Main Cana Sta. 0+000 - 0+100","psgc":"1908803000","municipality":"Datu Abdullah Sangki","province":"Maguindanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p918:r1","title":"Gabayan CIS: Improvement / Installation of Pipeline Pipeline (Main Pipe from Reservoir #1 to Reservoir #2 @ Sta. 0+000 to Sta. 0+200, Lateral 1 @ Reservoir #1 Sta. 0+000 to Sta. 0+400, Lateral 1 @ Reservoir #2 Sta. 0+000 to Sta. 0+300, Lateral 2 @ Reservoir #2 Sta. 0+000 to Sta. 0+300, Lateral 3 @ Reservoir #2 Sta. Sta. 0+000 to 0+400, Sub-lateral 1 @ Reservoir #2 Sta. 0+000 to Sta. 0+400 and Lateral 1 @ Reservoir #3 Sta. 0+000 to 0+500)","psgc":"0701211000","municipality":"Candijay","province":"Bohol","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y672:ib:p898:r10","title":"Alip RIS: Road concreting of 0.090-km linking Road Lat. B to Damawato Road Sta. 0+000 - 0+090","psgc":"1908806000","municipality":"Datu Paglas","province":"Maguindanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p898:r3","title":"Batutu RIS: Concreting of Service Roads along MC East Sta. 0+749.2 to Sta. 0+849.2 (Cogonon) to provide easy access for the delivery of agricultural products","psgc":"1108210004","municipality":"New Bataan","province":"Davao de Oro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p914:r10","title":"Budlasan CIS: Repair of Right Main Canal (Sta. 1+250 - 1+380, Sta. 1+520 - 1+670, Sta. 1+800 - 1+930)","psgc":"1804611000","municipality":"City of Guihulngan","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p901:r11","title":"Daet-Talisay RIS: Repair/Improvement of Canal Lining at Sta. 0+000-0+514.20, Lat. A-1b; Installation of Diesel Engine Pump at Tail end of Lateral A1 and Lateral A1c","psgc":"0501603000","municipality":"Daet ","province":"Camarines Norte","program":"National Irrigation System Sub-Program","nimpMatches":[{"plan":"NIMP","region":"NATIONAL","file":"NATIONAL IRRIGATION MASTER PLAN (NIMP)/NIMP Abridged_per page.pdf","score":1.0,"matchedTerms":["daet","talisay"]}],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["daet","talisay"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/CY 2027 POW-DAET-TALISAY RIS- 5.2M.pdf","matchedTerms":["daet","talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["daet","talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/PHOTOS-DTRIS-SERVICE ROADSNIS-5.2M.pdf","matchedTerms":["daet","talisay"]}]},{"id":"pair:nep-nia-p13-y81:ib:p914:r7","title":"Jimalalud CIS: Repair of Main Canal (Sta. 0+200 - 0+250)","psgc":"1804612000","municipality":"Jimalalud","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y702:ib:p898:r11","title":"Kabulnan RIS: Concreting of 0.090-km Service Road at Left Main Canal Sta. 0+550-0+640","psgc":"1908803000","municipality":"Datu Abdullah Sangki","province":"Maguindanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y748:ib:p914:r5","title":"Luan-luan CIS: Repair of Elevated Flume (Sta. 0+120 - 0+140)","psgc":"1804619000","municipality":"Siaton","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p12-y377:ib:p913:r3","title":"Pili Sur CIS: Improvement of Concrete Canal Lining and Structures at Sta. 1+380 - 1+480","psgc":"1705907009","municipality":"Looc","province":"Romblon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p04-y505:ib:p901:r12","title":"Daet-Talisay RIS: Repair/Improvement of Canal Lining at Sta. 3+115.50 - 4+216.80 SMC","psgc":"0501603000","municipality":"Daet ","province":"Camarines Norte","program":"National Irrigation System Sub-Program","nimpMatches":[{"plan":"NIMP","region":"NATIONAL","file":"NATIONAL IRRIGATION MASTER PLAN (NIMP)/NIMP Abridged_per page.pdf","score":1.0,"matchedTerms":["daet","talisay"]}],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["daet","talisay"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/CY 2027 POW-DAET-TALISAY RIS- 5.2M.pdf","matchedTerms":["daet","talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["daet","talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/PHOTOS-DTRIS-SERVICE ROADSNIS-5.2M.pdf","matchedTerms":["daet","talisay"]}]},{"id":"pair:nep-nia-p13-y346:ib:p914:r21","title":"Bag-ong Kahayag CIS: Repair of Canal Lining at Main Canal Sta. 0+000-0+120","psgc":"0907333002","municipality":"Lakewood","province":"Zamboanga del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p14-y173:ib:p915:r20","title":"Bolodbolod CIS: Repair of Canal Structure and Canal","psgc":"0806412004","municipality":"Saint Bernard","province":"Southern Leyte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y640:ib:p939:r15","title":"Matnog-Alcala SIP: Construction of Canal Structures and Canalization Works at Main Canal (0+000 - 0+150)","psgc":"0500503001","municipality":"Daraga","province":"Albay","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p939:r14","title":"Matnog-Alcala SIP: Construction of Canal Structures and Canalization Works at Main Canal (0+150.00 - 0+300.00)","psgc":"0500503001","municipality":"Daraga","province":"Albay","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p29-y606:ib:p939:r13","title":"San Fernando-San Andres SIP: Construction of Canal Structures and Canalization Works at Main Canal (0+000 - 0+150)","psgc":"0000000000","municipality":"","province":"","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y173:ib:p897:r11","title":"San Francisco RIS: Concreting of Service Roads (Sta. 3+266.00 - 3+332.00 of Main Canal)","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PHOTOS-SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PROJECT LAYOUT- SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/SERVICEROADNIS-SAN FRANCISCO RIS-1.25M.pdf","matchedTerms":["francisco","san"]}]},{"id":"house_only:ib:p897:r10","title":"San Ramon RIS: Concreting of NIS Service Roads (Sta. 1264.11 -1+334.2 of Main Canal)","psgc":"0506203000","municipality":"Bulan","province":"Sorsogon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p02-y763:ib:p898:r12","title":"Marbel 1 RIS: Improvement of Service Roads along Lateral I (Road Surfacing)","psgc":"1206315000","municipality":"Tantangan","province":"South Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p10-y295:ib:p909:r8","title":"Dumanisi CIS: Construction of Concrete Road (Station 0+000.00 - Station 0+170.00)","psgc":"0205703012","municipality":"Diffun","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"pair:nep-nia-p13-y172:ib:p914:r11","title":"Elicia CIS: Repair of Main Canal (Sta. 0+120 - 0+220)","psgc":"1804613029","municipality":"La Libertad","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p15-y255:ib:p917:r14","title":"PAWIC CIS: Restoration of Canal Lining at 0+713.50 - 0+723.00 of Lateral A, and Sta. 1+121.00 - 1+242.70 of Lateral A","psgc":"0506211026","municipality":"Magallanes","province":"Sorsogon","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y122:ib:p914:r9","title":"Cambaguio CIS: Replacement of Damage Pipes & Desilting of Dam","psgc":"1804604008","municipality":"City of Bais","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p939:r19","title":"Cangabo SIP: Construction of Canal & Canal Structures (For Completion) (Sta. 1+035 - 1+152)","psgc":"1804613006","municipality":"La Libertad","province":"Negros Oriental","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"house_only:ib:p902:r10","title":"Dauin SRIS: Repair of Lined Canal with Cover (Sta. 0+050 - 0+072)","psgc":"1804609000","municipality":"Dauin","province":"Negros Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"pair:nep-nia-p13-y102:ib:p914:r8","title":"Calasgaan CIS: Repair of Intake","psgc":"1804604006","municipality":"City of Bais","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y658","title":"AGUSAN SUR MAGKASAMA SPIP; Establishment of Solar Pump Irrigation Project with Al Monitoring","psgc":"1600306030","municipality":"Prosperidad ","province":"Agusan del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/EGPIP-SOLAR GURUNG-GURO SPIP 10M/POW GURUNG-GURO SPIP 10M.pdf","matchedTerms":["solar","spip"]}]},{"id":"nep_only:nep-nia-p28-y214","title":"ALEGRIA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y501","title":"ANGAT-BUSTOS-PANDI (ANBUSPA) PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and","psgc":"0301406014","municipality":"Bustos","province":"Bulacan","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y640","title":"AUPAGAN PUMPING STATION: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"1630400082","municipality":"City of Butuan","province":"Agusan del Norte","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y708","title":"AZPETIA SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"1600306003","municipality":"Prosperidad ","province":"Agusan del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p06-y234","title":"Abra River Irrigation System: Restoration of Canal Lining along the supplemental Source of Upper Primary Canal and Construction of Appurtenant structures. Replacement of Delapidated Steel Gates","psgc":"1400124000","municipality":"Tayum","province":"Abra","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p09-y182","title":"Addalam River Irrigation System (ADRIS): Establishment of SMS Telemetered Rainfall/River Gauges and Sensors/Monitoring Equipment/Subscription, Supply and Installation of CCTV, IP","psgc":"0205701000","municipality":"Aglipay","province":"Quirino","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"nep_only:nep-nia-p05-y113","title":"Aklan RIS: Rehabilitation of Akan RIS - West Side","psgc":"0600413000","municipality":"Malinao","province":"Aklan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p26-y703","title":"Alegria SPIP; Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/EGPIP-SOLAR GURUNG-GURO SPIP 10M/POW GURUNG-GURO SPIP 10M.pdf","matchedTerms":["solar","spip"]}]},{"id":"nep_only:nep-nia-p25-y163","title":"Araywan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705317002","municipality":"Quezon","province":"Palawan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y749","title":"BAYUGAN ORGANIC SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"1600301000","municipality":"City of Bayugan","province":"Agusan del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y673","title":"BIT-0OS PUMPING STATION: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"1630400022","municipality":"City of Butuan ","province":"Agusan del Norte","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p29-y193","title":"BITOON SPIP: Establishment of Solar Pump Irrigation Project with Al Monitoring","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p15-y286","title":"Bacalan -Alegre CIS: Restoration of Damaged Benchflume, Submerged Intake & wasteway, Silted Siphon & Bench Flume","psgc":"0600615005","municipality":"Sebaste","province":"Antique","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p13-y654","title":"Baclinan CIS: Rehabilitation of approximately 100 linear meters of the main canal and construction of a protection dike along the main canal.","psgc":"1102503000","municipality":"Boston","province":"Davao Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p07-y353","title":"Baco-Bucayao RIS: Proposed concreting of earth canal (Sta. 3+753 - 44540) Lateral B2a & Proposed concreting of earth canal (0+980 - 1+633) Lateral C3","psgc":"1705208000","municipality":"Naujan","province":"Oriental Mindoro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 6_FSDE-MASTERPLAN_JULY-25-2024.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 10 Maintenance-Plan-Actual.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 12.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 2.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 23-27.xlsx","score":1.0,"matchedTerms":["baco","bucayao"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p08-y557","title":"Baggao Irrigation System: Improvement of Pared Intake Structure and Gates","psgc":"0201506000","municipality":"Baggao","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y194","title":"Bago RIS: Rehab/Improvement of Bench Flume and Drainage Canal","psgc":"1804502000","municipality":"City of Bago","province":"Negros Occidental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p30-y318","title":"Baguic-ican SIP: Construction of Irrigation Facilities","psgc":"1001316000","municipality":"Pangantucan","province":"Bukidnon","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 3 - ASSESSMENT OF PROGRAMMED PROJECTS (2023-2030).pdf","score":1.0,"matchedTerms":["baguic","ican","sip"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p22-y111","title":"Bakod Bayan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304903007","municipality":"City of Cabanatuan","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p22-y499","title":"Bakod Bayan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304903007","municipality":"City of Cabanatuan","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p19-y143","title":"Balaweg-Mapisi CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0102913000","municipality":"Nagbukel","province":"Ilocos Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p06-y697","title":"Baligatan DD: Restoration of Area thru Improvement of Irrigation Fadility (Construction of Concrete Canal Lining at Lateral 9 Sta 3+391-3+724 L=333m)","psgc":"0203124000","municipality":"Ramon","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p01-y226","title":"Banaoang PIS: Concreting of Access Road at Lateral B Sta. 0+200 - 0+300","psgc":"0102903022","municipality":"Bantay","province":"Ilocos Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p06-y368","title":"Banaoang PIS: Repair of Canal Lining at Lateral G Sta, 2+892 - Sta. 3+160 and Various Canal Structures along Main Canal and Lateral G","psgc":"0102903022","municipality":"Bantay","province":"Ilocos Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y350","title":"Banaoang PIS: Repair of Canal Lining at Lateral I Sta. 5+156.50 - Sta. 5+683.00","psgc":"0102903022","municipality":"Bantay","province":"Ilocos Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p23-y529","title":"Bantog SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/UPRIIS/SPIP/SPIP-PENRIS BANTOG 2-10M.PDF","matchedTerms":["bantog","spip"]}]},{"id":"nep_only:nep-nia-p30-y339","title":"Bantol PIP: Provision of one (1) unit 10 hp Solar Powered Pump irrigation Systems & HDPE appurtenant irrigation facilities to efficiently irrigate approximately 10 hectares of service area","psgc":"1130700177","municipality":"City of Davao","province":"Davao del Sur","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y696","title":"Barit RIS: Repair/rehabilitation of canal embankment at Sta. 0+048.20 - 0+117.25, Repair of steel gates and intake gates #2, #3, and #4, and Installation of sluice gate's lifting cable","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p25-y733","title":"Barusbus CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0600610001","municipality":"Libertad","province":"Antique","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p29-y365","title":"Basco SIP: Construction of 1 Unit Rain Collector, HDPE Pipe Lining, Painting Works and Water Proofing (Phase 2)","psgc":"0000000000","municipality":"","province":"","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p12-y428","title":"Basud Magurang (HRISIA) CIS: Repair/Rehabilitation of Right Main Canal (Sta. 0+514 - 1+323), Lateral A of Right Main Canal (Sta. 0+200 - 0+260) and Left Main Canal (Sta. 0+146 - 04-350)","psgc":"0500514031","municipality":"Polangui","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["basud","hrisia","magurang"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["polangui"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/PHOTOS-Cabangan-CIS-Polangui.pdf","matchedTerms":["polangui"]}]},{"id":"nep_only:nep-nia-p02-y499","title":"Batutu RIS: Concreting of Service roads along MC East Sta. 0+749.2 to Sta. 0+849.2 (Cogonon) to provide easy access for the delivery of Agricultural product","psgc":"1108210004","municipality":"New Bataan","province":"Davao de Oro","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p08-y122","title":"Bayawan NIS: Repair of Main Canal (Sta. 1+350 - 14780), Lateral A (Sta. 0+000 - 14700), Lateral C (Sta. 0+000 - 2+130), Lateral B (Sta. 0+000 - 1+060) and Construction of Protection Works at","psgc":"1804606000","municipality":"City of Bayawan","province":"Negros Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p11-y322","title":"Baybayabas CIS: Repair of Diversion Dam and Appurtenant Structures","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p27-y143","title":"Bitoon SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p07-y741","title":"Bohol Integrated Irrigation System (Bayongan IS): Improvement of Concrete Canal Lining BMC-9 (0+685~0+985) to restore non-operational area of 2 hectares.","psgc":"0701238001","municipality":"San Miguel","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p07-y710","title":"Bohol Integrated Irrigation System (Bayongan IS): Improvement of Concrete Canal Lining H-1 (0+000~0+728) to restore non-operational area of 3 hectares.","psgc":"0701238001","municipality":"San Miguel","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p02-y255","title":"Bohol Integrated Irrigation System (Bayongan IS): Repair and Improvements of Service Road with a length of 200 meters along main canal (0+400~+870)","psgc":"0701238001","municipality":"San Miguel","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y277","title":"Bohol Integrated Irrigation System (Malinao IS): Repair/Construction MFD Lining MC-25A (0+000- 0+100) MC-26A (0+000-0+200) MC-27A1 (0+000-0+200) MC-22G (0+078-0+278) MC-22B (0+280-","psgc":"0701234017","municipality":"Pilar","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y236","title":"Bohol Integrated Irrigation System (Malinao IS): Repair/Construction of I-1 (0+500-0+650), Main Canal (23+850~24+060), Main Canal (24+500~24+600), MC-29-3 (0+000~0+500), MC-29B","psgc":"0701234017","municipality":"Pilar","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p02-y743","title":"Buayan RIS: Improvement of Service Roads along Main Canal from Tinagacan Diversion Structure","psgc":"1230800028","municipality":"City of General Santos","province":"South Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["general"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["general"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/RESTOCIS-TINDOG CIS-10M/TINDOG CIS GENERAL LAYOUT.jpg","matchedTerms":["general"]}]},{"id":"nep_only:nep-nia-p13-y142","title":"Budlasan CIS: Repair of Right Main Canal (Sta. 1+250 - 1+380, Sta. 1+520 - 1+670, Sta. 14-800 - 1+930)","psgc":"1804611000","municipality":"City of Guihulngan","province":"Negros Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p29-y82","title":"Buenasuerte Gibong SPIP: Establishment of Solar-Powered Pump Irrigation Project with AL Monitoring System","psgc":"1600308026","municipality":"San Francisco","province":"Agusan del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PHOTOS-SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PROJECT LAYOUT- SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/SERVICEROADNIS-SAN FRANCISCO RIS-1.25M.pdf","matchedTerms":["francisco","san"]}]},{"id":"nep_only:nep-nia-p16-y81","title":"Buguis CIS: Rehabilitation of approximately 1,000 linear meters of canal, rehabilitation of canal structures, and construction of upstream protection works along the right bank of the diversion dam","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p12-y491","title":"Buhay na Kudos CIS: Repair/Rehabllitation of Diversion Works (Falling Shutter Dam at Sta. 0+000), Slope Protection works at Upstream, Left and Right Side of Dam, and Canalization Works at Lateral A","psgc":"0500514000","municipality":"Polangui","province":"Albay","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["buhay","kudos"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_4. Detailed Damage_Losses_Recovery and Reconstruction Needs Agriculture and Fisheries Subsector.xlsx","score":1.0,"matchedTerms":["buhay","kudos"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["polangui"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/PHOTOS-Cabangan-CIS-Polangui.pdf","matchedTerms":["polangui"]}]},{"id":"nep_only:nep-nia-p03-y84","title":"Cabadbaran-Taguibo RIS: Concreting of Service Roads at Taguibo MC (Sta. 0+000-0+145)","psgc":"1630400083","municipality":"City of Butuan","province":"Agusan del Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y113","title":"Cabasagan CIS: Rehabilitation of approximately 70 linear meters of canal and construction of downstream protection works along the right bank of the diversion dam adjacent","psgc":"1003509005","municipality":"Lala","province":"Lanao del Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p13-y612","title":"Cabuyawan CIS: Rehabilitation of the canal and installation of a concrete canal cover from Sta. 0+000.00 to Sta. 0+200.00; remove and replace of the 2 canal structures; and construction of","psgc":"1102501000","municipality":"Baganga","province":"Davao Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p30-y576","title":"Cagaycay RIS: Construction of Palale Checkgate (Sta. 0+000.00), Main Canal (Sta. 0+000.00 - 1+000.00), and other appurtenant structures;","psgc":"0501733016","municipality":"San Jose","province":"Camarines Sur","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p10-y642","title":"Cagyo SIS: Repair and Improvements of Service Roads from Sta. 0+000 to Sta. 0+460 leading to Danicop-Cahayag-Matin-ao Barangay Road","psgc":"0701240000","municipality":"Sierra Bullones","province":"Bohol","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p19-y408","title":"Camencita SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p29-y740","title":"Cangabo SIP: Construction of Canal & Canal Structures (For Completion) (Sta. 14035 - 1+152)","psgc":"1804613006","municipality":"La Libertad","province":"Negros Oriental","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p08-y394","title":"Cateel IIS: Rehabilitation of approximately 1,000 linear meters of the Right Main Canal, including the remove and replace of 7 canal structures","psgc":"1102505000","municipality":"Cateel","province":"Davao Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 3_Irene_09222023 - Irene Separa.xlsx","score":1.0,"matchedTerms":["cateel","iis"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 6_Irene_09222023 - Irene Separa.xlsx","score":1.0,"matchedTerms":["cateel","iis"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex-5_Irene_01302024_basis-for-June-13-2024-presentation_FINAL-DATA.xlsx","score":1.0,"matchedTerms":["cateel","iis"]},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 7_Irene_edited.xlsx","score":1.0,"matchedTerms":["cateel","iis"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p27-y245","title":"Cerdefia SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0702229005","municipality":"Malabuyoc","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y259","title":"Construction of concrete canal lining at lateral B-7, SDA, and improvement of drainage waterway at Brgy. 1 & Pulong Bahay: Construction of concrete canal lining at lateral B-7, SDA, and improvement","psgc":"0304922012","municipality":"Quezon","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p11-y199","title":"Coog CIS: Repair of Diversion structure of Main Pipeline 01; Concreting of the canal lining, Installation of HDPE Pipeline, construction of canal structures & terminal facilities","psgc":"1401106006","municipality":"Itogon","province":"Benguet","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p11-y425","title":"Dabobo CIS: Repair of Canal Lining along Lateral A at Station 04000 - 0+525.00 ; Repair of Canal Structures along Main Canal at Station 0+000.00 (Intake), along Lateral A at Station 0+160.00","psgc":"0205704000","municipality":"Maddela","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"nep_only:nep-nia-p09-y81","title":"Dabubu River Irrigation System: Supply, Delivery and Installation of Telemetry and Automatic Weather Station and Construction of Slope Protection","psgc":"0203127000","municipality":"San Agustin","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y475","title":"Daet-Talisay RIS: Repair/Improvement of canal lining at Sta. 0+000-0+514.20,Lat. A-1b; installation of diesel engine pump at Tail end of Lateral Al and Lateral Alc","psgc":"0501603000","municipality":"Daet ","province":"Camarines Norte","program":"National Irrigation System Sub-Program","nimpMatches":[{"plan":"NIMP","region":"NATIONAL","file":"NATIONAL IRRIGATION MASTER PLAN (NIMP)/NIMP Abridged_per page.pdf","score":1.0,"matchedTerms":["daet","talisay"]}],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["daet","talisay"]}],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/CY 2027 POW-DAET-TALISAY RIS- 5.2M.pdf","matchedTerms":["daet","talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["daet","talisay"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/PHOTOS-DTRIS-SERVICE ROADSNIS-5.2M.pdf","matchedTerms":["daet","talisay"]}]},{"id":"nep_only:nep-nia-p09-y441","title":"Dapat CIS: Improvement of Slope Protection at Diversion Dam","psgc":"1400123003","municipality":"San Quintin","province":"Abra","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y409","title":"Dauin SRIS: Repair of Lined Canal with Cover (Sta. 0+050 - 04072)","psgc":"1804609000","municipality":"Dauin","province":"Negros Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p08-y600","title":"Dummun River Irrigation System: Dam Retrofitting and Strengthening, Improvement of Intake Structure and Gates","psgc":"0201513025","municipality":"Gattaran","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p12-y626","title":"Eguirendon CIS: Repair of Damage Benchflume and collapsed Closed Conduit","psgc":"0000000000","municipality":"","province":"","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p25-y753","title":"Flores SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y468","title":"GATIAWIN PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"0305403008","municipality":"Arayat","province":"Pampanga","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y688","title":"GUADALUPE SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p15-y419","title":"Gabayan CIS: IMPROVEMENT/INSTALLATION OF PIPELINE Pipeline (Main Pipe from Reservoir #1 to Reservoir #2 @ Sta. 0+000 to Sta. 0+200, Lateral 1 @","psgc":"0701211000","municipality":"Candijay","province":"Bohol","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p23-y498","title":"Galas Malayantoc SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304929019","municipality":"Santo Domingo","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p30-y102","title":"Habangan-Lower Cang-apa SIP: CONSTRUCTION OF DIVERSION WORKS, CANAL STRUCTURES AND CONCRETE CANAL LINING","psgc":"1806102010","municipality":"Larena","province":"Siquijor","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p09-y533","title":"Hamtic CIS: Retrofitting of Dam","psgc":"0600608000","municipality":"Hamtic","province":"Antique","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y248","title":"Hapid Irrigation System: Repair/Rehabilitation of Canal Canal Lining","psgc":"1402705004","municipality":"Lamut","province":"Ifugao","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y514","title":"Hindang-Hilongos IS: Repalr/Improvement of Diversion Works (Slope Protection Uptream)","psgc":"0803719000","municipality":"Hilongos","province":"Leyte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/ANNEX 5 (2.7.25).xlsx","score":1.0,"matchedTerms":["hilongos","hindang"]},{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/EASTERN VISAYAS-RIMP-2023-2030 (1).pdf","score":1.0,"matchedTerms":["hilongos","hindang"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y362","title":"IGUIG-AMULUNG PUMPING IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical","psgc":"0201504000","municipality":"Amulung","province":"Cagayan","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p12-y646","title":"Igbarawan CIS: Repair of Collapsed Benchflume, Exposed Column footing @ Inlet","psgc":"0600612011","municipality":"Patnongon","province":"Antique","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 6/REPAIR CIS - IGBARAWAN CIS - 4.3M/POW CY2027-IGBARAWAN CIS 4-3M-Copy.pdf","matchedTerms":["igbarawan"]}]},{"id":"nep_only:nep-nia-p07-y771","title":"Ilaya SRIS: Improvement of Impounding Dam","psgc":"0701246000","municipality":"Ubay","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/ANNEX 6-4. 10 YEAR IDP (FSDE).xlsx","score":1.0,"matchedTerms":["ilaya","sris"]},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/Annex 2 NIS System Data Sheet..xlsx","score":1.0,"matchedTerms":["ilaya","sris"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p26-y520","title":"Kampoot SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0702252026","municipality":"Tuburan","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p30-y369","title":"Kapliko Creek - North Lamidan CIP: Construction of Diversion Dam and its appurtenances","psgc":"1108601003","municipality":"Don Marcelino","province":"Davao Occidental","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y769","title":"LATERAL J-SIMULAO SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"1600302000","municipality":"Bunawan","province":"Agusan del Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 11/3. Service Road CIS/Bunawan Kipalili CIS_2M/BUNAWAN KIPALILI CIS_2M_service road CIS_POW.pdf","matchedTerms":["bunawan"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 11/3. Service Road CIS/Bunawan Kipalili CIS_2M/Bunawan Kipalili CIS_service road cis_photo.jpg","matchedTerms":["bunawan"]}]},{"id":"nep_only:nep-nia-p16-y608","title":"LIBMANAN PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"0501718000","municipality":"Libmanan","province":"Camarines Sur","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["libmanan","pump"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y234","title":"LUPON BANAYBANAY SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"1102507000","municipality":"Lupon","province":"Davao Oriental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y556","title":"Labangan RIS: Installation of Interlocking Concrete Blocks (I-Blocks) Downstream of Bokong Dam and Construction of Slope Protection along the Left Bank, Upstream and Downstream portion of","psgc":"0907312006","municipality":"Labangan","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 9/1. REPAIRNIS-LABRIS-200M/LABANGAN-REPAIR NIS.jpg","matchedTerms":["labangan"]}]},{"id":"nep_only:nep-nia-p25-y213","title":"Labog SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"1705324004","municipality":"Sofronio Española","province":"Palawan","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p08-y515","title":"Lambayong: 1. Construction of 1 km canal lining at Pasamic (Sta. 4+691 - 5+691) 2. Supply and Installation of Pasamic 3 - Units Sluice Gates","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p14-y82","title":"Lambusong CIS: Lateral A - Gardose area - 1,210 meters (remove and Replace) & continuation of canal lining 400 meters (drainage), Flume - Lateral B - 500 meters (removed and replace), Terruvian","psgc":"1206311000","municipality":"Norala","province":"South Cotabato","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 12/REPAIRCIS-LAMBUSONGCIS-5.5M/LAMBUSONG CIS - ANNEX B.pdf","matchedTerms":["lambusong"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 12/REPAIRCIS-LAMBUSONGCIS-5.5M/LAMBUSONG CIS PHOTO.pdf","matchedTerms":["lambusong"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 12/REPAIRCIS-LAMBUSONGCIS-5.5M/Lambusong CIS CY 2027.pdf","matchedTerms":["lambusong"]}]},{"id":"nep_only:nep-nia-p16-y153","title":"Lamkot CIS: Continuation of canal lining of right main canal, 130 meters canal cover of right mina canal, desilting/repair of diversion dam, remove and replace of structure of right","psgc":"1206302000","municipality":"Banga","province":"South Cotabato","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p10-y458","title":"Laur CIS: Construction of service road along Brgy. San Juan (Sta. 0+000 - Sta. 0+800)","psgc":"0304913020","municipality":"Laur","province":"Nueva Ecija","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y568","title":"Libmanan-Cabusao PIS: Repair/Rehabilitation of Trapezoidal Canal Embankment (Main Canal Sta. 0+000.00 - 0+720.00, Sta. 0+542.00 - 0+562.00, 4+471.00 - 4+862.00, 5+000.00-5+200.00),","psgc":"0501718000","municipality":"Libmanan","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_3. DPWH Convergence Program to NIA FY 2025.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 7_1. Identfied Areas and Systems for NIA Contract Farming.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["cabusao","libmanan"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y527","title":"Libmanan-Cabusao PIS: Repair/Rehabilitation of Trapezoidal Canal Left and Right Embankment (Main Canal Sta. 7+642-8+300), Headgates (MC-1 Sta. 8+593.00, MC-2 Sta, 9+393.00, and F1-1","psgc":"0501718000","municipality":"Libmanan","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_3. DPWH Convergence Program to NIA FY 2025.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 7_1. Identfied Areas and Systems for NIA Contract Farming.xlsx","score":1.0,"matchedTerms":["cabusao","libmanan"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["cabusao","libmanan"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p09-y554","title":"Lombuyan CIS: Retrofitting of Dam","psgc":"0600602025","municipality":"Barbaza","province":"Antique","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p10-y213","title":"Lower Nagbitin CIS: Construction of Concrete Road (Station 0+000.00 - Station 0400.00)","psgc":"0205014004","municipality":"Villaverde","province":"Nueva Vizcaya","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p07-y442","title":"Lower-Lalo RIS: Restoration of 5 Intake Gates and Forebay Intake Structure fence and concrete slab, RALCC A-3 Extension (Sta. 0+234 -0+650), Replacement of Road crossing at RALCCA-3 (Sta.","psgc":"0501723000","municipality":"Nabua","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p07-y517","title":"Lower-Lalo RIS: Restoration of Canal Lining at RAMC 16 (Sta. 0+018.5-0+586.5, RAMC 16 A 0+067- 0+308, RAMC 17 0+150-0+506, RAMC 17A 14-853.5-2+120, RAMC 14-1 0+000-0+109.5, RAMC 15-","psgc":"0501723000","municipality":"Nabua","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p07-y484","title":"Lower-Lalo RIS: Restoration of Main Canal (5+982.80-6+022.80, 9+595.60-9+780.60) and Repair Canal Lining (RAMC 16 Sta. 0-+018.5-0+100.00)","psgc":"0501723000","municipality":"Nabua","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p14-y359","title":"Lungog CIS: Repair of Diversion Dam and Appurtenant Structures","psgc":"0102914016","municipality":"Narvacan","province":"Ilocos Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p02-y479","title":"Lupon IS: Concreting of 0.10 kilometers service road along Lateral C to improve accessibility.","psgc":"1102507000","municipality":"Lupon","province":"Davao Oriental","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y104","title":"MAP IS: Concreting of Service Roads at Main Canal (Sta. 9+221- 94295)","psgc":"1600207000","municipality":"Las Nieves","province":"Agusan del Norte","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y436","title":"MARIIS PUMPING STATION NO. 1: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"0203102000","municipality":"Angadanan","province":"Isabela","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p09-y595","title":"MBCIIS (Binalawan): Repair of Steelgates, dam mechanization and endosure of dam mechanization area","psgc":"1804513002","municipality":"Ilog","province":"Negros Occidental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y597","title":"MINDUPOK SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"1208005009","municipality":"Maitum","province":"Sarangani","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y317","title":"Mabini SRIS: Repair of Canal MC 5A, MC 5A Gap, MC 9-2 Canal Cover, Lateral D, Lateral D Cover, Lateral D-1, Lateral D-2, Lateral E, Lateral E-1, MC 13A, Lateral F, Lateral F Canal Cover, Lateral A,","psgc":"0701231000","municipality":"Mabini","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p26-y418","title":"Mabini-Cayacay SRIP Cabidian Area SPIP: Establishment of Solar Pump Irrigation Project with AL Monitoring","psgc":"0701231007","municipality":"Mabini","province":"Bohol","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p26-y448","title":"Mabini-Cayacay SRIP Cayacay Area SPIP: Establishment of Solar Pump Irrigation Project with Al Monitoring","psgc":"0701202004","municipality":"Alicia","province":"Bohol","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y747","title":"Magat RIS: Furnish and installation of type II U-shaped sheet plle through rehabilitation of scoured embankment along approach channel of PS No. 1 Left and Right Side","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p30-y494","title":"Magat-RIS: Construction of Canal Extension and Appurtenant Structures at RM3 Extension (620 meters), including the Provision and Installation of 1 Unit Modernized Submersible","psgc":"0000000000","municipality":"","province":"","program":"Extension/Expansion of Existing Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y708","title":"Malasila RIS: Construction of Protection works at New Barbaza downstream 35 meters","psgc":"1204710021","municipality":"M'Lang","province":"Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p15-y553","title":"Malibago-Esperanza CIS: Repair/Improvement of Diversion Works","psgc":"0806402000","municipality":"Bontoc","province":"Southern Leyte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y145","title":"Malinao Dam Improvement Project: Modification of Dam and Spillway and Irrigation Facilities","psgc":"0701234017","municipality":"Pilar","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/ANNEX 6-2. 10- Year Irrigation Development Program.xlsx","score":1.0,"matchedTerms":["dam","malinao"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p26-y398","title":"Malinao IS Katipunan Area SPIP: Establishment of Solar Pump Irrigation Project with Al Monitoring","psgc":"0701202006","municipality":"Alicia","province":"Bohol","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p25-y193","title":"Malis SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y634","title":"Mallig River Irrigation System: Construction of Structured Wall Pipe at Station at Station 1+970.55- 2+000.5 along Main Canal","psgc":"0203119000","municipality":"Mallig","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p11-y166","title":"Manorigao 1 CIS: Concreting of .13 kilometers Service Road from Sta. 0+000.00 to Sta. 0+130.00 along Lateral B.","psgc":"1102504006","municipality":"Caraga","province":"Davao Oriental","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p29-y395","title":"Mapalyao SIP: Phase 2: Construction of Supplemental Diversion Works, Canalization work (Sta 4+298 - Sta 6+110 MC & Lateral canals), Canal Structures, Cable Pipelines and Proc. & Instal. Of","psgc":"0205011000","municipality":"Quezon","province":"Nueva Vizcaya","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p26-y82","title":"Maradiona SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0600603006","municipality":"Belison","province":"Antique","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p08-y424","title":"Maridagao RIS: 1. Concreting of Canal along lateral E 0+000 - 0+700 (UMSA at DALFIA) 2. DESILTING AT LATERAL DRAINAGE FROM PULANGI RIVER TO LATERAL Al","psgc":"1204712000","municipality":"Pikit","province":"Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y432","title":"Masalip RIS: Canal Lining @ Sta. 3+070.00 - 3+150.00, Sta. 3+829.00 - 3+925.50, Sta. 3+968.40 4+031.40, Sta. 4+061.50 - 4+126.50, Sta. 4+602.30 - 4+617.60, Lat. A-Extra and Repair of Road","psgc":"0103320000","municipality":"Tubao","province":"La Union","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/(Service-Road) MASALIP RIS.pdf","matchedTerms":["masalip"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/299c02e2-6629-41d2-9fa1-2085887bb504.jpg","matchedTerms":["masalip"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 1/SERVICEROADSNIA-MASALIP RIS-2M/ca05457f-18a1-4b44-99af-2090d72ef4da.jpg","matchedTerms":["masalip"]}]},{"id":"nep_only:nep-nia-p09-y255","title":"Masipi West CIS: Replacement of Trash Rack at Intake Sta. 0+000; Propose Steel Gate at Intake Sta. 04000, and at Inlet of Combined Thresher Crossing and Headgate","psgc":"0203106026","municipality":"Cabagan","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p07-y402","title":"Matogdon RIS: Restoration of Lateral A (Sta 1+005-1+117); Improvement/Rehabilitation of canal structure and canalization works at Sta. 0+005-0+390, 1+888-1+998.50 Lat. C, Sta. 1+420-","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p24-y355","title":"Maybancal SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0405809004","municipality":"Morong","province":"Rizal","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y402","title":"NASSIPING PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"0201513038","municipality":"Gattaran","province":"Cagayan","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/Annexes_rev06.pdf","score":1.0,"matchedTerms":["nassiping","pump"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p09-y142","title":"NVBIS: Improvement of Diversion Dam","psgc":"0205003000","municipality":"Bagabag","province":"Nueva Vizcaya","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p27-y734","title":"Nabag-oc SPIP: Establishment of Solar Pump Irrigation Project with Al Monitoring","psgc":"1001321022","municipality":"City of Valencia","province":"Bukidnon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p09-y665","title":"Nakidol Creek-Poblacion CIS: Concreting of the 0.410 KM service road and protection structure from the Poblacion Provincial Road leading to the diversion structure of the Nakidol Creek Poblacion CIS","psgc":"1401105013","municipality":"Buguias","province":"Benguet","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p19-y112","title":"Narvacan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0102914000","municipality":"Narvacan","province":"Ilocos Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p13-y530","title":"Nuevo lIioco CIS: Repair of Damaged Elevated Flume along Main Canal of Hijo Dam from Station 1+450 to 1+556","psgc":"1108206006","municipality":"Mawab","province":"Davao de Oro","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y729","title":"ODMAS SPIP; Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 3/EGPIP-SOLAR GURUNG-GURO SPIP 10M/POW GURUNG-GURO SPIP 10M.pdf","matchedTerms":["solar","spip"]}]},{"id":"nep_only:nep-nia-p30-y82","title":"Owacan-Pacuan SIP: Construction Canal & Canal Structures (Sta. 0+440 - 1+190)","psgc":"1804612000","municipality":"Jimalalud","province":"Negros Oriental","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p15-y224","title":"PANDAN SWIS: Restoration of Canal Structures along Sta 24939.00 - 2+977.50 of MC, Sta 3+734.20-3+794.50 of MC, and Sta 0+219.60 - 0+231.00 of MC","psgc":"0600611000","municipality":"Pandan","province":"Antique","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p23-y580","title":"PBRIS EXTN SPIP 1V: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0304932000","municipality":"Zaragoza","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p23-y224","title":"PRIS SPIP II: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p01-y584","title":"PRIS-SDC: IMPROVEMENT OF IRRIGATION CANAL ROADWAYS (Science City of Mufioz AREA) PCCP LATERAL E STA.5+870-6+040","psgc":"0304917000","municipality":"Science City of Muñoz","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["pris","sdc"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p01-y664","title":"Palico RIS: Construction of Concrete Pavement","psgc":"0401019000","municipality":"Nasugbu","province":"Batangas","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p01-y553","title":"Pamaldan Cinco Cinco Irrigation System: Construction of PCCP @DC-2, Sta. 17+178.00 - Sta. 17+428.00 (SAMON)","psgc":"0304903000","municipality":"City of Cabanatuan","province":"Nueva Ecija","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/FINAL REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["cinco","pamaldan"]},{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","score":1.0,"matchedTerms":["cinco","pamaldan"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p01-y532","title":"Pampanga River IS: Construction of PCCP at PRIS C, Sta. 14+693.00 - 14+883.00","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y574","title":"Pasa SRIS: Repair of Canal Lining at Sta. 2+246-2+280 and 2+930-2+960 along lateral A Sta. 0+107 - 04-529 along Lateral D","psgc":"0203114070","municipality":"City of Ilagan","province":"Isabela","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y597","title":"Pulangui RIS: Sedimentation Control and irrigation project","psgc":"1001310001","municipality":"Lantapan","province":"Bukidnon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p24-y386","title":"Pulong Munti, San Pedro SPIP: Establishment of Solar-Powered Pump Irrigation Project with Al Monitoring System","psgc":"0304925008","municipality":"San Isidro","province":"Nueva Ecija","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y302","title":"Quipot IS: Construction of Canal Lining, Canal Structures and Other Irrigation Facilities","psgc":"0405608000","municipality":"Candelaria","province":"Quezon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p21-y444","title":"RMS: Conversion to Solar-Powered with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p29-y556","title":"Ransang SIP: Construction of Canal Lining and Canal Structures at Sta. 0+000.00-0+600.00, Main Canal","psgc":"1705323010","municipality":"Dr. Jose P. Rizal","province":"Palawan","program":"Special Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p08-y320","title":"Rugnan RIS: Construction of Lateral G-1 @ Sta. 0+000-1+200 and its Apurtenant Structures","psgc":"1903634000","municipality":"Maguing","province":"Lanao del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y81","title":"SAN FRANCISCO RIS: Repair of Canal Lining along Sta 0+522.70-1+720.00, Canal Structure along Sta 0+4377.50, 0+52270, 1+900.00 of Main Canal, Sta 0+000 - 0+400.00 of Sublateral A","psgc":"0000000000","municipality":"","province":"","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PHOTOS-SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/PROJECT LAYOUT- SAN FRANCISCO RIS.pdf","matchedTerms":["francisco","san"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-SAN FRANCISCO RIS- 1.25M/SERVICEROADNIS-SAN FRANCISCO RIS-1.25M.pdf","matchedTerms":["francisco","san"]}]},{"id":"nep_only:nep-nia-p02-y153","title":"SAN RAMON RIS: Concreting of NIS Service Roads (Sta 1264.11 -1+334.,20 of Main Canal)","psgc":"0506203000","municipality":"Bulan","province":"Sorsogon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y728","title":"SAN RAMON RIS: Repair of Canal Structures along Sta 6+204.90 - 6+207.90 , Sta 2+408.16 CL of Main Canal, Concreting of Sublateral Canals 0+000.00-0+300 including electrification for Diversion's","psgc":"0506203000","municipality":"Bulan","province":"Sorsogon","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y330","title":"SOLANA PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"0201527019","municipality":"Solana","province":"Cagayan","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p16-y706","title":"STA. JOSEFA PUMP IRRIGATION SYSTEM: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"1600310005","municipality":"Santa Josefa","province":"Agusan del Sur","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p14-y705","title":"Salang Matanda CIS: Construction of Concrete Canal Lining","psgc":"0405802000","municipality":"City of Antipolo ","province":"Rizal","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/RESTOCIS-SALANG MATANDA CIS-5M.pdf","matchedTerms":["matanda","salang"]}]},{"id":"nep_only:nep-nia-p08-y227","title":"Salug RIS: Construction of a 50-meter protection dike along Salug Diut River for the protection of","psgc":"0907328000","municipality":"Tambulig","province":"Zamboanga del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p09-y502","title":"San Jose CIS: Construction of Slope Protection at upstream Right Side Portion and Slope Protection at Down Stream of San Jose CIS Dam","psgc":"0600406000","municipality":"Ibajay","province":"Aklan","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.E. Irrigation Systems Maintenance Plan_Sibalom San Jose IS.pdf","score":1.0,"matchedTerms":["jose","san"]},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 2.C. NIS Data Sheet (Sibalom-San Jose IS).pdf","score":1.0,"matchedTerms":["jose","san"]},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Inventory Report - Detailed for REGION 6 12-31-2022.xlsx","score":1.0,"matchedTerms":["jose","san"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p17-y700","title":"San Juan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p19-y550","title":"San Juan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p24-y417","title":"San Lorenzo CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0405810000","municipality":"Pililla","province":"Rizal","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p25-y641","title":"San Rogue Malbog SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0506206000","municipality":"Castilla","province":"Sorsogon","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p14-y503","title":"Sangbay 1 CIS: Improvement of Canal Lining along MC at Station 0+155.00 - 0+160.00, 0+518.00 - 0+525.00, 2+392.00 - 2+692.00; Improvement of Canal Structurtes along MC at Station 0+118.00 -","psgc":"0205706014","municipality":"Nagtipunan","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"nep_only:nep-nia-p10-y622","title":"Santol CIS: Construction of Concrete Pavement","psgc":"0501610000","municipality":"Santa Elena","province":"Camarines Norte","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p26-y540","title":"Sibago SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y133","title":"Sibalom-San Jose RIS: Canal Lining/Bench Flume Lat. A Proper, Lat. B Proper, Lat. D-1 Proper,","psgc":"0600616000","municipality":"Sibalom","province":"Antique","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.E. Irrigation Systems Maintenance Plan_Sibalom San Jose IS.pdf","score":1.0,"matchedTerms":["jose","san","sibalom"]},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 2.C. NIS Data Sheet (Sibalom-San Jose IS).pdf","score":1.0,"matchedTerms":["jose","san","sibalom"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p05-y153","title":"Sibalom-San Jose RIS: Canal Lining/Bench Flume Lat. D-3, Lat. D-4 .","psgc":"0600616000","municipality":"Sibalom","province":"Antique","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.E. Irrigation Systems Maintenance Plan_Sibalom San Jose IS.pdf","score":1.0,"matchedTerms":["jose","san","sibalom"]},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 2.C. NIS Data Sheet (Sibalom-San Jose IS).pdf","score":1.0,"matchedTerms":["jose","san","sibalom"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p02-y214","title":"Sibalom-San Jose RIS: Concreting of Service Road along Lat. B(Proper) Road","psgc":"0600616000","municipality":"Sibalom","province":"Antique","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.E. Irrigation Systems Maintenance Plan_Sibalom San Jose IS.pdf","score":1.0,"matchedTerms":["jose","san","sibalom"]},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 2.C. NIS Data Sheet (Sibalom-San Jose IS).pdf","score":1.0,"matchedTerms":["jose","san","sibalom"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p02-y723","title":"Siluay RIS: Improvement of Service Roads along Main Canal","psgc":"1230800000","municipality":"City of General Santos","province":"South Cotabato","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/REPAIR CIS- CABANGAN CIS- 15M/General-Layout-Cabangan-CIS-Polangui-CY-2027-POW.pdf","matchedTerms":["general"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 5/SERVICEROADSNIS-DAET-TALISAY RIS-5.2M/GENERAL LAYOUT__DTRIS.pdf","matchedTerms":["general"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/RESTOCIS-TINDOG CIS-10M/TINDOG CIS GENERAL LAYOUT.jpg","matchedTerms":["general"]}]},{"id":"nep_only:nep-nia-p09-y767","title":"Simabusa-Nagbayruangan CIS: Concreting of Access Road at Lateral B Sta. 0+200 - 0+300","psgc":"0102905000","municipality":"Cabugao","province":"Ilocos Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p09-y337","title":"Simanu CIS: Propose Steel Gate & Lifting Mechanism at Intake Sta. 0+000 Rehabilitation/Dredging & Clearing of Ogee Dam","psgc":"0203133015","municipality":"San Pablo","province":"Isabela","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p03-y125","title":"Simulao RIS: Concreting of Service Roads at Main Canal","psgc":"1600312000","municipality":"Trento","province":"Agusan del Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p24-y325","title":"Sitio Lamuan Brgy Quisao SPIP: Establishment of Solar-Powered Pump Irrigation Project with AL Monitoring System","psgc":"0405810008","municipality":"Pililla","province":"Rizal","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["sitio","spip"]}]},{"id":"nep_only:nep-nia-p23-y732","title":"Sitio Panagsagan SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0000000000","municipality":"","province":"","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 4A/EPIPSOLAR-SITIO_KALAANAN SPIP-15M-POW.pdf","matchedTerms":["sitio","spip"]}]},{"id":"nep_only:nep-nia-p24-y142","title":"Sta. Cruz RIS - Pila Area: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0403422000","municipality":"Pila","province":"Laguna","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p24-y110","title":"Sta. Cruz RIS - Pila Area: Establishment of Solar-Powered Pump Irrigation Project with Al Monitoring System","psgc":"0403422000","municipality":"Pila","province":"Laguna","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p24-y81","title":"Sta. Cruz RIS: Establishment of Solar-Powered Pump Irrigation Project with Al Monitoring System","psgc":"0403426000","municipality":"Santa Cruz ","province":"Laguna","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p06-y401","title":"Sta. Lucia-Candon NIS: Repair of Canal Lining","psgc":"0102916000","municipality":"Salcedo","province":"Ilocos Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p27-y306","title":"Sudlon I CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0730600076","municipality":"City of Cebu ","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p19-y174","title":"Sumayaat CIS SPIP: Establishment of Solar-Powered Pump Irrigation Project with AI Monitoring System","psgc":"0102915000","municipality":"Quirino","province":"Ilocos Sur","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"nep_only:nep-nia-p16-y574","title":"TANGKALAN CPIS: Repair/Rehabilitation/Replacement of Existing Pump and Motors and Upgrading of Control System with Remote Monitoring System and Electrical System","psgc":"1705106006","municipality":"Mamburao ","province":"Occidental Mindoro","program":"Other Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y113","title":"TASMORIS (O'donnell Side): Construction of canal lining at Lateral B-1 and concreting of service road at Lateral B in Brgy. Calingcuan","psgc":"0306916024","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y175","title":"TASMORIS (O'donnell Side): Construction of canal lining at Lateral B-1 and concreting of service road at Lateral B in Brgy. Calingcuan","psgc":"0306916024","municipality":"City of Tarlac","province":"Tarlac","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y274","title":"TAYTAYAN CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"1102505018","municipality":"Cateel","province":"Davao Oriental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p28-y254","title":"TIBALAWAN SPIP: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"1102506018","municipality":"Governor Generoso","province":"Davao Oriental","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p04-y611","title":"Tigman-Hinagyanan-Inarihan RIS: Repair/Rehabilitation of Canalization at MC-1 Canal (Sta 0+000.00 -0+100.00) at Tigman Main Canal, Canal Lining at Inarihan Line-Main Canal (Sta 9+320.00 -","psgc":"0501704000","municipality":"Bombon","province":"Camarines Sur","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_2 Summary of Identified Irrigation Projects per Municipality.xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/R5_ANNEX D - INVESTMENT PROGRAM [Annex 5 v Main Document Write Up] (1).xlsx","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","score":1.0,"matchedTerms":["hinagyanan","inarihan","tigman"]}],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p15-y388","title":"Tindog CIS: Development of a new source, pipeline repair (500m), solar pumping system, new elevated reservoir","psgc":"0702231015","municipality":"Medellin","province":"Cebu","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p27-y184","title":"Tindog CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0702231015","municipality":"Medellin","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p26-y112","title":"Tipulan Dam SPIP: Establishment of Solar-Powered Pump Irrigation Project with AL Monitoring System","psgc":"0600616000","municipality":"Sibalom","province":"Antique","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p13-y500","title":"Titugop SIS: Construction of 20-meter spur dike at upstream portion of the existing diversion dam","psgc":"1130700073","municipality":"City of Davao","province":"Davao del Sur","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p08-y82","title":"Tugas-Can-Olin SRIS: IMPROVEMENT OF CANAL STRUCTURES AND CONCRETE CANAL LINING Canalization (Lateral 13 Sta. 0+000 to Sta. 0+180, Lateral 14 Sta. 0+000 to Sta. 0+650)","psgc":"0701211000","municipality":"Candijay","province":"Bohol","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/RESTONIS-TUGAS-CAN-OLIN-3M/RESTONIS-TUGAS-CAN-OLIN - 3.0M - PICTURES.pdf","matchedTerms":["can","olin","tugas"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/RESTONIS-TUGAS-CAN-OLIN-3M/RESTONIS-TUGAS-CAN-OLIN-3.0M - GEN. LAYOUT.pdf","matchedTerms":["can","olin","tugas"]},{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/REGION 7/RESTONIS-TUGAS-CAN-OLIN-3M/RESTONIS-TUGAS-CAN-OLIN-3.0M-POW.pdf","matchedTerms":["can","olin","tugas"]}]},{"id":"nep_only:nep-nia-p27-y286","title":"Upper Sudlon II CIS: Establishment of Solar Pump Irrigation Project with AI Monitoring","psgc":"0730600088","municipality":"City of Cebu ","province":"Cebu","program":"Establishment of Pump Irrigation Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]},{"id":"nep_only:nep-nia-p11-y468","title":"Villarose CIS: Repair of Canal Lining along Main Canal at Station 0+000.00 - 0+300.00; Construction of Canal Cover at Station 0-+149.00 - 0+175.00, Station 0+235.00, Station 1+400.00 - 1+518.00,","psgc":"0205702012","municipality":"Cabarroguis ","province":"Quirino","program":"Communal Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[{"file":"PROGRAM OF WORKS AND PICTURES (ONGOING UPLOADING)/MARIIS/2027-D3-EXTENSIONNIS-QUIRINO.pdf","matchedTerms":["quirino"]}]},{"id":"nep_only:nep-nia-p08-y579","title":"Visitacion Irrigation System: Retrofitting of VIS Dam","psgc":"0201523003","municipality":"Santa Ana","province":"Cagayan","program":"National Irrigation System Sub-Program","nimpMatches":[],"rimpMatches":[],"rdcFileCandidates":[],"powFileCandidates":[]}],"planSources":[{"plan":"NIMP","region":"National","file":"NATIONAL IRRIGATION MASTER PLAN (NIMP)/NIMP Abridged_per page.pdf","type":".pdf"},{"plan":"NIMP","region":"National","file":"NATIONAL IRRIGATION MASTER PLAN (NIMP)/NIMP Primer.pdf","type":".pdf"},{"plan":"RIMP","region":"CAR","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/CAR/RIMP-CAR 2023-2030 with Annexes.pdf","type":".pdf"},{"plan":"RIMP","region":"R1","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R1/RIMP_R1_Annexes_Consolidated.pdf","type":".pdf"},{"plan":"RIMP","region":"R1","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R1/RIMP_Region I_last edit 02-04-25.pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 1 - INVENTORY OF IRRIGATION SYSTEMS (BUKIDNON IMO).pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 1 - INVENTORY OF IRRIGATION SYSTEMS (LAMISCA IMO).pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 1 - INVENTORY OF IRRIGATION SYSTEMS (LDS IIMO).pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 10 - IRRIGATION SYSTEM MAINTENANCE PLAN.pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 11 - Well and spring inventory for NIA.csv","type":".csv"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 2- NIS SYSTEM DATA SHEET AND ASSESSMENT.pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 3 - ASSESSMENT OF PROGRAMMED PROJECTS (2023-2030).pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 4 - SUMMARY OF IDENTIFIED PROJECTS PER PROVINCES.pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 5 - 10 YEAR MASTER PLAN.pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 6 - 10 YEAR IRRIGATION DEVELOPMENT PROJECTS FSDE.pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 8 - 5 YEAR O&M DEVELOPMENT PLAN.pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X - ANNEX 9 - 3 YEAR IMPLEMENTATION PLAN FOR CIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/ANNEXES/REGION X- ANNEX 7.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R10","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R10/R10-RIMP-WORKING FILE-0726.pdf","type":".pdf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 10_Nice_01242024 - NIA XI Operation and Maintenance Section.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 1_2_Nice_04222024-inventory of areas summary - provincial summary.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 1_Nice_04222024-inventory of areas summary - regional summary.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 2.2.2 Convergence Accomplishment CY 2023.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 2_Nice_09222023-general information.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 3_Irene_09222023 - Irene Separa.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 4_Irene_09222023 - Irene Separa.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 6.5 NIA XI IDP Convergence Monitoring Template.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 6.5.1.2 CIS IA Functionality Survey Result.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 6.5.1.3 NIS IA Functionality Survey Result.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 6.5.3 Over-all IDP Status.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 6.5.5 List of Cap Build for NIA Staff.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 6_Irene_09222023 - Irene Separa.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 7 – Inventory of Watershed and Tributaries (Rivers, Creeks, Streams, etc.).xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 7.5.3.1 Budgetary Requirements and IDO Needed.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 8_Nice_01032024 - NIA XI Operation and Maintenance Section.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 8_Nice_052124-mc 91 form c.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex 9_Nice_01032024 - 3Yr Implementation Program CIS - NIA XI Operation and Maintenance Section.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/01_Annexes_RIMP_07-15-2024/Annex-5_Irene_01302024_basis-for-June-13-2024-presentation_FINAL-DATA.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/RIMP-RESULTS-MATRIX as of July 29, 2024 .xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/TABLE 13.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/TABLE 14.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/TABLE 15.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/TABLE 16.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/TABLE 2.4.1.2a .xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/TABLE 2.4.1.2b .xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/TABLE 2.4.2.a .xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/TABLE 2.4.2.b .xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 10_Angel.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 11_Angel_edited.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 12_TJ_edited-04222024.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 5_Rodel.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 6_-TJ-edited-04222024.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 7_Irene_edited.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 8_Irene.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table 9_Rodel.xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table-1_Rice-Suffiency-level_updated-as-of-July-2024 .xls","type":".xls"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table-2_TJ_edited_04222024.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table-3_TJ_edited-04222024 (1).xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/02_Tables_RIMP_07-15-2024/Table-4_Nice_04222024-cropping-intensity (1).xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure 1. Administrative Boundaries.jpg","type":".jpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure 2.4.1.3 Existing well and spring inventory map of Davao de Oro Province, Region XI.png","type":".png"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure 2.4.1.3.b   Existing well and spring inventory map of Davao del Sur Province, Region XI.jpg","type":".jpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure 2.4.1.3.c   Existing well and spring inventory map of Davao Occidental Province, Region XI.png","type":".png"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure 2.4.1.3.d Existing well and spring inventory map of Davao Oriental Province, Region.png","type":".png"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure 2_RIMP.pptx","type":".pptx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure 3_RIMP.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure 4_RIMP.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure.5_LJVictoriano_01242024_new.png","type":".png"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Figure2.4.1.3.a Existing well and spring inventory map of Davao del Norte Province, Region XI.png","type":".png"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of RPIA 2023 - REGION XI revised 1.png","type":".png"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of RPIA 2023 - REGION XI revised 2.png","type":".png"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Slide1.JPG","type":".jpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/03_Figures_RIMP_07-15-2024/Copy of Slide2.JPG","type":".jpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Administrative Boundary/R11 Administrative Boundary.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Administrative Boundary/R11 Administrative Boundary.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Administrative Boundary/R11 Administrative Boundary.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Administrative Boundary/R11 Administrative Boundary.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Administrative Boundary/R11 Administrative Boundary.shp","type":".shp"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Administrative Boundary/R11 Administrative Boundary.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/GPIA Final/GPIA 0-3.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/GPIA Final/GPIA 0-3.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/GPIA Final/GPIA 0-3.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/GPIA Final/GPIA 0-3.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/GPIA Final/GPIA 3-8.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/GPIA Final/GPIA 3-8.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/GPIA Final/GPIA 3-8.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/9 UPDATED PIA.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/9 UPDATED PIA.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/9 UPDATED PIA.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/9 UPDATED PIA.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/9 UPDATED PIA.shp","type":".shp"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/9 UPDATED PIA.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/REMAINING AREA TO BE DEVELOPED DAVAO ORIENTAL.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/REMAINING AREA TO BE DEVELOPED DAVAO ORIENTAL.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/REMAINING AREA TO BE DEVELOPED DAVAO ORIENTAL.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/REMAINING AREA TO BE DEVELOPED DAVAO ORIENTAL.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/REMAINING AREA TO BE DEVELOPED DAVAO ORIENTAL.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 2.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 2.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 2.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 2.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 2.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 3.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 3.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 3.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Remaining Areas DC District 3.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 0-3.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 0-3.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 0-3.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 0-3.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 0-3.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 3-8.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 3-8.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 3-8.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 3-8.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/Updated PIA Davao de Oro 3-8.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/polished_etia_mes_occi_05142024.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/polished_etia_mes_occi_05142024.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/polished_etia_mes_occi_05142024.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/polished_etia_mes_occi_05142024.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/polished_etia_mes_sur_05142023.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/polished_etia_mes_sur_05142023.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/polished_etia_mes_sur_05142023.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Remaining Areas To Be Developed/polished_etia_mes_sur_05142023.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 2(1).cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 2(1).prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 2(1).qix","type":".qix"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 2.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 2.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 2.qix","type":".qix"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 2.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 2.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 3.qix","type":".qix"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/DC District 3.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Occidental(1).prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Occidental(1).qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Occidental(1).shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Occidental.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Occidental.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Occidental.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Occidental.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Oriental(1).cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Oriental(1).prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Oriental(1).qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Oriental(1).shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Oriental.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Oriental.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Oriental.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao Oriental.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 0-3.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 0-3.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 0-3.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 0-3.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 0-3.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 3-8.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 3-8.dbf","type":".dbf"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 3-8.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 3-8.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao de Oro 3-8.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Norte.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Norte.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Norte.qix","type":".qix"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Norte.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Norte.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Sur.cpg","type":".cpg"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Sur.prj","type":".prj"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Sur.qmd","type":".qmd"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/04_Updated_PIA_07-15-2024/RIMP Shapefiles July 15 2024/Updated PIA/Davao del Sur.shx","type":".shx"},{"plan":"RIMP","region":"R11","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R11/02_RIMP/R11 RIMP 2023-2030_07262024.pdf","type":".pdf"},{"plan":"RIMP","region":"R12","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R12/Copy of R12_RIMP ANNEX 5 FINAL.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R12","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R12/[Region XII] Regional Irrigation Master Plan (RIMP) 2023-2030 ().pdf","type":".pdf"},{"plan":"RIMP","region":"R13","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R13/Region XIII RIMP with Annexes as of August 16 2024.pdf","type":".pdf"},{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/Annexes_rev06.pdf","type":".pdf"},{"plan":"RIMP","region":"R2-MARIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R2-MARIIS/[RIMP-R2] FINAL CONSOLIDATED RIMP -MAIN REPORT - JULY 15, 2024.pdf","type":".pdf"},{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/FINAL REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","type":".pdf"},{"plan":"RIMP","region":"R3-UPRIIS","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R3-UPRIIS/NEW-ANNEXES-FINAL-REGIONAL IRRIGATION MASTER PLAN-REGION 3-CENTRAL-LUZON.pdf","type":".pdf"},{"plan":"RIMP","region":"R4A","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4A/2024-08-16-Final-RIMP-Region-IV-A with Annexes.pdf","type":".pdf"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 11 NIA-MIMAROPA-SLP-PCB-Status-Report-as-of-December-31-2023.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 13-18.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 22 Percentage of IAs Increased Functionality Level from CY 2022-2030.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 3_RIMP_JULY-25-2024-per-province.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 4-5.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 5- IRRIGATION DEVELOPMENT PROGRAM.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 6_FSDE-MASTERPLAN_JULY-25-2024.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 7.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/ANNEX 8 5-Year O&M Development Plan for NIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 1.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 10 Maintenance-Plan-Actual.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 10 Maintenance-Plan-Reference.pdf","type":".pdf"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 12.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 19-21.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 2.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 23-27.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/ANNEXES/Annex 9 THREE YEAR DEVELOPMENT PLAN.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R4B","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R4B/RIMP MAIN DOCUMENT/RIMP MIMAROPA 8-16-2024.pdf","type":".pdf"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4-2. Three-Year Devolution Transition Plan of CIS.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 4_1 Inventory of National and Communal Irrigation System including SSIP.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_1 Assessment of Programmed Projects.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_2 Summary of Identified Irrigation Projects per Municipality.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_3. DPWH Convergence Program to NIA FY 2025.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 6_4. Detailed Damage_Losses_Recovery and Reconstruction Needs Agriculture and Fisheries Subsector.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/Annex 7_1. Identfied Areas and Systems for NIA Contract Farming.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Annexes/R5_ANNEX D - INVESTMENT PROGRAM [Annex 5 v Main Document Write Up] (1).xlsx","type":".xlsx"},{"plan":"RIMP","region":"R5","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R5/[R5] Revised RIMP July 15_ Region V/Revised RIMP July 15_ Region V/R5 FINAL RIMP as of Aug. 16, 2024.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/R6_Merged As of September 30, 2024 with ToC.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 1.A. Inventory of Irrigation Systems.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 1.B. List of Completed SSIP.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.A. Irrigation Systems Maintenance Plan_Aklan_Panakuyan RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.B. Irrigation Systems Maintenance Plan_Bago RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.C. Irrigation Systems Maintenance Plan_Mambusao RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.D. Irrigation Systems Maintenance Plan_Pangiplan RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 10.E. Irrigation Systems Maintenance Plan_Sibalom San Jose IS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 2.A. NIS Data Sheet (Aklan RIS).pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 2.B. NIS Data Sheet (Panakuyan RIS).pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 2.C. NIS Data Sheet (Sibalom-San Jose IS).pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 2.D. NIS Data Sheet (Mambusao RIS).pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 3- Summary of Identified Projects per Province.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 6. 10 Year Irrigation Development FSDE.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 8.A. Five-year Operation and Maintenance Development Plan for existing National Irrigation Systems_Aklan RIS_Panakuyan RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 8.B. Five-year Operation and Maintenance Development Plan for existing National Irrigation Systems_Mambusao RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 8.C. Five-year Operation and Maintenance Development Plan for existing National Irrigation Systems_Aganan Sta. Barbara RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 8.D. Five-year Operation and Maintenance Development Plan for existing National Irrigation Systems_Jalaur Suage RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 8.F. Five-year Operation and Maintenance Development Plan for existing National Irrigation Systems_Barotac Viejo RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 8.G. Five-year Operation and Maintenance Development Plan for existing National Irrigation Systems_Bago RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Annex 8.H. Five-year Operation and Maintenance Development Plan for existing National Irrigation Systems_Sibalom RIS.pdf","type":".pdf"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Annexes/Inventory Report - Detailed for REGION 6 12-31-2022.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/CIS Farming Activities UPDATED CY 2024 ANNUAL.xlsm","type":".xlsm"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Administrative Bdry Map Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Aklan_GROSS.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Aklan_NET.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Aklan_RemainingAreas.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Antique_Gross.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Antique_NET.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Antique_RemainingAreas.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/CADT Map Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Capiz_Gross.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Capiz_NET.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Capiz_RemainingAreas.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Guimaras_NET.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Guimaras_RemainingAreas.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Guimaras_gross.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Iloilo_Gross.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Iloilo_NET.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Iloilo_RemaingAreas.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Layout 1_Cover.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/NegOcc_Gross.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/NegOcc_NET.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/NegOcc_RemainingAreas.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Banana_Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_ClimateType.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_DevelopedAreas.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_GROSS.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Irrlowlric_Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Maize_Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Mango_Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_NET 2.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_NET.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Rainlowlric_Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Rainupric_Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_RemainingAreas.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Rivers&Watersheds.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Sugarcane_Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/R6_Watershed 2.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Slope Map Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Final Maps/Topographic Map Portrait.png","type":".png"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/IDS/FORM 4_DEC. 2022.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/IDS/RIMP ANNEXES.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Provincial Summary - REGION MARCH 3, 2023.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R6","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R6/RIMP Annexes/Regional Summary - REGION 62022MARCH 3 2023 PM.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/2.3.2 Land Classification Annex (August 13, 2024).docx","type":".docx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/2.4.1.1 Main Watershed in the Region Annex (August 14, 2024).docx","type":".docx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/6.4.1 Watershed Formulation Annex (August 14, 2024).docx","type":".docx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/ANNEX 6-2. 10- Year Irrigation Development Program.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/ANNEX 6-4. 10 YEAR IDP (FSDE).xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/Annex 2 NIS System Data Sheet..xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/Annex 6-1. Location of Proposed Big-ticket Projects.jpeg","type":".jpeg"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/Annex 6-3 Summary of Identified Irrigation Projects per Municipality.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/Annex 6-5 Assessment of Programmed Projects (2023-2030).xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/Annex 6-6. Detailed volume of flood.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/Annex 6-7. Breakdown of activities and estimated budget for in-house based irrigation water resources plan formulation.docx","type":".docx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/Annex 6-8. Target Budgetary Requirements of IDP acitivities.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/CHAPTER 7 ANNEXES.docx","type":".docx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/LAND RESOURCES ANNEX.docx","type":".docx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/PHYSICAL-AND-FINANCIAL-TARGETS-FOR-DA-MACHINERY.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/ANNEXES/RIMP Annex 8, 9 & 10.xlsx","type":".xlsx"},{"plan":"RIMP","region":"R7","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R7/RIMP FINAL/RIMP_CENTRAL VISAYAS_2024 (Updated October 12).pdf","type":".pdf"},{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/ANNEX 5 (2.7.25).xlsx","type":".xlsx"},{"plan":"RIMP","region":"R8","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R8/EASTERN VISAYAS-RIMP-2023-2030 (1).pdf","type":".pdf"},{"plan":"RIMP","region":"R9","file":"REGIONAL IRRIGATION MASTER PLAN (RIMP)/R9/R9-RIMP-Working-File-Final-Revised with Annexes.pdf","type":".pdf"}]}
