DepEd school operations · 3rd vs 2nd Reading
10,721school allocation lines retained at the same amounts
₱102.67Bschedule total in the 3rd reading
2nd-reading total₱102.67B10,721 school lines
Allocation changes0between the two readings
These are school operating allocations, not a school construction-project list. Compare schedule fields and source pages before interpreting the unchanged total.
This schedule allocates school operating budgets (junior-high personnel services, junior-high MOOE, junior-high total, and senior-high MOOE). It is not a school construction-project list. Compare bill-stage changes by school and verify table rows in Volume I-B before interpreting a change.
Largest school allocation changes
School-level allocation changes
| Status | Region | School division / SDO | Secondary school | 2nd total | 3rd total | Change | Page |
|---|
Showing up to 500 filtered schools at a time; CSV exports all filtered rows.