Interactive charts and visualizations of budget data
Loading budget data...
Loading...
Loading...
Loading...
Loading...
See how NEP allocations correlate with actual budget expenditures
📈 View NEP-Budget Correlation →Automated first-sheet chart preview.
Using the known Bulacan flood control scheme as a baseline to identify similar suspicious patterns in NEP 2026
Road infrastructure spending in NEP 2026 shows a +61.9% increase vs historical average (2020-2025), exceeding the flood control pattern threshold of ≥50% YoY growth.
+61.9% increase vs historical average exceeds flood control threshold (≥50%)
Reference pattern: +118% growth (2022→2023) with geographic concentration
+7.4% (Normal)
27.2% in top 3 regions (Better than flood's 60%)
+61.9% increase (Exceeds 50% threshold)
+33.6% (Below threshold)
This analysis uses the known Bulacan flood control scheme (2020-2024) as a baseline pattern. The Bulacan pattern showed +118% growth in 2022→2023 with 60% geographic concentration. We compared NEP 2026 against Budget history (2020-2025) to identify similar patterns. Threshold: ≥50% YoY growth is flagged as matching the flood control scheme.
Browse and sort budget data with pagination
Aggregate insertions by program and district engineering office sourced from Citizens Budget Tracker (Flood Control 2018-2025) sheet Insertion.
Loading insertion pivot…
Track line-by-line budget changes from NEP to final GAB across all government departments
-
-
-
-
Loading budget amendments...
Track duplicate entries in Farm-to-Market Road projects with similar names and amounts
-
Annex A-1 (all)
-
-
-
Loading duplicate data...
Track DPWH projects from Annex A-5 with statistical analysis
-
Annex A-5 (all)
-
-
-
-
-
Loading DPWH data...
Track NIA operations from Annex A-4 with statistical analysis
-
Annex A-4 (all)
-
-
-
-
-
Loading NIA data...
Analysis of Annex A-5 projects revealing 105 different uniform decrease patterns affecting 9,183 projects (53.5%). Each pattern represents a fixed percentage decrease from Column O (GAB/original) to Column S (Final) applied systematically across multiple projects, suggesting uniform budget adjustments that may obscure original rounded allocations.
Loading analysis data...
-
-
-
-
This chart shows the pattern of uniform percentage decreases applied across Annex A-5 projects. Each bar represents a specific decrease percentage and how many projects use that exact percentage.
Each row shows a fixed percentage decrease and how many projects use that exact percentage, demonstrating systematic uniform reductions.
| Rank | Fixed Decrease % | Number of Projects |
|---|