Eight cross-project concerns to follow across the research pages. Cards use the best available amount measure—screened allocation or absolute allocation movement—so they are not one common risk score. Screens overlap; amounts are not losses and must not be added together.
01 · NEP → HGABUndocumented HGAB
2,355 remain · ₱71.01B295 reported removed · ₱8.836B
Across all 15,979 HGAB rows, 13,624 (85.26%) have a Proposal or Senate HGAB document match. 2,355 rows worth ₱71.01B currently have no matched document from either source. The reported Senate/GAB removals (295 items; ₱8.836B) remain aggregate-only and cannot be assigned to individual rows from the available data.
Review undocumented HGAB projects →SCR Removed in this card's review set: 1,193 matched projects · ₱31.326B
House-allocation exposure after SCR removals: ₱39.686B (starting exposure ₱71.012B).
3 rows are not uniquely matched to an SCR line. These are budget-stage removals, not realized savings.
02 · NEP → HGAB retained linesOffice and allocation changes
₱92.744B absolute movement · 439 changes−₱82.379B net change215 increases · 224 decreases67 office changes126 changes ≥₱50M
Absolute movement sums the size of each matched line’s allocation change, so increases and decreases both count. Net allocation across these lines fell by ₱82.379B. Changed scope or office assignment needs review; this is not a loss estimate.
SCR Removed in this card's review set: 95 matched projects · ₱4.258B
House-allocation exposure after SCR removals: ₱19.924B (starting exposure ₱24.182B).
0 rows are not uniquely matched to an SCR line. These are budget-stage removals, not realized savings.
03 · Historical and within-stageProject repeats across GAA and HGAB
₱51.293B · 1,576 unique NEP proposals2,135 NEP–GAA pairs97 HGAB 3rd repeat pairs13 with explicit chainage overlap
This is the unique NEP proposal allocation represented in the repeat screen, not a duplicate-loss estimate. Recurring titles or ranges call for scope checks; they do not establish duplicate funding.
Review repeat screens →SCR Removed in this card's review set: 58 matched projects · ₱1.640B
House-allocation exposure after SCR removals: ₱49.653B (starting exposure ₱51.293B).
276 rows are not uniquely matched to an SCR line. These are budget-stage removals, not realized savings.
04 · Project scaleMPBs and INSPIRE
₱38.747B · 2,835 MPB candidatesMPBs have 2,835 records without a selected NEP counterpart under the current matcher. INSPIRE is a returning named appropriation: ₱300M in GAA 2023, ₱100M in GAA 2025 and ₱835M proposed for FY2027.
SCR Removed in this card's review set: 1,395 matched projects · ₱20.170B
House-allocation exposure after SCR removals: ₱18.576B (starting exposure ₱38.747B).
1 rows are not uniquely matched to an SCR line. These are budget-stage removals, not realized savings.
05 · Cost densityCost density and bill-unit summaries
₱29.317B across 191 high-rate screens111 also cross the peer outlier fence4,243 printed project summaries · 7 groups
Allocation per stated meter is separate from parsed bill-item cost per unit. Unit-cost distributions and summaries vary by group, printed bill and cost basis; the PCCP Atlas is a separate regional reference analysis.
SCR Removed in this card's review set: 27 matched projects · ₱4.467B
House-allocation exposure after SCR removals: ₱24.850B (starting exposure ₱29.317B).
0 rows are not uniquely matched to an SCR line. These are budget-stage removals, not realized savings.
06 · Farm-to-market roadsFMR road and cropland proximity
₱15.759B · 795 Flag / Double Flag projects43 Other / coordinate review · ₱1.047B126 Baseline · ₱2.822B5 Coordinate review964 FMRs screened
Printed route endpoints are compared with DPWH classified roads and ESA WorldCover 2021 mapped cropland using a shared 500 m cutoff. Rows with endpoint gaps over 20 km remain in coordinate review. Proximity does not prove road access or farm use.
Review FMR road and cropland distances →SCR Removed in this card's review set: 349 matched projects · ₱6.868B
House-allocation exposure after SCR removals: ₱8.892B (starting exposure ₱15.759B).
0 rows are not uniquely matched to an SCR line. These are budget-stage removals, not realized savings.
07 · LocationLocation concerns, including OOP
₱3.310B · 176 map-review records170 OOP projects are flagged as outside their named locality. Printed coordinates and locality matches need map and source-page checks.
Review location map →SCR Removed in this card's review set: 53 matched projects · ₱1.413B
House-allocation exposure after SCR removals: ₱1.897B (starting exposure ₱3.310B).
0 rows are not uniquely matched to an SCR line. These are budget-stage removals, not realized savings.
08 · Scope and documentationRainwater Collector Systems
₱835.8M · 199 DEO linesAll 199 DEO lines carry the same amount; POW details are currently extracted for 22. Compare site, capacity, quantities and design before interpreting a standard package.
Review RCS allocations and POW evidence →SCR Removed in this card's review set: 0 matched projects · ₱0.000M
House-allocation exposure after SCR removals: ₱835.800M (starting exposure ₱835.800M).
199 rows are not uniquely matched to an SCR line. These are budget-stage removals, not realized savings.