FY 2027 · HB 10858 · 2nd and 3rd Reading schedules

NIA FY2027 Irrigation Program

Review the detailed NIA irrigation works schedule, compare 2nd and 3rd readings, and inspect title matches against 2025 GAA. Amounts and titles require source-page verification.

NIA irrigation appendix · 3rd vs 2nd Reading
423irrigation schedule lines retained at the same allocation
₱7.63Bschedule total in the 3rd reading
2nd-reading total₱7.63B423 lines
Allocation changes0between the two readings

This appendix is separate from NIA named projects. Matching rows show extracted schedule stability, not repeat projects across fiscal years.

This is a separate 423-row NIA irrigation-program appendix, apart from the 32-item named-project schedule in the main NIA report. It is a candidate extraction; verify title and amount on the cited page. Potential GAA matches are review leads, not confirmed repeats.

2nd vs 3rd reading allocations

3rd-reading candidate matches by title-screen class

Potential year-on-year matches · 3rd HGAB vs 2025 GAA

NIA project lineRepresentative(s) by named project location3rd HGABFY2025 GAA candidate2025 GAAMatchChainageTrancheSource pages

Full irrigation-program line list

Project / workRepresentative(s) by named project locationStation / chainageAmountEdition / page2nd to 3rd change