Pair counts are distinct from project counts; amounts overlap across screens.
Missing chainage never establishes overlapping scope. Review source documents and engineering quantities.
Use the DPWH program filter for MPB, roads, bridges and flood-control repeats. FMR and NIA historical screens follow. HFEP currently has repeated-amount and facility review screens, not an equivalent validated historical project-repeat table; see HFEP. Different years and stages remain separate, with their existing source and scope limits.
DPWH vs GAA · HGAB survival · Within-stage comparisons · FMR · NIA · Method and denominators
Potential repeated line items: FY2027 NEP → FY2026 GAA, then FY2025 GAA
Multi-purpose buildings, roads, bridges, and flood-control projects. The name screen found 283 FY2027 NEP lines with a 90% or higher title match in the FY2026 enacted GAA, and 454 with a 90% or higher title match in the FY2025 enacted GAA. Bridge candidates require overlapping plus-form chainage. Road matches are excluded when both stated ranges are disjoint; missing chainage is flagged for review. Different package, phase, stage, lot or segment labels require scope review. They may identify legitimate separate work or changes in how the same work is described; overlapping chainage still signals shared extent. Explicit opposing directions are excluded. For all categories, verify location, scope, phase, and completion status before treating a row as the same project. Explicit opposing directions are excluded as location conflicts. Amounts are in pesos. Title similarity is a screening lead, not proof that two appropriations cover the same scope.
PH location DB supplies current 20th Congress names through qualified geographic context and the strict local-map screening rules. Uncertain locations stay blank. Names describe geographic coverage, not sponsorship.
| Program | FY2027 NEP line item | NEP chainage | District office | Representative(s) by named project location | FY2027 NEP | GAA year | Enacted GAA line item | GAA chainage | Chainage / tranche check | GAA amount | Title match | GAA source |
|---|
Of the NEP repeat candidates, how many survived into HGAB?
The 737 headline is a NEP-level comparison with old enacted GAA. Tracing the same proposal codes into HGAB 3rd reading gives 634 clearly retained comparison pairs, representing 591 distinct proposals. Potential links remain separate.
| HGAB retention class | Original GAA comparison pairs | Distinct NEP proposals | Original NEP allocation pesos | Selected HGAB allocation pesos |
|---|---|---|---|---|
| Clear retained link | 634 | 591 | ₱21,759,635,750 | ₱21,107,135,750 |
| Potential retained link | 55 | 50 | ₱2,034,204,000 | ₱2,328,455,000 |
| Unselected counterpart requires review | 0 | 0 | ₱0 | No selected allocation |
| No selected or cited counterpart | 48 | 45 | ₱3,466,432,000 | No selected allocation |
A proposal matched to two historical years counts twice in the pair column but once in the proposal column. Clear retention means a selected, scope-compatible normalized-title link in our current parser, not a certified work-scope audit. A potential retained link is a provisional selected counterpart. Missing links do not establish that HGAB removed the project.
Export all 686 proposal traces CSV · Full pair and proposal evidence JSON
For retained proposals, investigate whether old appropriations and HGAB fund the same component. For unmatched proposals, check renaming, segmentation, parser fragments and original pages before claiming removal. Amount changes on retained lines are allocation adjustments, not automatically insertion or removal.
Similar line items within NEP and within HGAB 3rd reading
This screen compares NEP with other NEP occurrences, and HGAB 3rd reading with other HGAB 3rd-reading occurrences. It complements the historical GAA screen. Similar titles are candidates for scope review, not established duplicate work. Pair counts and distinct allocation occurrences have different denominators.
| Stage | Source occurrences | Screened occurrences | Candidate pairs | Distinct flagged occurrences | Pairs with explicit range overlap |
|---|---|---|---|---|---|
| FY2027 NEP | 11420 | 10621 | 73 | 87 | 8 |
| FY2027 HGAB 3rd | 16275 | 15325 | 135 | 200 | 13 |
FY2027 NEP · first 50 review pairs
Explicit overlap comes first, followed by identical full titles, then the larger individual allocation. All candidate pairs are available in the downloadable JSON. The CSV exports the displayed pairs.
| First project · source | Second project · source | Official program | Implementing offices | Individual allocations pesos · first / second | Screening evidence | Stated segment evidence |
|---|---|---|---|---|---|---|
| Construction of Drainage along Taft Ave S02958LZ K0003 + 875 - K0002 + 532 · p347:r10 · NEP source p. 347 | Construction of Drainage along Taft Ave S02958LZ K0004 + (-330) - K0003 + 875 · p347:r11 · NEP source p. 347 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems | South Manila District Engineering Office / South Manila District Engineering Office | ₱125,000,000 / ₱575,000,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 3+670.00–3+875.00 |
| Iloilo-Capiz Rd (New Route) - K0115 + 459 - K0115 + 27357, K0115 + 459 - K0115 + 27624 · p262:r21 · NEP source p. 262 | Iloilo-Capiz Rd (New Route) - K0115 + 459 - K0115 + 25973 · p264:r16 · NEP source p. 264 | Road Widening - Primary Roads | Capiz 2nd District Engineering Office / Capiz 2nd District Engineering Office | ₱84,747,000 / ₱10,892,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 115+459.00–140+973.00 · 115+459.00–140+973.00 |
| Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 0 + 000 - Sta. 0 + 520, Section II: Sta. 6 + 992 - Sta. 7 + 156.2, Section III: Sta. 7 + 201.8 - Sta. 7 + 292, San Antonio, Quezon · p296:r14 · NEP source p. 296 | Quezon Eco - Tourism - Sariaya - Candelaria - Tiaong - San Antonio Road, Section I: Sta. 0 + 000 - Sta. 0 + 520, Section II: Sta. 6 + 992 - Sta. 7 + 156.2, Section III: Sta. 7 + 201.8 - Sta. 8 + 301, San Antonio, Quezon · p296:r15 · NEP source p. 296 | Construction of Missing Links/ New Roads | Quezon 2nd District Engineering Office / Quezon 2nd District Engineering Office | ₱84,700,000 / ₱76,000,000 | Similar title with explicit chainage overlap · Qualified municipality and province agree | overlap · 0+000.00–0+520.00 · 6+992.00–7+156.20 · 7+201.80–7+292.00 |
| Aklan West Rd (Kalibo-Nabas) - K0266 + 528 - K0267 + 249, K0267 + 282 - K0267 + 580, K0271 + 268 - K0271 + 484 · p267:r13 · NEP source p. 267 | Aklan West Rd (Kalibo-Nabas) - K0266 + 528 - K0267 + 249, K0267 + 282 - K0267 + 580 · p272:r11 · NEP source p. 272 | Road Widening - Secondary Roads | Aklan District Engineering Office / Aklan District Engineering Office | ₱65,675,000 / ₱24,352,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 266+528.00–267+249.00 · 267+282.00–267+580.00 |
| Aklan West Rd (Kalibo-Nabas) - K0266 + 528 - K0267 + 249, K0267 + 282 - K0267 + 580, K0271 + 268 - K0271 + 484 · p267:r13 · NEP source p. 267 | Aklan West Rd (Kalibo-Nabas) - K0271 + 268 - K0271 + 484 · p272:r12 · NEP source p. 272 | Road Widening - Secondary Roads | Aklan District Engineering Office / Aklan District Engineering Office | ₱65,675,000 / ₱5,282,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 271+268.00–271+484.00 |
| Siocon-Sirawai-Sibuco-Limpapa Rd - K2105 + 000 - K2107 + 696 · p215:r19 · NEP source p. 215 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2108 + (-448) - K2109 + 000 · p215:r20 · NEP source p. 215 | Preventive Maintenance - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱40,425,000 / ₱21,720,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 2107+552.00–2107+696.00 |
| Bacolod South Rd (Kabankalan-Hinobaan Section) - K0105 + 1513 - K0105+1952, K0108 + 588 - K0108 + 1013 · p235:r17 · NEP source p. 235 | Bacolod South Rd (Kabankalan-Hinobaan Section) - K0109 + 001 - K0110 + 683, K0115 + 879 - K0115 + 996 · p235:r18 · NEP source p. 235 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Negros Occidental 3rd District Engineering Office / Negros Occidental 3rd District Engineering Office | ₱18,144,000 / ₱38,283,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 109+001.00–109+013.00 |
| Construction of Road with Drainage at Barangay Tawason, Mandaue City - Sta. 0+000.00 - Sta. 0+475.00 · p537:r11 · NEP source p. 537 | Construction of Road with Drainage at Barangay Tawason, Mandaue City, Sta 0+000.00 - Sta 0+450.00 · p537:r12 · NEP source p. 537 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Cebu 6th District Engineering Office / Cebu 6th District Engineering Office | ₱8,700,000 / ₱13,875,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 0+000.00–0+450.00 |
| Construction (Completion) of Public Water Supply System, Barangay New Taligue, Abuyog, Leyte · p417:r11 · NEP source p. 417 | Construction (Completion) of Public Water Supply System, Brgy. New Taligue, Abuyog, Leyte · p417:r14 · NEP source p. 417 | Water Supply System | Leyte 5th District Engineering Office / Leyte 5th District Engineering Office | ₱2,500,000 / ₱2,500,000 | Identical normalized full title · Qualified municipality and province agree | not stated · |
| Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Brgy. Hagpa, Sta. 30+055. - Sta. 33+855, Impasug-ong, Bukidnon · p299:r3 · NEP source p. 299 | Malaybalay-Gingoog Road (Gingoog City-Kalhaan, Claveria-Bulonay-Malaybalay City), Brgy. Hagpa, Sta. 82+350 - Sta. 82+550, Impasug-ong, Bukidnon · p299:r4 · NEP source p. 299 | Construction of Missing Links/ New Roads | Bukidnon 1st District Engineering Office / Bukidnon 1st District Engineering Office | ₱300,000,000 / ₱60,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | incomplete · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 13315 - Chainage 15237, Chainage 15520 - Chainage 19774 · p208:r12 · NEP source p. 208 | Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 20500 - Chainage 21000, Chainage 21400 - Chainage 21800, Chainage 23000 - Chainage 23368, Chainage 29000 - Chainage 29986 · p215:r16 · NEP source p. 215 | Preventive Maintenance - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱190,461,000 / ₱33,810,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 13315 - Chainage 15237, Chainage 15520 - Chainage 19774 · p208:r12 · NEP source p. 208 | Siocon-Sirawai-Sibuco-Limpapa Rd - (S01151MN) Chainage 30016 - Chainage 30473, Chainage 30498 - Chainage 31400, Chainage 31700 - Chainage 32000, Chainage 32300 - Chainage 32790 · p215:r17 · NEP source p. 215 | Preventive Maintenance - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱190,461,000 / ₱32,235,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Mauban Bypass Road (Bridge 3), Mauban, Quezon · p281:r2 · NEP source p. 281 | Mauban Bypass Road (Bridge 4), Mauban, Quezon · p281:r3 · NEP source p. 281 | Construction of By-Pass and Diversion Roads | Quezon 1st District Engineering Office / Quezon 1st District Engineering Office | ₱150,000,000 / ₱60,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Mauban Bypass Road (Bridge 3), Mauban, Quezon · p281:r2 · NEP source p. 281 | Mauban Bypass Road (Bridge 5), Mauban, Quezon · p281:r4 · NEP source p. 281 | Construction of By-Pass and Diversion Roads | Quezon 1st District Engineering Office / Quezon 1st District Engineering Office | ₱150,000,000 / ₱60,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Libmanan-Cabusao Rd - (S03529LZ) Chainage 830 - Chainage 2037 · p218:r10 · NEP source p. 218 | Libmanan-Cabusao Rd - (S03529LZ) Chainage 000 - Chainage 830 · p221:r10 · NEP source p. 221 | Preventive Maintenance - Tertiary Roads | Camarines Sur 2nd District Engineering Office / Camarines Sur 2nd District Engineering Office | ₱103,558,000 / ₱21,093,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Libmanan-Cabusao Rd - (S03529LZ) Chainage 2037 - Chainage 4074 · p218:r9 · NEP source p. 218 | Libmanan-Cabusao Rd - (S03529LZ) Chainage 830 - Chainage 2037 · p218:r10 · NEP source p. 218 | Preventive Maintenance - Tertiary Roads | Camarines Sur 2nd District Engineering Office / Camarines Sur 2nd District Engineering Office | ₱103,558,000 / ₱103,558,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Libmanan-Cabusao Rd - (S03529LZ) Chainage 2037 - Chainage 4074 · p218:r9 · NEP source p. 218 | Libmanan-Cabusao Rd - (S03529LZ) Chainage 000 - Chainage 830 · p221:r10 · NEP source p. 221 | Preventive Maintenance - Tertiary Roads | Camarines Sur 2nd District Engineering Office / Camarines Sur 2nd District Engineering Office | ₱103,558,000 / ₱21,093,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18000 - Chainage 18070 · p251:r11 · NEP source p. 251 | Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18900 - Chainage 19007 · p251:r12 · NEP source p. 251 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | Cagayan 2nd District Engineering Office / Cagayan 2nd District Engineering Office | ₱75,000,000 / ₱100,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18900 - Chainage 19007 · p251:r12 · NEP source p. 251 | Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 507 - Chainage 552 · p253:r14 · NEP source p. 253 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | Cagayan 2nd District Engineering Office / Cagayan 2nd District Engineering Office | ₱100,000,000 / ₱50,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd · p198:r7 · NEP source p. 198 | Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1874 + 687 - K1883 + 420 · p198:r9 · NEP source p. 198 | Preventive Maintenance - Primary Roads | Zamboanga del Norte 1st District Engineering Office / Zamboanga del Norte 1st District Engineering Office | ₱83,000,000 / ₱72,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18000 - Chainage 18070 · p251:r11 · NEP source p. 251 | Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 507 - Chainage 552 · p253:r14 · NEP source p. 253 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | Cagayan 2nd District Engineering Office / Cagayan 2nd District Engineering Office | ₱75,000,000 / ₱50,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Construction of Flood Control Structure, Baybay Sapa (Upstream), Station 0+365 - Station 1+215, Barangay Mayamot, Antipolo City, Rizal · p354:r4 · NEP source p. 354 | Construction of Flood Control Structure, Baybay Sapa (Upstream), Station 1+215 Station 2+065, Barangay Mayamot, Antipolo City, Rizal · p354:r5 · NEP source p. 354 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems | Rizal 1st District Engineering Office / Rizal 1st District Engineering Office | ₱75,000,000 / ₱75,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | incomplete · |
| Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 1287 - Chainage 2288 · p230:r7 · NEP source p. 230 | Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 287 - Chainage 1287 · p230:r8 · NEP source p. 230 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Camarines Sur 1st District Engineering Office / Camarines Sur 1st District Engineering Office | ₱65,065,000 / ₱65,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 004 - Chainage 287 · p233:r29 · NEP source p. 233 | Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 1287 - Chainage 2288 · p230:r7 · NEP source p. 230 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Camarines Sur 1st District Engineering Office / Camarines Sur 1st District Engineering Office | ₱18,395,000 / ₱65,065,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 004 - Chainage 287 · p233:r29 · NEP source p. 233 | Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 287 - Chainage 1287 · p230:r8 · NEP source p. 230 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Camarines Sur 1st District Engineering Office / Camarines Sur 1st District Engineering Office | ₱18,395,000 / ₱65,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433 · p238:r7 · NEP source p. 238 | Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960 · p238:r10 · NEP source p. 238 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Camarines Norte Sub District Engineering Office / Camarines Norte Sub District Engineering Office | ₱60,855,000 / ₱60,855,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433 · p238:r7 · NEP source p. 238 | Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302 · p238:r8 · NEP source p. 238 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Camarines Norte Sub District Engineering Office / Camarines Norte Sub District Engineering Office | ₱60,855,000 / ₱60,854,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433 · p238:r7 · NEP source p. 238 | Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131 · p238:r9 · NEP source p. 238 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Camarines Norte Sub District Engineering Office / Camarines Norte Sub District Engineering Office | ₱60,855,000 / ₱55,854,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302 · p238:r8 · NEP source p. 238 | Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960 · p238:r10 · NEP source p. 238 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Camarines Norte Sub District Engineering Office / Camarines Norte Sub District Engineering Office | ₱60,854,000 / ₱60,855,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131 · p238:r9 · NEP source p. 238 | Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960 · p238:r10 · NEP source p. 238 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Camarines Norte Sub District Engineering Office / Camarines Norte Sub District Engineering Office | ₱55,854,000 / ₱60,855,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302 · p238:r8 · NEP source p. 238 | Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131 · p238:r9 · NEP source p. 238 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Camarines Norte Sub District Engineering Office / Camarines Norte Sub District Engineering Office | ₱60,854,000 / ₱55,854,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Mauban Bypass Road (Bridge 4), Mauban, Quezon · p281:r3 · NEP source p. 281 | Mauban Bypass Road (Bridge 5), Mauban, Quezon · p281:r4 · NEP source p. 281 | Construction of By-Pass and Diversion Roads | Quezon 1st District Engineering Office / Quezon 1st District Engineering Office | ₱60,000,000 / ₱60,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 13226 - Chainage 15375 · p268:r21 · NEP source p. 268 | Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 15395 - Chainage 17000 · p273:r22 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱53,413,000 / ₱39,892,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 13226 - Chainage 15375 · p268:r21 · NEP source p. 268 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2098 + 500 - K2100 + 000 · p273:r23 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱53,413,000 / ₱37,257,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 13226 - Chainage 15375 · p268:r21 · NEP source p. 268 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2100 + 000 - K2102 + 000 · p273:r24 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱53,413,000 / ₱49,710,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 13226 - Chainage 15375 · p268:r21 · NEP source p. 268 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2102 + 000 - K2103 + 000 · p273:r25 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱53,413,000 / ₱24,853,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 13226 - Chainage 15375 · p268:r21 · NEP source p. 268 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2103 + 000 - K2104 + 000 · p273:r26 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱53,413,000 / ₱24,829,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Construction of Low Height Dam 1 at Barangay Bagyang, San Miguel, Surigao del Sur · p393:r21 · NEP source p. 393 | Construction of Low Height Dam 2 at Barangay Bagyang, San Miguel, Surigao del Sur · p393:r22 · NEP source p. 393 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems | Surigao del Sur 1st District Engineering Office / Surigao del Sur 1st District Engineering Office | ₱50,000,000 / ₱50,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 15395 - Chainage 17000 · p273:r22 · NEP source p. 273 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2100 + 000 - K2102 + 000 · p273:r24 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱39,892,000 / ₱49,710,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Construction of Bridge, Barangay Concepcion, Sto. Domingo, Nueva Ecija Sta. 0+000 - Sta. 0+035 · p494:r12 · NEP source p. 494 | Construction of Bridge, Barangay Concepcion, Sto. Domingo, Nueva Ecija · p494:r11 · NEP source p. 494 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Nueva Ecija 1st District Engineering Office / Nueva Ecija 1st District Engineering Office | ₱47,850,000 / ₱47,850,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 11698 - Chainage 13131 · p310:r31 · NEP source p. 310 | Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 13131 - Chainage 14883 · p311:r0 · NEP source p. 311 | Paving of Unpaved Roads - Tertiary Roads | Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office | ₱37,762,000 / ₱46,169,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 13131 - Chainage 14883 · p311:r0 · NEP source p. 311 | Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 9103 - Chainage 9131 · p311:r1 · NEP source p. 311 | Paving of Unpaved Roads - Tertiary Roads | Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office | ₱46,169,000 / ₱738,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 13131 - Chainage 14883 · p311:r0 · NEP source p. 311 | Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 9131 - Chainage 10870 · p311:r2 · NEP source p. 311 | Paving of Unpaved Roads - Tertiary Roads | Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office | ₱46,169,000 / ₱45,826,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 11698 - Chainage 13131 · p310:r31 · NEP source p. 310 | Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 9131 - Chainage 10870 · p311:r2 · NEP source p. 311 | Paving of Unpaved Roads - Tertiary Roads | Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office | ₱37,762,000 / ₱45,826,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 9103 - Chainage 9131 · p311:r1 · NEP source p. 311 | Lanao del Norte Interior Circum. Rd (LDNICR) - (S00970MN) Chainage 9131 - Chainage 10870 · p311:r2 · NEP source p. 311 | Paving of Unpaved Roads - Tertiary Roads | Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office | ₱738,000 / ₱45,826,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 15395 - Chainage 17000 · p273:r22 · NEP source p. 273 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2098 + 500 - K2100 + 000 · p273:r23 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱39,892,000 / ₱37,257,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 15395 - Chainage 17000 · p273:r22 · NEP source p. 273 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2102 + 000 - K2103 + 000 · p273:r25 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱39,892,000 / ₱24,853,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Siocon-Sirawai-Sibuco-Limpapa Rd - Chainage 15395 - Chainage 17000 · p273:r22 · NEP source p. 273 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2103 + 000 - K2104 + 000 · p273:r26 · NEP source p. 273 | Road Widening - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱39,892,000 / ₱24,829,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 5910 - Chainage 7388 · p310:r29 · NEP source p. 310 | Lanao del Norte Interior Circum. Rd (LDNICR) - (S00969MN) Chainage 7388 - Chainage 8488 · p310:r30 · NEP source p. 310 | Paving of Unpaved Roads - Tertiary Roads | Lanao del Norte 2nd District Engineering Office / Lanao del Norte 2nd District Engineering Office | ₱38,948,000 / ₱28,987,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 16869 - Chainage 18752 · p240:r36 · NEP source p. 240 | Talobatib-Calabasa-Tulay na Lupa-Labo Circumferential Rd - (S06317LZ) Chainage 19452 - Chainage 20752 · p241:r0 · NEP source p. 241 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Camarines Norte District Engineering Office / Camarines Norte District Engineering Office | ₱38,690,000 / ₱26,712,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
FY2027 HGAB 3rd · first 50 review pairs
Explicit overlap comes first, followed by identical full titles, then the larger individual allocation. All candidate pairs are available in the downloadable JSON. The CSV exports the displayed pairs.
| First project · source | Second project · source | Official program | Implementing offices | Individual allocations pesos · first / second | Screening evidence | Stated segment evidence |
|---|---|---|---|---|---|---|
| Improvement of Road with Drainage Canal at Purok 1 to 6, Brgy. Rizal, Guagua, Pampanga, Sta.0+000 - Sta.0+850 · HB10858-3-0528-008104 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 528 | Improvement of Road with Drainage Canal at Purok 1 to 6, Brgy. Rizal, Guagua, Pampanga, Sta.0+000 - Sta.0+850 · HB10858-3-0528-008105 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 528 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Pampanga 2nd District Engineering Office / Pampanga 2nd District Engineering Office | ₱12,000,000 / ₱12,000,000 | Identical normalized full title · Qualified municipality and province agree | overlap · 0+000.00–0+850.00 |
| MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 360 - Sta. 1 + 600 · HB10858-3-0237-002312 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 237 | MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 210 - Sta. 1 + 600 · HB10858-3-0236-002303 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 236 | Construction of Missing Links/ New Roads | Central Office / Central Office | ₱260,508,000 / ₱200,000,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 1+360.00–1+600.00 |
| MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 360 - Sta. 1 + 600 · HB10858-3-0237-002312 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 237 | MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 210 - Sta. 1 + 480 · HB10858-3-0237-002311 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 237 | Construction of Missing Links/ New Roads | Central Office / Central Office | ₱260,508,000 / ₱259,408,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 1+360.00–1+480.00 |
| MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 210 - Sta. 1 + 480 · HB10858-3-0237-002311 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 237 | MSR JCT Canda-Hondagua-Roma Point Road (Roma Point Bridge), Sta. 1 + 210 - Sta. 1 + 600 · HB10858-3-0236-002303 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 236 | Construction of Missing Links/ New Roads | Central Office / Central Office | ₱259,408,000 / ₱200,000,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 1+210.00–1+480.00 |
| Guimba - Talugtug - Umingan Rd K0153+112 - K0156+000, K0159+000 - K0160+080 · HB10858-3-0139-000571 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 139 | Guimba - Talugtug - Umingan Rd, K0153 + 112 - K156 + 000 · HB10858-3-0139-000570 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 139 | Preventive Maintenance - Tertiary Roads | Central Office / Central Office | ₱82,500,000 / ₱76,600,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 153+112.00–156+000.00 |
| Construction of Concrete Road, Sta. 0+130 - Sta. 1+380, Barangay Liberty, Ormoc City, Leyte · HB10858-3-0595-009544 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 595 | Construction of Concrete Road, Sta. 0+130 - Sta. 1+630, Barangay Liberty, Ormoc City, Leyte · HB10858-3-0595-009547 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 595 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Leyte 4th District Engineering Office / Leyte 4th District Engineering Office | ₱50,000,000 / ₱50,000,000 | Similar title with explicit chainage overlap · Qualified municipality and province agree | overlap · 0+130.00–1+380.00 |
| Siocon-Sirawai-Sibuco-Limpapa Rd - K2105 + 000 - K2107 + 696 · HB10858-3-0137-000535 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 137 | Siocon-Sirawai-Sibuco-Limpapa Rd - K2108 + (-448) - K2109 + 000 · HB10858-3-0137-000536 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 137 | Preventive Maintenance - Secondary Roads | Zamboanga del Norte 4th District Engineering Office / Zamboanga del Norte 4th District Engineering Office | ₱40,425,000 / ₱21,720,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 2107+552.00–2107+696.00 |
| Bacolod South Rd (Kabankalan-Hinobaan Section) - K0109 + 001 - K0110 + 683, K0115 + 879 - K0115 + 996 · HB10858-3-0164-001009 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 164 | Bacolod South Rd (Kabankalan-Hinobaan Section) - K0105 + 1513 - K0105+1952, K0108 + 588 - K0108 + 1013 · HB10858-3-0164-001008 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 164 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Negros Occidental 3rd District Engineering Office / Negros Occidental 3rd District Engineering Office | ₱38,283,000 / ₱18,144,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 109+001.00–109+013.00 |
| Bacnotan-Luna-Balaoan Rd - K0306 + 261 - K0307 + 714 · HB10858-3-0143-000637 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 143 | Bacnotan-Luna-Balaoan Rd - K0306 + 007 - K0307 + 704 · HB10858-3-0143-000638 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 143 | Preventive Maintenance - Tertiary Roads | La Union 1st District Engineering Office / La Union 1st District Engineering Office | ₱36,000,000 / ₱22,536,000 | Similar title with explicit chainage overlap · Same implementing office only; geographic identity unverified | overlap · 306+261.00–307+704.00 |
| Construction of Road (Purok 9), Stimson Abordo, Sta. 0+000 - Sta. 0+500, Ozamiz City, Misamis Occidental · HB10858-3-0614-009946 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 614 | Construction of Road (Purok 8), Stimson Abordo, Sta. 0+000 - Sta. 0+350, Ozamiz City, Misamis Occidental · HB10858-3-0614-009947 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 614 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Misamis Occidenatal 2nd District Engineering Office / Misamis Occidenatal 2nd District Engineering Office | ₱15,000,000 / ₱10,000,000 | Similar title with explicit chainage overlap · Qualified municipality and province agree | overlap · 0+000.00–0+350.00 |
| Construction of Road, Sta. 0+000 - Sta. 1+050, Barangay Minuri, Jones, Isabela · HB10858-3-0499-007464 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 499 | Construction of Road, Sta. 0+000 - Sta. 0+800, Barangay Minuri, Jones, Isabela · HB10858-3-0502-007530 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 502 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Isabela 4th District Engineering Office / Isabela 4th District Engineering Office | ₱14,000,000 / ₱10,800,000 | Similar title with explicit chainage overlap · Qualified municipality and province agree | overlap · 0+000.00–0+800.00 |
| Concreting of Road (Purok 5), Barangay Demetrio Fernan, Sta. 0+000 - Sta. 0+350, Bonifacio, Misamis Occidental · HB10858-3-0614-009932 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 614 | Concreting of Road (Purok 2), Barangay Demetrio Fernan, Sta. 0+000 - Sta. 0+170, Bonifacio, Misamis Occidental · HB10858-3-0614-009931 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 614 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Misamis Occidenatal 2nd District Engineering Office / Misamis Occidenatal 2nd District Engineering Office | ₱10,000,000 / ₱5,000,000 | Similar title with explicit chainage overlap · Qualified municipality and province agree | overlap · 0+000.00–0+170.00 |
| Concreting of Road (Purok 6), Barangay Liloan, Sta. 0+000 to Sta. 0+250, Bonifacio, Misamis Occidental · HB10858-3-0613-009926 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 613 | Concreting of Road (Purok 5), Barangay Liloan, Sta. 0+000 to Sta. 0+250, Bonifacio, Misamis Occidental · HB10858-3-0613-009927 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 613 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Misamis Occidenatal 2nd District Engineering Office / Misamis Occidenatal 2nd District Engineering Office | ₱7,500,000 / ₱7,500,000 | Similar title with explicit chainage overlap · Qualified municipality and province agree | overlap · 0+000.00–0+250.00 |
| Construction of Multi-Purpose Building, Barangay Dela Paz, Biñan City, Laguna · HB10858-3-0641-010432 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 641 | Construction of Multi-Purpose Building, Barangay Dela Paz, Binan City, Laguna · HB10858-3-0773-013076 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 773 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Laguna 2nd District Engineering Office | ₱100,000,000 / ₱30,000,000 | Identical normalized full title · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building, Barangay Asinan Proper , Subic, Zambales (14.901831, 120.232244) · HB10858-3-0636-010364 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 636 | Construction of Multi-Purpose Building Barangay Asinan-Proper, Subic, Zambales (14.892332, 120.226488) · HB10858-3-0637-010388 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 637 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Central Office | ₱400,000,000 / ₱100,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Mauban Bypass Road (Bridge 3), Mauban, Quezon · HB10858-3-0219-001997 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 219 | Mauban Bypass Road (Bridge 4), Mauban, Quezon · HB10858-3-0219-001998 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 219 | Construction of By-Pass and Diversion Roads | Central Office / Central Office | ₱150,000,000 / ₱60,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 3 + 500 to Chainage 7 + 000 · HB10858-3-0158-000905 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 200 to Chainage 3 + 500 · HB10858-3-0158-000904 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Central Office / Central Office | ₱100,000,000 / ₱90,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 3 + 500 to Chainage 7 + 000 · HB10858-3-0158-000905 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 7 + 000 to Chainage 8 + 200 · HB10858-3-0158-000906 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Central Office / Central Office | ₱100,000,000 / ₱30,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 3 + 500 to Chainage 7 + 000 · HB10858-3-0158-000905 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 9 + 600 to Chainage 12 + 085 · HB10858-3-0158-000907 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Central Office / Central Office | ₱100,000,000 / ₱70,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18900 - Chainage 19007 · HB10858-3-0182-001322 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 182 | Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 18000 - Chainage 18070 · HB10858-3-0182-001321 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 182 | Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads | Central Office / Central Office | ₱100,000,000 / ₱75,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Construction of of Multi-Purpose Building, Barangay San Placido, Roxas, Isabela · HB10858-3-0635-010355 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-purpose building, Barangay San Placido, Roxas, Isabela (17.146472, 121.597778) · HB10858-3-0706-011702 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 706 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Isabela 2nd District Engineering Office | ₱100,000,000 / ₱50,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building, Barangay San Nicolas, Castillejos, Zambales (14.916039 ,120.199434) · HB10858-3-0636-010360 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 636 | Construction of Multi-Purpose Building, Barangay San Nicolas, Castillejos, Zambales (14.914680 ,120.201633) · HB10858-3-0749-012581 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 749 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Zambales 2nd District Engineering Office | ₱100,000,000 / ₱50,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Rehabilitation of Multi-Purpose Building, Barangay San Juan, Castillejos, Zambales (14.933128 ,120.200506) · HB10858-3-0636-010361 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 636 | Rehabilitation of Multi-Purpose Building, Barangay San Juan, Castillejos, Zambales (14.9322, 120.1999) · HB10858-3-0636-010362 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 636 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Central Office | ₱100,000,000 / ₱100,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building, Barangay San Agustin, Castillejos, Zambales (14.933202 ,120.196721) · HB10858-3-0636-010363 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 636 | Construction of Multi-Purpose Building, Barangay San Agustin, Castillejos, Zambales (14.933857 ,120.197857) · HB10858-3-0749-012580 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 749 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Zambales 2nd District Engineering Office | ₱100,000,000 / ₱50,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building 3, Barangay San Fabian, Echague, Isabela · HB10858-3-0635-010346 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela · HB10858-3-0635-010353 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Central Office | ₱95,000,000 / ₱75,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building 3, Barangay San Fabian, Echague, Isabela · HB10858-3-0635-010346 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-Purpose Building 2, Barangay San Fabian, Echague, Isabela · HB10858-3-0717-011920 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 717 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Isabela 4th District Engineering Office | ₱95,000,000 / ₱50,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 200 to Chainage 3 + 500 · HB10858-3-0158-000904 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 7 + 000 to Chainage 8 + 200 · HB10858-3-0158-000906 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Central Office / Central Office | ₱90,000,000 / ₱30,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 200 to Chainage 3 + 500 · HB10858-3-0158-000904 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 9 + 600 to Chainage 12 + 085 · HB10858-3-0158-000907 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Central Office / Central Office | ₱90,000,000 / ₱70,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Construction of Bridge, Sta. Lucia Matua, Masantol, Pampanga · HB10858-3-0421-005886 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 421 | Construction of Road, Sta. Lucia Matua, Masantol, Pampanga · HB10858-3-0527-008079 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 527 | BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities | Central Office / Pampanga 1st District Engineering Office | ₱90,000,000 / ₱5,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852° · HB10858-3-0635-010341 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45432°,121.96467° · HB10858-3-0635-010342 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Central Office | ₱90,000,000 / ₱60,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852° · HB10858-3-0635-010341 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45195°, 121.96832° · HB10858-3-0698-011536 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 698 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Batanes District Engineering Office | ₱90,000,000 / ₱5,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852° · HB10858-3-0635-010341 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45315°, 121.96429° · HB10858-3-0699-011544 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 699 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Batanes District Engineering Office | ₱90,000,000 / ₱15,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852° · HB10858-3-0635-010341 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45163°,121.96492° · HB10858-3-0699-011547 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 699 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Batanes District Engineering Office | ₱90,000,000 / ₱10,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes, 20.45110°, 121.96852° · HB10858-3-0635-010341 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-Purpose Building, Barangay San Antonio, Basco, Batanes · HB10858-3-0699-011554 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 699 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Batanes District Engineering Office | ₱90,000,000 / ₱10,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1848 + 093 - K1850 + 572 · HB10858-3-0114-000075 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 114 | Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd · HB10858-3-0114-000074 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 114 | Preventive Maintenance - Primary Roads | Central Office / Central Office | ₱89,658,000 / ₱83,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd · HB10858-3-0114-000074 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 114 | Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1874 + 687 - K1883 + 420 · HB10858-3-0114-000076 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 114 | Preventive Maintenance - Primary Roads | Central Office / Central Office | ₱83,000,000 / ₱72,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Jolo-Indanan-Parang-Silangkan Road (S00005SL), Chainage 22 + 000 to Chainage 25 + 000 · HB10858-3-0158-000903 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Jolo-Indanan-Parang-Silangkan Road (S00005SL), Chainage 19 + 350 to Chainage 22 + 000 · HB10858-3-0158-000902 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Central Office / Central Office | ₱80,000,000 / ₱70,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Construction of Groundsill along General Trias Retarding Basin II, General Trias, Cavite · HB10858-3-0308-003678 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 308 | Construction of Groundsill along General Trias Retarding Basin I, General Trias, Cavite · HB10858-3-0347-004416 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 347 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems | Central Office / Cavite 1st District Engineering Office | ₱80,000,000 / ₱30,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Flood Control Structure, Baybay Sapa (Upstream), Station 0+365 - Station 1+215, Barangay Mayamot, Antipolo City, Rizal · HB10858-3-0307-003649 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 307 | Construction of Flood Control Structure, Baybay Sapa (Upstream), Station 1+215 Station 2+065, Barangay Mayamot, Antipolo City, Rizal · HB10858-3-0307-003650 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 307 | Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems | Central Office / Central Office | ₱75,000,000 / ₱75,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | incomplete · |
| Construction of Multi-Purpose Building, Barangay San Fabian, Echague, Isabela · HB10858-3-0635-010353 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 635 | Construction of Multi-Purpose Building 2, Barangay San Fabian, Echague, Isabela · HB10858-3-0717-011920 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 717 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Isabela 4th District Engineering Office | ₱75,000,000 / ₱50,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction (Completion) of Multi-Purpose Building, Barangay Dinarayat, Talavera, Nueva Ecija, 15.556002, 120.928936 · HB10858-3-0636-010373 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 636 | Construction (Completion) of Multi-Purpose Building, Barangay Dinarayat, Talavera, Nueva Ecija, 15.556581, 120.924814 · HB10858-3-0737-012321 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 737 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Nueva Ecija 1st District Engineering Office | ₱75,000,000 / ₱3,500,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Construction of Multi Purpose Building, Barangay Banga Pantar, Marantao, Lanao Del Sur · HB10858-3-0650-010597 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 650 | Construction of Multi Purpose Building, Banga Pantar, Marantao, Lanao del Sur · HB10858-3-0651-010609 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 651 | BIP - Multi-Purpose Buildings/ Facilities to support Social Services | Central Office / Central Office | ₱75,000,000 / ₱75,000,000 | Similar title · funded segment unresolved · Qualified municipality and province agree | not stated · |
| Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 9 + 600 to Chainage 12 + 085 · HB10858-3-0158-000907 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Jolo Port-Bud Daho-Romadier Road (S00003SL), Chainage 7 + 000 to Chainage 8 + 200 · HB10858-3-0158-000906 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 158 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Central Office / Central Office | ₱70,000,000 / ₱30,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | incomplete · |
| Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 1287 - Chainage 2288 · HB10858-3-0156-000881 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 156 | Cabutagan-Haluban-Sooc Rd - (S03580LZ) Chainage 287 - Chainage 1287 · HB10858-3-0156-000882 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 156 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | Central Office / Central Office | ₱65,065,000 / ₱65,000,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433 · HB10858-3-0167-001051 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302 · HB10858-3-0167-001052 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Central Office / Central Office | ₱60,855,000 / ₱60,854,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433 · HB10858-3-0167-001051 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131 · HB10858-3-0167-001057 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Central Office / Central Office | ₱60,855,000 / ₱55,854,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 12604 - Chainage 15433 · HB10858-3-0167-001051 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960 · HB10858-3-0167-001058 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Central Office / Central Office | ₱60,855,000 / ₱60,855,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960 · HB10858-3-0167-001058 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302 · HB10858-3-0167-001052 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Central Office / Central Office | ₱60,855,000 / ₱60,854,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 21131 - Chainage 23960 · HB10858-3-0167-001058 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131 · HB10858-3-0167-001057 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Central Office / Central Office | ₱60,855,000 / ₱55,854,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
| Basud-Lanot Rd - (S06300LZ) Chainage 15433 - Chainage 15448, Chainage 15488 - Chainage 18302 · HB10858-3-0167-001052 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Basud-Lanot Rd - (S06300LZ) Chainage 18302 - Chainage 19255, Chainage 19270 - Chainage 19291, Chainage 19307 - Chainage 20032, Chainage 20114 - Chainage 20179, Chainage 20231 - Chainage 20428, Chainage 20446 - Chainage 21131 · HB10858-3-0167-001057 · 3- HB 10858 FOR 3RD READING VOL I-C .pdf · p. 167 | Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | Central Office / Central Office | ₱60,854,000 / ₱55,854,000 | Similar title · funded segment unresolved · Same implementing office only; geographic identity unverified | not stated · |
Methodology and exclusions
Compare distinct allocation occurrence IDs within each stage only. FAPs and untrusted NEP primary titles excluded. Same normalized official PAP and either qualified municipality/province or same implementing office required. At least three shared distinctive nonnumeric title tokens required. Same base title after trailing geographic metadata removal, or ≥0.94 SequenceMatcher similarity with qualified municipality/province AND identical distinctive token sets, produces a candidate. Changed route-endpoint or other distinctive scope tokens veto even when text similarity is high. Direction, qualified-location and tranche conflicts veto. Explicit disjoint ranges veto. No amount-equality requirement. Missing chainage never proves scope overlap.
- Matching allocation occurrences does not establish duplicate contracts, duplicate payment, fraud or authorship. Different engineering components and legitimate amendments can share titles.
- Office-only agreement is weaker than site evidence. Unresolved locations are never inferred from similar names.
- Pair counts are not project counts: three linked records produce three pairs. Distinct occurrence counts are shown separately; amounts are not summed as loss.
- Exact official PAP blocking, trusted-title requirements and conservative location rules miss possible cross-program, paraphrased or unresolved duplicates. No flag is not clearance.
- Tranche differences are excluded from this conservative queue, not certified as legitimate. Missing chainage requires source and engineering-scope review.
- NEP baseline includes source records outside the API. Its documented source-title confidence limits remain applicable.
| Stage | Excluded records or vetoed candidate comparisons | Count |
|---|---|---|
| FY2027 NEP | genericTitleExcluded | 753 |
| FY2027 NEP | unresolvedContextExcluded | 8 |
| FY2027 NEP | untrustedTitleExcluded | 13 |
| FY2027 NEP | fapExcluded | 25 |
| FY2027 NEP | disjointChainageVeto | 1235 |
| FY2027 NEP | distinctiveScopeTokenVeto | 9484 |
| FY2027 NEP | locationOrDirectionVeto | 17 |
| FY2027 HGAB 3rd | fapExcluded | 29 |
| FY2027 HGAB 3rd | genericTitleExcluded | 921 |
| FY2027 HGAB 3rd | disjointChainageVeto | 1200 |
| FY2027 HGAB 3rd | distinctiveScopeTokenVeto | 30619 |
| FY2027 HGAB 3rd | locationOrDirectionVeto | 36 |
| FY2027 HGAB 3rd | trancheVeto | 3 |
Download every candidate pair, original titles, source IDs, amounts and input hashes
Potential FMR repeats: FY2027 HGAB vs FY2025 GAA
FY2027 DA FMR candidates from HGAB against available FY2025 enacted GAA lines. The workspace has FY2026 HGAB amendment schedules, but not FY2026 enrolled-copy GAA line items for DA/FMR or NIA; the HGAB schedules are excluded here. The table keeps high name matches (90%). Across categories, explicit opposing directions (East/West, North/South, Norte/Sur, Oriental/Occidental) are excluded. Different package, phase, stage, lot or segment labels require scope review. They may identify legitimate separate work or changes in how the same work is described, so those candidates stay visible for review. Check whether stated chainage overlaps. Lower ranked candidates are in the CSV. Similarity is a screening aid, not proof of the same project: verify location, scope, phase, and amounts against the source. Amounts and differences are in pesos.
| FY2027 line item | FY2027 amount | Compared with | Closest prior-year line | FY2027 chainage | Prior chainage | Chainage / tranche check | Prior amount | Difference | Name match | Prior source |
|---|---|---|---|---|---|---|---|---|---|---|
| Construction of Brgy. Alangilan FMR, Brgy. Alangilan, Bacolod City | ₱15,000,000 | 2027 | Concreting of Brgy. Alangilan FMR Phase I, Brgy. Alangilan, Bacolod City | not stated · Tranche info: Prior Phase 1 only | ₱15,000,000 | ₱0 | 100% | GAA-2025 · Department of Agriculture (DA) · Office of the Secretary | ||
| Construction of Brgy. Granada FMR, Brgy. Granada, Bacolod City, Negros Occidental | ₱30,000,000 | 2027 | Concreting of Brgy. Granada FMR Phase II, Brgy. Granada, Bacolod City, Negros Occidental | not stated · Tranche info: Prior Phase 2 only | ₱15,000,000 | +₱15,000,000 | 100% | GAA-2025 · Department of Agriculture (DA) · Office of the Secretary | ||
| Construction of Brgy. Sudlon I FMR, Brgy. Sudlon I, Cebu City, Cebu | ₱15,000,000 | 2027 | Concreting of Brgy. Sudlon II FMR (Phase II), Brgy. Sudlon II, Cebu City, Cebu | not stated · Tranche info: Prior Phase 2 only | ₱15,000,000 | ₱0 | 97% | GAA-2025 · Department of Agriculture (DA) · Office of the Secretary | ||
| Construction of Brgy. Taguranao FMR, Brgy. Taguranao, Matalam, Cotabato | ₱10,000,000 | 2027 | Concreting of FMR at Brgy. Taguranao, Matalam, Cotabato | not stated | ₱10,000,000 | ₱0 | 94% | GAA-2025 · Department of Agriculture (DA) · Office of the Secretary |
Full top-three match candidates: download the review CSV. Coverage: FY2025 uses the local enacted GAA budget file; FMR is limited to DA and NIA irrigation to the NIA agency. FY2026 GAA line-item sources for these schedules are not present in the current workspace.
Potential NIA irrigation repeats: FY2027 HGAB vs FY2025 GAA
FY2027 named NIA project candidates from HGAB against available FY2025 enacted GAA NIA lines. The workspace has FY2026 HGAB amendment schedules, but not FY2026 enrolled-copy GAA line items for DA/FMR or NIA; the HGAB schedules are excluded here. The table keeps high name matches (90%). Across categories, explicit opposing directions (East/West, North/South, Norte/Sur, Oriental/Occidental) are excluded. Different package, phase, stage, lot or segment labels require scope review. They may identify legitimate separate work or changes in how the same work is described, so those candidates stay visible for review. Check whether stated chainage overlaps. Lower ranked candidates are in the CSV. Similarity is a screening aid, not proof of the same project: verify location, scope, phase, and amounts against the source. Amounts and differences are in pesos.
| FY2027 line item | FY2027 amount | Compared with | Closest prior-year line | FY2027 chainage | Prior chainage | Chainage / tranche check | Prior amount | Difference | Name match | Prior source |
|---|---|---|---|---|---|---|---|---|---|---|
| Bagtingon Small Reservoir Irrigation Project (SRIP), Marinduque | ₱300,000,000 | 2027 | Bagtingon Small Reservoir Irrigation Project (SRIP), Marinduque | not stated | ₱100,000,000 | +₱200,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Bayabas Irrigation Project, Bulacan | ₱100,000,000 | 2027 | Bayabas Irrigation Project, Bulacan | not stated | ₱300,000,000 | ₱-200,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Cabacanan Small Reservoir Irrigation Project (SRIP), Ilocos Norte | ₱100,000,000 | 2027 | Cabacanan Small Reservoir Irrigation Project (SRIP), Ilocos Norte | not stated | ₱100,000,000 | ₱0 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Cabangan Small Reservoir Irrigation Project (SRIP), Zambales | ₱100,000,000 | 2027 | Cabangan Small Reservoir Irrigation Project (SRIP), Zambales | not stated | ₱500,000,000 | ₱-400,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Cabano Small Reservoir Irrigation Project (SRIP), Guimaras | ₱130,000,000 | 2027 | Cabano Small Reservoir Irrigation Project (SRIP), Guimaras | not stated | ₱100,000,000 | +₱30,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Calapangan Small Reservoir Irrigation Project (SRIP), Cagayan | ₱300,000,000 | 2027 | Calapangan Small Reservoir Irrigation Project (SRIP), Cagayan | not stated | ₱400,000,000 | ₱-100,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Dumuloc Small Reservoir Irrigation Project (SRIP), Pangasinan | ₱400,000,000 | 2027 | Dumuloc Small Reservoir Irrigation Project (SRIP), Pangasinan | not stated | ₱50,000,000 | +₱350,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Ilocos Norte - Ilocos Sur - Abra Irrigation Project, Stage 2 | ₱1,000,000,000 | 2027 | Ilocos Norte - Ilocos Sur - Abra Irrigation Project, Stage 2 | not stated | ₱7,985,000,000 | ₱-6,985,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Lower Apayao River Irrigation Project, Apayao | ₱100,000,000 | 2027 | Lower Apayao River Irrigation Project, Apayao | not stated | ₱100,000,000 | ₱0 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| San Felipe Small Reservoir Irrigation Project (SRIP), La Union | ₱100,000,000 | 2027 | San Felipe Small Reservoir Irrigation Project (SRIP), La Union | not stated | ₱50,000,000 | +₱50,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration | ||
| Tulunan Small Reservoir Irrigation Project (SRIP), North Cotabato | ₱850,000,000 | 2027 | Tulunan Small Reservoir Irrigation Project (SRIP), North Cotabato | not stated | ₱300,000,000 | +₱550,000,000 | 100% | GAA-2025 · Budgetary Support to Government Corporations (BSGC) · National Irrigation Administration |
Full top-three match candidates: download the review CSV. Coverage: FY2025 uses the local enacted GAA budget file; FMR is limited to DA and NIA irrigation to the NIA agency. FY2026 GAA line-item sources for these schedules are not present in the current workspace.
Repeat denominators and allocation clustering
737 comparison pairs represent 686 distinct FY2027 proposals carrying ₱27.260B. The current allocation is counted once per proposal; it is not a loss estimate and is not summed across prior years.
| Chainage evidence | Comparison pairs |
|---|---|
| not applicable | 374 |
| incomplete | 209 |
| not stated | 133 |
| overlap | 21 |
21 distinct proposals have at least one explicitly overlapping stated segment. Overlap is a strong reason to inspect work descriptions, but widening, rehabilitation, bridge approaches or different components can legitimately use the same chainage. 11 pairs state a tranche on only one side.
Name similarity is a screening result. Missing chainage does not imply overlapping work. Different barangays, municipalities, provinces, directions and packages must remain distinct. Retrieve contracts, quantities, completion reports and maps before alleging duplicate funding.